16/01/08 |
High-BTU Coal Gasification Processes
Advanced Gasification Projects - Topical Report
Surface Coal Gasification – Topical Report |
09/07/06 |
|
09/06/06 |
Six New Reports
Proceedings of the Workshop on Hydrogen Processing Mixing and
Scale-Up Problems - December 13-15, 1978.
ARPA Workshop on needs of the Department of Defense for
Catalysis. Volume I Summary of Results of Particular Interest
to the DOD December 1983.
ARPA Workshop on Needs of the Department of Defense for
Catalysis. Volume II Proceedings. November 5-6, 1973.
Survey of Foreign Scientific and Technical Literature. Current
Information on Lubrication and Fuel Technology - November 1,
1967.
High
Pressure Hydrogenation of Heavy Petroleum Distillates - May
1963.
Supplemental Studies for Anthracite Coal Gasification to Produce
Fuels and Chemicals. Nepgas Project. Volume II. |
09/05/06 |
Three New Reports
Crow Tribe of Indians - Synfuels Feasibility Study - August,
1982. Process Design and Cost Estimate Volume II, Book II,
Sections 6.3 and 6.4.
Optimization of Coal Gasification Processes. Volume 1, Chapters
I through VII - April 1972.
Coal to Methanol Feasibility Study Beluga Methanol Project -
Volume IV. Environmental, Final Report - September 1981. |
09/01/06 |
Two New Reports
Medium Btu Coal Gasification Project, Plant Design. December
1981.
Feasibility
Study for Alternative-Fuels Production: Fluidized-Bed
Gasification of Rice Hulls. Executive Summary March 1982. |
08/31/06 |
Four New Reports
Ammonia from Coal - Coal Technology 79, 2nd International Coal
Utilization Conference and Exhibition, November 6 - 8, 1979.
Preliminary Design and Assessment of a 12,500-BPD
Coal-to-Methanol-to-Gasoline Plant. Technical Support Report -
July 1982. Deliverable 36-1 (inserted verbatim).
The
Design, Construction, and Operation of a Process-Development
Unit for the High-Rate, Entrained-Flow Coal-Gasification
Process. Quarterly Technically Progress Report No. 3 - October
to December 1981.
Coal to Methanol Feasibility Study Beluga Methanol Project.
Final Report. Volume I Technical - September 1981. |
08/30/06 |
Two New Reports
Crow Tribe of Indians - Process Design and Cost Estimate Book I,
Sections 1.0 through 6.2. Synfuels Feasibility Study - August
1982.
Crow Tribe of Indians - Synfuels Feasibility Study. Volume II -
August, 1982. Process Design and Cost Estimate Book III: Section
6.5 through 6.9. |
08/29/06 |
Seven New Reports
Feed
System Innovation for Gasification of Locally Economical
Alternative Fuels (FIGLEAF) Final Report, Includes Annual
Technical Report for period October 2001 - November 2002
TVA Coal-Gasification Commercial Demonstration Plant Project.
Volume 2. Basis of Study Assessments and Process Selection.
Final Report - November 1, 1980.
New
England Energy Park Feasibility Study for Alternative Fuels
Production. Final Report - June 23, 1982.
Steel Point
Coal Gasification / Combined Cycle Study, Bridgeport
Low/Medium BTU
Coal Gasification Assessment Program for Potential Users in New
Jersey. Executive Summary - May 1981.
Process Engineering and Mechanical Design Reports. Volume II of
V. Deliverable 14 - August 1982. Preliminary Design and
Assessment of a 50,000 BPD Coal-to-Gasoline-to-Methanol Plant.
Process Engineering and Mechanical Design Reports. Volume II of
IV. August 1982. Deliverable 14B. Preliminary Design and
Assessment of a 12,500 BPD Coal-to-Gasoline-to-Methanol Plant -
September 2, 1982. |
08/18/06 |
Two New Reports
TVA Coal-Gasification Commercial Demonstration
Plant Project. Volume 6. Plant Based on Gasifier. Final Report -
November 1, 1980.
Coastal Bend. Feasibility Study. Final Report - March 30, 1982. |
08/17/06 |
One New Report
Liquid-Phase Methanol Process Development Unit:
Installation, Operation, and Support Studies. Technical Progress
Report No. 2 - 1 January 1982 31 March 1982. |
08/14/06 |
Two New Reports
Coal to Methanol Feasibility Study Beluga Methanol Project.
Final Report. Volume II Technical - September 1981.
Assessment of Advanced Coal-Gasification
Processes - June 1981. |
08/11/06 |
Four New Reports
TVA Coal-Gasification Commercial Demonstration
Plant Project. Volume 5. Plant Based on Koppers-Totzek Gasifier.
Final Report - November 1, 1980.
TVA Coal-Gasification. Commercial Demonstration Plant Project.
Volume 4. Plant Based on Babcock & Wilcox Gasifier. Final Report
- November 1, 1980.
Feasibility and Economic Study of Medium-BTU Coal
Gas Blended with High-BTU By-product Gas as an Industrial Energy
Source at Billings, Montana. Final Report - May 1981.
A Study
of the Catalytic Conversion of Synthesis Gas to
Low-Molecular-Weight Hydrocarbons. Major Subject: Chemical
Engineering - August 1981. |
08/07/06 |
Three New Reports
Crow Tribe of Indians: Synfuels Feasibility
Study. Volume III. Part A: Financial Analysis. Part B: Legal
Analysis.
Crow Tribe of Indians. Synfuels Feasibility
Study. Volume 1. Executive Summary - August, 1982.
Crow Tribe of Indians Synfuels Feasibility Study.
Volume IV Part A: Environmental. |
08/04/06 |
Two New Reports
Philadelphia Gas Works Medium-BTU Coal Gasification Project.
Executive Summary - December 1981.
Economics of the Texaco Gasification Process for
Fuel-Gas Production. Final Report - July 1982.
|
08/03/06 |
Three New Reports
Feasibility Study for a Coal-Sourced Methanol
Project. Final Report - January 29, 1981.
TVA Coal-Gasification Commercial Demonstration
Plant Project. Volume 1. Plant Based on Executive Overview
(Summary). Final Report - November 1, 1980.
TVA Coal-Gasification Commercial Demonstration
Plant Project. Volume 2. Basis of Study Assessments and Process
Selection. Final Report - November 1, 1980.
Iron-Induced Deactivation of Supported Nickel
Methanation Catalysts - 1978. |
08/02/06 |
One New Report
Coal to Methanol Feasibility Study - Beluga
Methanol Project. Final Report. Volume III Technical - September
1981. |
08/01/06 |
Two New Reports
Technical Evaluation of Wood Gasification. Final
Report - August 1982.
Verification of the Foreign Synfuels
Industrialization Experience Final Report - September 1981 |
07/31/06 |
Four New Reports
Hypersorption Process for Separation of
Components of a Medium-BTU Gas. Feasibility Study - Final Report
- July 17, 1982.
Cool-Water Coal-Gasification Program. First
Annual Progress Report. Project 1459 - Interim Report 1982.
U.S. Coal Test Program on BGC-Lurgi Slagging
Gasifier. Final Report - August 1981.
Environmental Assessment Philadelphia Gas Works.
Medium-BTU Coal Gasification Project December 1981. |
07/28/06 |
Methanation Plant Design for HTGR Process Heat -
September 1981. |
07/27/06 |
Twos New Report
Kinetics of Slurry Phase Fischer-Tropsch
Synthesis. Contractors Review Meeting Presentation, June 2004.
Conversion of Biomass Materials into Gaseous
Products. Phase II Interim Technical Report for the Bench Scale
Pilot Plant Studies - August 1978. |
07/25/06 |
One New Report
Preliminary Design and Assessment of a 50,000 BPD
Coal-to-Methanol-to-Gasoline Plant. Technical Support Plan. |
07/24/06 |
Three New Reports
Methanol Production from Eucalyptus Wood Chips.
Final Report - June 1982.
The Design, Construction, and Operation of a
Process-Development Unit for the High-Rate, Entrained-Flow
Coal-Gasification Process. Quarterly Technical Progress Report
No. 5. April June 1982.
Crow Tribe of Indians - Synfuels Feasibility
Study, August, 1982. Volume IV, Part B - Health and Safety and
Part C - Socioeconomics. |
07/22/06 |
Five New Reports
Energy Inputs and Outputs of Fuel-Alcohol
Production. Summary Volume, Final Report - April, 1982
A Novel Approach to Coal Gasification Using
Chemically Incorporated Catalysts - Phase II. Final Report -
May, 1978 to June, 1981.
The Fertilizer Industry Round Table - Ammonia
from Coal Projects. Tennessee Valley Authority. A Technical and
Economic Review of Coal-Based Ammonia Production - October 25,
1977.
Factored Estimates for Eastern Coal Commercial
Concepts. Interim Report Joint Department of Energy/Gas
Research Institute Coal Gasification Program - September 1978. |
07/19/06 |
Two New Reports
East Texas Feasibility Study. Final Report -
Volume 1, March 30, 1982.
The Design, Construction, and Operation of a
Process-Development Unit for the High-Rate, Entrained-Flow
Coal-Gasification Process. Quarterly Technical Progress Report
No. 2. July September 1981. |
07/18/06 |
Six New Reports
The Design, Construction, and Operation of a
Process-Development Unit for the High-Rate Entrained-Flow Coal
Gasification Process. Quarterly Technical Progress Report No. 1.
April June 1981.
Liquid Phase Methanol Process Development Unit:
Installation, Operation, and Support Studies. Technical Progress
Report No. 1 - September 28 to December 31, 1981.
Coal to Methanol Feasibility Study, Beluga
Methanol Project. Final Report / Executive Review - September
1981.
Surface Coal Gasification. Topical Report -
October 1980.
Process Selection and Investment Analysis,
Methanation Facility for Purox Pyrolysis System Off-Gas -
September 1981.
A Framework for Evaluating Synthetic Fuels
Commercialization Proposals. Volume I: Coal Gasification. |
07/17/06 |
Three New Reports
High Mass Flux Coal Gasifier. Final Report Phase
III May 1981.
Mass-Spectrometric Measurements of Enhanced
Methanation Activity over Cobalt and Nickel Foils. Progress
Report - December 20, 1976.
Task 3 Gasification Plant Cost and Performance
Optimization. Final Report May 2005. |
07/13/06 |
Three New Reports
Low/Medium BTU Coal Gasification Assessment of
Central Plant for the City of Philadelphia, Pennsylvania.
Executive Summary - February 1981.
Atomic-Scale Design of Iron Fischer-Tropsch
Catalysts: A Combined Computational Chemistry, Experimental, and
Microkinetic Modeling Approach. First Annual Report - March
2005.
Atomic-Scale Design of Iron Fischer-Tropsch
Catalysts: A Combined Computational Chemistry, Experimental, and
Microkinetic Modeling Approach. Second Annual Report - March
2006. |
07/12/06 |
Five New Reports
A Novel Membrane Reactor for Direct Hydrogen
Production from Coal. Quarterly Report, April 1, 2004
June 30, 2004.
Advanced-Gasification Processes. Topical Report
December 1980. Morgantown Energy Technology Center.
COthane, Methane from Waste CO. Final Technical
Report- December 1980.
Gas Reactor International Cooperative Program,
HTR-Synfuel Application Assessment - September 1979.
Recent Developments in Fluidized-Bed Methanation
Research. Ninth Synthetic Pipeline Gas Symposium, October 31
November 2, 1977. |
07/11/06 |
Four New Reports
Fuel Gas Demonstration Plant Program Small Scale
Industrial Project. Final Report. Coal Gasification Project -
2003.
Task Report - Biomass Gasification Evaluation of
Gas Turbine Combustion. Fuel Quality Assessment, Addendum to DOE
- October 13, 2003.
Preliminary Design Services: Research and
Development Report No. 114. Quarterly Report, JanuaryMarch
1978.
Proceedings of Symposium on Environmental Aspects
of Fuel Conversion Technology. VI: A Symposium on Coal-Based
Synfuels, Task No. 56. Denver, Colorado - October 26-30, 1981.
|
07/10/06 |
Two New Reports
Study of Ebullated Fluid Dynamics for H-Coal.
Quarterly Progress Report No. 10, October 1-December 31, 1982
Assessment of Trace Contaminants from a Model
Indirect Liquefaction Facility. Volume IV - Public Health
Hazards of Lurgi/Fischer-Tropsch Coal Liquefaction. January
1982. |
07/06/06 |
Four New Records
The Economical Production of Alcohol Fuels from
Coal-Derived Synthesis Gas. Quarterly Technical Progress Report
Number 9: October 1, 1993 to December 31, 1993.
The Economical Production of Alcohol Fuels from
Coal-Derived Synthesis Gas. Quarterly Technical Progress Report
Number 6 - January 1, 1993 to March 1993
An Ab Initio Approach towards Engineering
Fischer-Tropsch Surface Chemistry. Technical Progress Report:
9/11/2003 9/11/2004.
An Ab Initio Approach Towards Engineering
Fischer-Tropsch Surface Chemistry. Technical Progress Report:
9/11/2004 9/11/2005. |
07/05/06 |
Ten New Reports
Atomic-Scale Design of Iron Fischer-Tropsch Catalysts: A
Combined Computational Chemistry, Experimental, and Microkinetic
Modeling Approach. Second Annual Report - Issued March 2006.
Advanced Gasification By-Product
Utilization. Annual Technical Report for September 1, 2004 - 31
August 2005.
Advanced Gasification By-Product
Utilization. Annual Technical Report for September 1, 2003 -
August 31, 2004.
Oxygen Transport Ceramic Membranes. Quarterly
Report: July 2005 September 2005
Oxygen Transport Ceramic Membranes. Quarterly
Report: July 2004 September 2004.
Oxygen Transport Ceramic Membranes. Quarterly
Report: July 2003 September 2003.
Oxygen Transport Ceramic Membranes. Quarterly
Report: January 2003 - March 2003.
Oxygen Transport Ceramic Membranes. Quarterly
Report - May 2005 June 2005.
Oxygen Transport Ceramic Membranes. - Quarterly
Report: April 2003 June 2003.
Oxygen Transport Ceramic Membranes. Quarterly
Report: October 2003 - December 2003 - 2/1/04. |
06/30/06 |
Five New Reports
Oxygen Transport Ceramic Membranes, Quarterly
Report: January 2004 March 2004 - 5/1/04.
Oxygen Transport Ceramic Membranes, Quarterly Report: January
2006 March 2006.
Oxygen Transport Ceramic Membranes - Quarterly
Report April 2004 through June 2004.
Oxygen Transport Ceramic Membranes. Quarterly
Report: October 2005 December 2005
Equipment Design and Cost Estimation for Small
Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen
Separation Equipment. Task 1: Cost Estimates of Small Modular
Systems. Subcontractor Report - May 2006. |
06/28/06 |
Five New Reports
Equipment Design and Cost Estimation for Small
Modular Biomass Systems, Synthesis Gas Cleanup and Oxygen
Separation Equipment. Task 9: Mixed Alcohols From Syngas State
of Technology. Subcontract Report -May 2006.
Equipment Design and Cost Estimation for Small Modular Biomass
Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment.
Task 2.3: Sulfur Primer - Subcontract Report May 2006.
Equipment Design and Cost Estimation for Small Modular Biomass
Systems, Synthesis Gas Cleanup and Oxygen Separation Equipment.
Task 2: Gas Cleanup Design and Cost Estimates Wood Feedstock.
Equipment Design and Cost
Estimation for Small Modular Biomass Systems, Synthesis Gas
Cleanup and Oxygen Separation Equipment. Task 2: Gas Cleanup
Design and Cost Estimates Black Liquor Gasification.
Low-Rank Coal Research. Annual Report - July 1, 1989 through
June 30, 1990. |
06/26/06 |
Five New Reports
Conservation and Renewable Energy Program.
Bibliography 1988.
Gasification Plant Cost and Performance
Optimization. Task 1 Topical Report IGCC Plant Cost
Optimization. Volume 1 of 3 - September 1999 to January 2002.
Advanced Power Plant Development and Analyses Methodologies.
Semi-Annual Report - August 1, 2005 to January 31, 2006.
Pinon Pine Power Project. Annual Report. August
1992 1993.
Multi-Disciplinary Education and Training in
Biobased Products: Graduate Major in Bioresource Engineering.
Final Scientific Technical Report. July 1, 2001 June 30,
2005. |
06/21/06 |
Six New Reports
The Fuel Processing Research Facility A
Platform for the Conduct of Synthesis Gas Technology R&D - 2001
Fuel Flexibility in Gasification - November 2001.
Design, Synthesis, and Mechanistic Evaluation of
Iron-Based Catalysis for Synthesis Gas Conversion to Fuels and
Chemicals. Technical Progress Report. Period ending 3-31-06
(October 1, 2005 to March 31, 2006).
Highly Selective H2 Separation Zeolite Membranes
for Coal Gasification Membrane Reactor Applications. Annual
Technical Progress Report. September 2004 September 2005.
Fischer-Tropsch Synthesis in Supercritical
Fluids. Quarterly Technical Progress Report. April 1, 1993
June 30, 1993.
Fischer Tropsch Synthesis in Supercritical
Fluids. Quarterly Technical Progress Report. January 1, 1993
March 31, 1993. |
06/19/06 |
Two New Reports
Pĩnon Pine Project. Annual Report - 1995.
Fifth Annual North American Waste-to-Energy
Conference - April 1997. |
06/15/06 |
Two New Reports
Proceedings of the Coal-Fired Power Systems 94 -
Advances in IGCC and PFBC Review Meeting Volume II
Coal: Energy for the Future - May 1995. |
06/14/06 |
One New Report
Comparative Study of the Reactions of Metal
Oxides and Carbonates with H2S and SO2. Final Technical Report:
September 1990 February 1994. |
06/12/06 |
Five New Reports
Publications of Los Alamos Research 1984.
Recommendations for a National Catalysis Research
Institute. Advanced Resources for Catalysis Science. Workshop -
September 21-22, 2004.
Dumai Base Oils Project - Feasibility Study.
Final Report July 1993. Vol. I of II.
Dumai Base Oil - Feasibility Study. Final Report
- July 1993. Volume II of II.
Treatment of Mixed Wastes via Fixed Bed Gasification. Final
Report: September 30, 1996 July 30, 1998. |
06/09/06 |
Four New Reports
Slipstream Testing of Particulate Filters at the
Wabash River Coal Gasification Repowering Project. Final Report
- June 2003.
Problems Associated With Solid Wastes From Energy
Systems - September 1980.
Flow Mapping in a Gas-Solid Riser via Computer Automated
Radioactive Particle Tracking (CARPT). Final Report: May 5, 2000
May 4, 2005
Tampa Electric Company IGCC Project. Quarterly
Report: July September 1995. |
06/07/06 |
Two New Reports
Low-Rank Coal Research. Semi-Annual Report:
January 1992 June 1992.
Flue Gas Cleanup. Final Technical Progress Report
- April 1986 to December 1992. |
06/06/06 |
Five New Reports
Clean Hydrogen Technology for 3-Wheel
Transportation in India. Final Report - February 1, 2004 to
November 30, 2005.
A Framework for Evaluating the Total Value
Proposition of Clean Energy Technologies. Technical Report -
February 2006.
Novel Gas Cleaning/Conditioning for Integrated
Gasification Combined Cycle. Volume I Conceptual Commercial
Evaluation and Volume II - Process Development Unit Test
Results. Final Report - September 1, 2001 to December 31, 2005.
Comparison of Shell Middle Distillate, Premium
Diesel Fuel and Fossil Diesel Fuel with Rapeseed Oil Methyl
Ester. October 01, 2004 March 31. 2005.
The Fuel Processing Research Facility A
Platform for the Conduct of Synthesis Gas Technology R&D - 2001 |
06/05/06 |
Three New Reports
Gas Separations using Ceramic Membranes. Final
Project Report - January 2006.
C1 Chemistry for the Production of Ultra-Clean
Liquid Transportation Fuels and Hydrogen. Semi-Annual six-month
report. Research Conducted October 1, 2004-March 31, 2005.
Low-Rank Coal Research. Quarterly Report: January
March 1990. |
06/02/06 |
Seven New Reports
Advanced Sulfur Control Concepts for Hot-Gas Desulfurization
Techniques. Final Report - April 1994 to October 1998.
Assessment of
Biomass Energy Opportunities Red Lake Band of Chippewa Indians.
Final Report- September 30, 2005.
Fifteenth Symposium On Energy Engineering Sciences Proceedings,
May 14-15, 1997.
Reactive Multiphase Flow Simulation Workshop Summary - May 1995.
Novel
Technologies for Gaseous Contaminants Control. Final Report for
the Base Program - October 1, 1999 to September 30, 2001.
Advanced Turbine Systems Program Conceptual Design and Product
Development. Final Report - July 26, 1996.
Task 3.10 Gas Separation and Hot-Gas Cleanup. Topical Report -
November 1995. |
05/31/06 |
Five New Reports
Ceramic Membrane Enabling Technology for Improved IGCC
Efficiency. Final Report - September 30, 1999 to December 31,
2004.
Development of Alaskan Gas Hydrate Resources. Annual Report,
October 1986 September, 1987.
Create a Consortium and Develop
Premium Carbon Products from Coal. Annual Technical Report -
Ending May 31, 2004.
Tracy Power Station Unit No. 4. Pĩnon
Pine Power Project Public Design Report. Topical Report -
December 1994.
Pĩnon Pine Project. Annual Report - 1994. |
05/30/06 |
Eight New Reports
Task 6.5/6.7.1 Materials for Gas Separation and
Hydrogen Separation Membranes. Semi-Annual Report - July 1 to
December 31, 1997.
Life Cycle Assessment of a Biomass Gasification
Combined-Cycle System - December 1997.
Long-Term Durability Testing of Ceramic
Cross-Flow Filter. Final Report - September 29, 1987 to December
31, 1992.
Subpilot Scale Gasifier Evaluation of Ceramic
Cross Flow Filter. Final Report - February 1, 1998 to December
31, 1992.
Kinetics of Mn-Based Sorbents for Hot Coal Gas
Desulfurization. Final Technical Report. 09/15/1994 09/15/1997
Energy Program
Annual Report - 1987
Oxygen Transport Ceramic Membranes. Quarterly Report: October
2005 December 2005
Oxygen Transport Ceramic Membranes. Quarterly Report: July 2005
September 2005 |
05/24/06 |
Two New Reports
Task 3.17 Hot Gas Cleanup. Semi-Annual Report -
July 1 to December 31, 1996.
Task 3.17 Hot Gas Cleanup. Final Report -
January 1 to June 30, 1997. |
05/23/06 |
Twelve New Reports
Tampa Electric Company Polk Power Station Unit
No. 1. Preliminary Public Design Report - June 1994.
An Attrition-Resistant Zinc Titanate Sorbent For
Sulfur. Final Technical Report - September 1, 1992 through
August 21, 1993.
Lignite Testing in an Advanced High-Temperature,
High-Pressure Transport Reactor Gasifier. Final Report: For the
period November 30, 1999, through December 31, 2001)
Task 3.10 Gas Separation and Hot-Gas Cleanup.
Topical Report: August 1995.
Task 3.13 Hot-Gas Filter Testing. Semi-Annual Report: July 1
December 31, 1995
Supercritical Water Partial Oxidation: Phase 1 Pilot-Scale
Testing / Feasibility Studies - Final Report.
Advanced Turbine Systems Program Conceptual
Design and Product Development Task 8.3 Autothermal Fuel
Reformer (ATR). Topical Report - November 1996.
Fracture Behavior of Advances Ceramic Hot Gas
Filters. Final Report 1997.
Particulate Hot Gas Stream Cleanup Technical
Issues: Quarterly Report: July 1995 September 1995
Sebesta Bloomberg Biomass-to-Energy Feasibility Study. Final
Report 2002.
A Coal-Fired Power Plant with Zero Atmospheric
Emissions - 2003.
Diesel Fuel Component Contributions to Engine
Emissions and Performance: Clean Fuel Study - 1994. |
05/22/06 |
Eight New Reports
Task 6.5 Gas Separation and Hot-Gas Cleanup.
Semi-Annual Report - January 1 June 30, 1996.
ENCOAL Mild Coal Gasification Demonstration
Project. Final Design Modifications Report. Topical Report July
1997.
ENCOAL Mild Coal Gasification Demonstration
Project. Commercial Plant Feasibility Study. Topical Report:
July 1997.
ENCOAL Mild Coal Gasification Demonstration Project. Annual
Report: October 1994 September 1995.
ENCOAL Mild Coal Gasification Project Public Design and
Construction Report. Topical Report: December 1994.
Particulate Hot Gas Stream Cleanup Technical
Issues. Task 1 Assessment of Ash Characteristics. Annual Report
October 1997 September 1998 and Quarterly Report, July 1998.
Highly Selective H2 Separation Zeolite Membranes
For Coal Gasification Membrane Reactor Applications. Annual
Technical Progress Report: September 2003 September 2004.
Advanced Hydrogen Transport Membranes for Vision
21 Fossil Fuel Plants. Quarterly. July 1, 2005 - September 30,
2005. |
05/17/06 |
Five New Reports
1993 Windsor Workshop on Alternative Fuels - October 1993
Economical Production of Alcohol Fuels from
Coal-Derived Synthesis Gas. Quarterly Technical Progress Report
Number 4 - July 1, 1992 to September 30, 1992.
The Economical Production of Alcohol Fuels from
Coal-Derived Synthesis Gas. Quarterly Technical Progress Report
Number 5. Reporting Period: October 1, 1992 to December 31,
1992.
Development of Novel Water-Gas-Shift Membrane
Reactor. Final Technical Report: 10/01/2001 to 12/29/2004.
Novel Hydrogen Separation Device Development for
Coal Gasification System Applications. Final Report - August
1993. |
05/16/06 |
Ten New Reports
Particulate Hot Gas Stream Cleanup Technical
Issues. Quarterly Report. October December 1995.
Particulate Hot Gas Stream Cleanup Technical
Issues. Annual Report, October 1994 September 1995.
Particulate Hot Gas Stream Cleanup Technical Issues. Quarterly
Report. January March 1996.
Particulate Hot Gas Stream Cleanup Technical
Issues. Quarterly Report January 1 March 31, 1998.
Particulate Hot Gas Stream Cleanup Technical
Issues. Quarterly Report, April June 1995.
Particulate Hot Gas Stream Cleanup Technical
Issues. Quarterly Report. January 1999 March 1999.
Particulate Hot Gas Stream Cleanup Technical
Issues. Task 1 Assessment of Ash Characteristics. Annual Report
October 1997 September 1998 w/Quarterly Report, July 1998.
Coal & Power Systems: FY2001 Program Briefing
Eleventh Annual Conference on Fossil Energy Materials: May
20-22, 1997.
Development of and Advanced, Continuous Mild
Gasification Process for the Production of Co-Products -
September 30, 1987 to September 30, 1994
|
05/15/06 |
Four New Reports
The Economical Production of Alcohol Fuels from
Coal-Derived Synthesis Gas - January 1, 1994 to March 31, 1994
Environmental Emissions from Energy Technology
Systems: The Total Fuel Cycle - Spring 1989
Gasification Product Improvement Facility,
Environmental Report - January 1993
Gasification Product Improvement Facility (GPIF)
- Conceptual Design Report - September 1994 |
05/11/06 |
One Report
Development of OTM Syngas Process and Testing of Syngas Derived
Ultra-Clean Fuels in Diesel Engines and Fuel Cells. Final Report
- January 1, 2001 to December 31, 2004. |
05/05/06 |
Five New Reports
Development of Ceramic Membrane Reactors for High
Temperature Gas Cleanup - Final Report June 1993
Fuel-Flexible Gasification-Combustion Technology for Production
of H2 and Sequestration-Ready CO2 - Phase II. Quarterly
Technical Progress Report No. 18.
Facilitated Transport Ceramic Membranes for High-Temperature Gas
Cleanup: Final Report: February 1990 April 1994
Comparison of Lime and Iron Oxide for High Temperature Sulfur
Removal. Final Technical Report.
Particulate Hot Gas Stream Cleanup Technical
Issues. Task 1 - Assessment of Ash Characteristics. Final
Report: October 1994 September 1999 |
05/04/06 |
Four New Reports
Gasification Based Biomass Co-Firing Phase 1:
Final Report September 2002 (Revised January 2003)
Gasification Based Biomass Co-Firing Phase I. Annual Technical
Report. Reporting Period. October 2000 October 2001.
Methane
Conversion to Fuels and Chemicals: Opportunities and Approaches
- 1999
Development of Mercury and Hydrogen Chloride Emission Monitors
for Coal Gasifiers. Final Report to the National Energy
Technology Laboratory. Submitted March 9, 2001. |
05/03/06 |
Eight New Reports
Evaluation of Gasification and Novel Thermal
Process for the Treatment of Municipal Solid Waste - 1996
Separation of Fischer-Tropsch Wax Products from
Ultrafine Iron Catalyst Particles Technical Progress Report -
April 1 - September 30, 2005
Catalysis Looks to the Future - 1992
Task 6.5/6.7.1 Materials for Gas Separation and
Hydrogen Separation Membranes. Semi-Annual Report January 1
June 30, 1997
Vermont Gasifier Project: Final Report Phase 1,
July 1995
NA/CA Catalyzation of Illinois Coals for
Gasification: Final Technical Report: September 1, 1992 through
August 31, 1993
Development of Novel Copper-Based Sorbents for
Hot-Gas Cleanup. Final Technical Report: September 1, 1992 -
August 31, 1993
Development of Novel Copper-Based Sorbents for
Hot-Gas Cleanup Final Technical Report: September 1, 1991
August 31, 1992
|
05/01/06 |
Yosemite Waters Vehicle Evaluation Report: Final Reports - 2002 |
04/28/06 |
Five New Reports
Summary Report: Trace Substance Emissions From A
Coal-Fired Gasification Plant. October 16, 1996.
The
Economical Production Of Alcohol Fuels From Coal-Derived
Synthesis Gas. Quarterly Technical Progress Report Number 8.
Reporting Period: July 1, 1993 to September 30, 1993.
Rocky Mountain 1 Underground Coal Gasification
Test. Hanna, Wyoming Groundwater Evaluation. Final Report: June
10, 1988 June 30, 1993
Diffusion Coatings for Corrosion-Resistant Components in Coal
Gasification Systems. Quarterly Technical Progress Report 8.
April 1, 2005 June 30, 2005
Diffusion Coatings for Corrosion-Resistant Components in Coal
Gasification Systems. Quarterly Technical Progress Report 7.
April 1, 2005 June 30, 2005 |
04/27/06 |
Two New Reports
Task 6.5 Gas Separation and Hot-Gas Cleanup. Semi-Annual Report:
July 1 December 31, 1996.
C1
Chemistry for the Production of Clean Liquid Transportation
Fuels and Hydrogen. Annual Report: October 1, 2003 September
30, 2004 |
04/26/06 |
Six New Reports
C1
Chemistry for the Production of Ultra-Clean Liquid
Transportation Fuels and Hydrogen. Semi-Annual Six-Month Report,
October 1, 2002 March 31, 2003
Fundamental and
Exploratory Studies of Catalytic Steam Gasification of
Carbonaceous Materials: Final Report: Fiscal Years 1985-1994
Moving Bed, Granular Bed Filter Development Program - September
1994
Moving-Bed, Granular-Bed Filter Development Program Option III:
Development of Moving-Bed Filter Technology for
Multi-Contaminant Control Task 14. Test Plan - Topical Report,
November 1994
Moving Granular-Bed Filter Development Program Option III:
Development of Moving Granular-Bed Filter Technology for
Multi-Contaminant Control Task 14: Test Plan. Topical Report:
April 1994
Bench-Scale Testing and Evaluation of the Direct Sulfur Recovery
Process: Final Report: February 1990 March 1994 |
04/20/06 |
Five
New Reports
The Economic Production of Alcohol Fuels From Coal-Derived Synthesis
Gas Reporting Period: April 1, 1993 to June 30, 1993
Task 3.13 Hot-Gas Filter Testing. Semi-Annual Report - January
1 thru June 30, 1995.
Development of Hollow Fiber Catalytic Membranes for High Temperature
Gas Cleanup - Coal Fired Power Systems '94
Development of Hollow Fiber Catalytic Membrane Reactors for High
Temperature Gas Cleanup. Final Report. September 1989-March 1994.
United Bioenergy Commercialization Association Assessing the Potential
of Bioenergy. Final Report for the Period October 1, 1997 September
30, 1998 |
04/19/06 |
Three
New Reports
Biomass Gasification Combined Cycle . Agenda 2020. Final Report
- 2000.
Advanced Hot Gas Filter Development Topical Report: December 1996
August 1998
Advanced Hot Gas Filter Development Topical Report: Reporting
Period: May 1995 January 1999 |
04/18/06 |
Five
New Reports
Production of Elemental Sulfur and Methane From H2S and CO2 Derived
from a Coal Desulfurization Process. Final Report: September 1,
1993 March 31, 1997
Design, Synthesis and Mechanistic Evaluation of Iron-Based Catalysis
for Synthesis Gas Conversion to Fuels and Chemicals. Technical
Progress Report - April, 2005 to September 30, 2005.
Design Synthesis, and Mechanistic Evaluation of Iron-Based Catalysis
for Synthesis Gas Conversion to Fuels and Chemicals. Technical
Progress Report. April 1, 2004 September 30, 2004
Advanced Hot Gas Filter Development. Topical Report - May 1995-December
1996.
Thirty-Seventh Conference Analytical Chemistry In Energy Technology
- 1997 |
04/17/06 |
Two
New Reports
Proceedings of the 6th International Conference on Stability and
Handling of Liquid Fuels - October 1997. Volume 1.
Electrical-Impedance Tomography for Opaque Multiphase Flows in
Metallic (Electrically-Conducting) Vessels - November 2002 |
04/12/06 |
Three
New Reports
Task 2.5 Effectiveness of Sorbents for Trace Elements. Semi-Annual
Report: January 1 June 20, 1995.
Catalytic Gasification of Coal Using Eutectic Salt Mixtures. Final
Technical Report for the Project Duration: October 1997 to September
2001
Emission Testing of Washington Metropolitan Area Transit Authority
(WMATA) Natural Gas and Diesel Transit Buses |
04/11/06 |
Four
New Reports
Supported Liquid Catalysts for Removal of High Temperature Fuel
Cell Contaminants - 2000
Advanced Hot Gas Filter Development. For Period September 29,
1994 September 30, 1998.
ENCOAL Mild Coal Gasification Demonstration Project. Annual Report:
October 1993 September, 1994
ENCOAL Mild Coal Gasification Demonstration Project. Annual Report:
October 1991 September, 1992 |
04/10/06 |
Six
New Reports ENCOAL
Mild Coal Gasification Demonstration Project: Annual Report -
October, 1993
1997 Fifteen Annual Membrane Technology Separations Planning Conference
- October 1997. Advancing The Technology Base For High Temperature
Hydrogen Membranes
A Study of Toxic Emissions from a Coal-Fired Power Plant Utilizing
an ESP While Demonstrating the ICCT CT-121 FGD Project. Final
Report - June 1994.
Clean Coal Technology RD&D Program - 2003
Engineering Study for a Full Scale Demonstration of Stream Reforming
Black Liquor Gasification at Georgia-Pacifics Mill in Big Island,
Virginia - 2002
Integrated Mild Gasification Processing at the Homer City Electric
Power Generating Station Site: Final Report: July, 1989 June,
1993 |
04/07/06 |
Two
New Reports
Energy and Environmental Research Emphasizing Low-Rank Coal Task
3.4 Hot-Gas Cleaning. Topical Report. (Includes Semi-annual
Report for January June 1995)
Hybrid Sulfur Recovery Process for Natural Gas Upgrading Final
Report: January 1, 2001 June 30, 2004 |
04/06/06 |
Three
New Reports
Gasification Product Improvement Facility (GPIF): Final Report,
September 1995.
Advanced Hot Gas Filter Development - Final Report: September
29,1994 to March 31, 1998
Proceedings of the Coal-Fired Power Systems 94 -
Advances in IGCC and PFBC Review Meeting Volume 1 |
04/04/06 |
Seven
New Reports
Development of an Advanced Continuous Mild Gasification Process
for the Production of CO-Products. Final Report, September 1987-September
1996.
Integrated Gasification Combined Cycle (IGCC) Repowering Project
- Hot Gas Clean Up System. Topical Report - 1993
Integrated Gasification Combined Cycle (IGCC) Repowering Project
Clean Coal II Project. Annual Report - 1991.
Integrated Gasification Combined Cycle (IGCC) Repowering Project
Clean Coal II Project. Annual Report 1992.
Clean Coal Technology The New Coal Era. January 1994.
Final Technical Report on Dimethyl Ether (DME)-Fueled Shuttle
Bus Demonstration Project: July 1, 1999 November 30, 2002
Co-Production
of Electricity and Alternate Fuels from Coal: Final Report: August
1995 |
04/03/06 |
Two
New Reports
Annual Report for the Ultra-Clean Fischer-Tropsch Fuels Production
and Demonstration Project, 2004 - 2005
Design
and Initial Development of Monolithic Cross-Flow Ceramic Hot-Gas
Filters. |
03/31/06 |
1996
Windsor Workshop on Alternative Fuels. Proceedings. June 3-5, 1996. |
03/30/06 |
Three
New Reports
Thirteenth Symposium On Energy Engineering Sciences Fluid/Thermal
Processes: Systems Analysis and Control - 1995
Development of IGT Hydrogasification Process. Progress Reports,
January December 1967.
Eleventh Annual Coal Preparation, Utilization, and Environmental
Control Contractors Conference. July 12-14, 1995 |
03/29/06 |
One
New Report
Tenth Annual Coal Preparation, Utilization, and Environmental
Control Contractors Conference. July 18-21, 1994 - VOLUME II |
03/28/06 |
Three
New Reports
Tenth Annual Coal Preparation, Utilization, and Environmental
Control Contractors Conference: July 18-21, 1994 - VOLUME I
Design and Preparation of New, Highly Active Fischer-Tropsch Catalysts
- 1981
Coal Liquefaction and Gas Conversion. Contractor's Review Session
- September 1993 |
03/27/06 |
Two
New Reports
Thermal/Chemical Degradation of Ceramic Candle Filter Materials.
Final Report. September 1998-October 1994. January 1995
Stabilization of Spent Sorbents from Coal Gasification. Final
Technical Report. September 1, 1192 through August 31, 1993 |
03/24/06 |
Four
New Reports
Novel Process for Methanol Synthesis. Progress Report - December
1, 1990 - February 28, 1991.
Kinetic Investigations on Fischer-Tropsch Synthesis with Suspended
Catalysts - December 17, 1985 - 1985
Multifunctional Cobalt-Zeolite Catalysts For Fischer-Tropsch Synthesis
- June 1985
Life Cycle Assessment of Gasification-Based Power Cycles |
03/22/06 |
Two
New Reports
Gasification Combined Cycle: Carbon Dioxide Recovery, Transport,
and Disposal - 1994
Wabash River Coal Gasification Repowering Project. Final Technical
Report - August 2000. |
03/21/06 |
Three
New Reports
Portfolio Selections for Fossil Demonstration Plant Programs.
Report No. 1-703
Economic Evaluation of the Coproduction of Methanol and Electricity
with Texaco Gasification-Combined-Cycle Systems. Final Report
Chemistry and Catalysis of Coal Liquefaction: Catalytic and Thermal
Upgrading of Coal Liquid and Hydrogen of Coal Liquid and Hydrogenation
of CO to Produce Fuels. Quarterly Progress Report, October-December
1982. |
03/20/06 |
Four
New Reports
Scale-Up of Mild Gasification to a Process Development Unit: Mildgas
24 Ton/Day PDU Design Report: Final Report: November 1991 July
1996
Investigation of an Integrated Switchgrass Gasification/Fuel Cell
Power Plant: Final Report for Phase I of the Chariton Valley Biomass
Power Project.
Scale-Up of Mild Gasification to a Process Development Unit. Quarterly
Report: November 1993 February 1994
Hydrocarbon Synthesis. Effect of Reduction Temperature on Synthesis
Catalyst. Runs 63, 64, 65, and 66. 2001-2-P 11-18-55. |
03/10/06 |
Four
New Reports
Tampa Electric Company. First Quarterly Report, 1996 Status Review.
Tampa Electric Company - Final Public Design Report. Technical
Progress Report - July 1996.
Tampa Electric Company Polk Power Station - Unit #1. Annual Report
- 1993
Past Research Summary - Reduction of Carbon Monoxide |
03/09/06 |
Three New Reports
Seventeenth Symposium on Energy Engineering Sciences. May 13-14,
1999.
Tenth Annual Conference On Fossil Energy Materials - May 14-16,
1996
Fourteenth Symposium on Energy Engineering Sciences. Mechanical
Sciences: Solids and Fluids. May 15-16, 1996 |
03/08/06 |
Three New Reports
R&D Evaluation Workshop Report -September 7-8, 1995
Sixteenth Symposium on Energy Engineering Sciences. May 13-15,
1998.
Proceedings of the Ninth Annual Conference On Fossil Energy Materials.
May 16-18, 1995. |
03/07/06 |
Two New Reports
Fifth International Conference on Stability and Handling of Liquid
Fuels, Volume 2 - October 3, 1994
Fifth International Conference on Stability and Handling of Liquid
Fuels. Volume 1 - October 3-7, 1994 |
03/06/06 |
Two New Reports
Eighth Annual Conference On Fossil Energy Materials - May 10-12,
1994
The Refinery of the Future Workshop Proceedings - February 1994 |
02/27/06 |
Six New Reports
Energy-Cycle Analysis of a Gasification-Based Multi-Product System
With CO2 Recovery - March 8, 2001
Two Phase
Flow Studies - 2nd Annual Geothermal Progress Review Meeting,
October 11, 1983
Synthesis
of Methanol by a Novel Method - 1990
Eighteenth Symposium on Energy Engineering Sciences. May 15-16,
2000.
Wabash River Coal Gasification Repowering Project. Topical Report.
July 1992-December 1993. |
02/24/06 |
Two New Reports
Assessing
Pollutant Emissions from Natural Gas-Derived FT-Diesel - 2002
Life-Cycle Analysis of a Shell Gasification-Based Multi-Product
System with CO2 Recovery - March 30, 2001 |
02/22/06 |
Six New Reports
Characterization
and Optimization of Sorbents Utilized for Emission Control During
Coal Gasification - Final Report - July 14, 1998.
Characterization
and Optimization of Sorbents Utilized for Emission Control During
Coal Gasification - Quarterly Report Period 10/1/97 - 12/31/97.
Characterization and Optimization of Sorbents Utilized for Emission
Control During Coal Gasification - Quarterly Report January 1
March 31, 1997
Characterization
and Optimization of Sorbents Utilized for Emission Control During
Coal Gasification - Annual Research Report - 10/01/95 to 9/30/96
Characterization and Optimization of Sorbents Utilized for Emission
Control During Coal Gasification. Reporting Period: 01/01/96-09/30/96
Characterization
and Optimization of Sorbents Utilized for Emission Control During
Coal Gasification - Quarterly Research Report - 10/1996 - 12/1996 |
02/14/06 |
Thirteen New Reports
TAMPA ELECTRIC COMPANY IGCC Project: Quarterly Report: October
1, 1996 December 31, 1996
TAMPA ELECTRIC COMPANY DOE IGCC Project: Quarterly Report: July
1- September 30, 1996
TAMPA ELECTRIC COMPANY DOE IGCC Project: Quarterly Report: April
1 June 30, 1996
Integrated Gasification Combined Cycle (IGCC) Demonstration Project.
Polk Power Station Unit No. 1. Annual Report, October 1993-September
1994.
Polk
Power Station Unit 1 IGCC - 1996 DOE Annual Technical Report
Development of an Advanced, Continuous Mild Gasification Process
for the Production of Co-Products: Quarterly Report: April-June
1995
Characterization and Failure Analysis of Ceramic Filters Utilized
for Emission Control During Coal Gasification: Quarterly Report:
April 1 June 30, 1995
Enhanced Hydrogen
Production Integrated with CO2 Separation in a Single-Stage Reactor:
Semi-Annual Technical Progress Report: October 1, 2004 March
31, 2005.
A Novel Membrane Reactor for Direct Hydrogen Production from Coal,
Quarterly Report: 4/1/2005 6/30/2005
Computational and Experimental Modeling of Slurry Bubble Column
Reactors: Technical Report - August 2001
KRW Oxygen-Blown Gasification Combined Cycle: Carbon Dioxide Recovery,
Transport, and Disposal
Hydrogen
Production and Carbon Dioxide Recovery From KRW Oxygen-Blown Gasification
Designing
for Hydrogen, Electricity, and CO2 Recovery from a Shell Gasification-Based
System |
02/13/06 |
Four New Reports
An
Overview of Hydrogen Production From KRW Oxygen-Blown Gasification
With Carbon Dioxide Recovery
Advanced Power Assessment for Czech Lignits Task 3.6, Volume 1,
Topical Report: December 1995
Proceedings of the 6th International Conference on Stability and
Handling of Liquid Fuels - 1997
Fifth Annual Clean Coal Technology Conference. Technical Papers.
January 7-10, 1997, Tampa Florida |
02/10/06 |
Three New Reports
Wabash River Coal Gasification Repowering Project. Topical Report.
July 1992-December 1993.
Fifth Annual Clean Coal Technology Conference. Powering the Next
Millennium - 1997
U. S. Department of Energy Workshop on Future Fuel Technology
for Heavy Vehicles - 1996 |
02/07/06 |
February 7, 2006 Literature Reference Update |
02/06/06 |
Two New Reports
Advanced Coal Gasification Technical Analyses. Appendix 1: Technology
Reviews - 1986
High Pressure
Catalytic Reactions Over Single-Crystal Metal Surfaces |
02/01/06 |
Three New Reports
Proceedings
of the Fuels Technology Contractors Review Meeting - November
1993
Second Annual Clean Coal Technology Conference: Proceedings: Volume
2: September 9, 1993
Second Annual Clean Coal Technology Conference: Proceedings: Volume
1: September 8, 1993 |
1/31/06 |
Two New Reports
Proceedings
of the National Energy Modeling System Conference. February 1-2,
1993
Eleventh Symposium in Energy Engineering Sciences. Solid Mechanics
and Processing: Analysis, Measurement and Characterization. May
3-5, 1993. |
01/26/06 |
Three New Reports
Eighteenth Symposium on Energy Engineering Sciences. May 15-16,
2000.
Production of Methanol
and Light Hydrocarbons on Tho Sub 2 and Doped-Tho Sub 2 from CO
+ H Sub 2 Mixtures
Synthetic
Fuel Lubricity Evaluations |
01/18/06 |
Five New Reports
34th
ORNL/DOE Conference on Analytical Chemistry in Energy Technology
- Gatlinburg, Tennessee October 5-7, 1993.
Toms
Creek Integrated gasification combined cycle demonstration project.
Quarterly Report, July 1 September 30, 1993.
Coal Gasification,
Power Generation, and Product Market Study. Topical Report, March
1, 1995-March 31, 1996
Preparation of
Environmental Analyses for Synfuel and Unconventional Gas Technologies.
Evaluation
of Technology Modifications Required to Apply Clean Coal Technologies
in Russian Utilities. Final Report, December 1995. |
01/17/06 |
12 New Reports
Integrated
Gasification Combined Cycle (IGCC) Demonstration Project. Polk
Power Station Unit No. 1. Annual Report, October 1993-September
1994.
Development
of an Advanced Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly Report, January March 1996.
Development
of an Advanced Continuous Mild Gasification Process for the Production
of CO-Products. Final Report, September 1987-September 1996.
Development
of an Advanced Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly-Report, July-September 1995.
Development
of an Advanced Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly Report, October-December 1995.
Development
of an Advanced Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly Report, April- June 1994.
Development
of An Advanced, Continuous Mild Gasification Process For The Production
of Co-Products: Quarterly Report April-June 1995
Novel
Preparation and Magneto Chemical Characterization of Nanoparticle
Mixed Alcohol Catalysts
Reducing
Ultra-Clean Transportation Fuel Costs with HyMeltฎ Hydrogen. Quarterly
Report. April June 30, 2005
Kinetic Study
of Methanol Synthesis in a Slurry Reactor Using a CUO/ZNO/AL(SUB2)O(SUB
3) Catalyst
Chemical
Trapping and IR Studies of CO/H EXP 2 Surface Species. Second
Quarterly Report, December 1985-February 1986.
Fischer-Tropsch
Synthesis from a Low H SUB 2:CO Gas in a Dry Fluidized-Bed System.
Technical Progress Report, September 1, 1982-March 31, 1983. |
01/12/06 |
16 New Reports
Catalytic
Behaviors of Fe-MN Mixed Oxides - 1988
Homogenous High
Pressure Hydrogenation of Carbon Monoxide Using Cobalt, Ruthenium
and Iridium Catalyst
Development
of an Advanced, Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly Technical Progress Report, for the Period
April June 1988
Hydrogen
Production via a Commercially Ready Inorganic membrane Reactor.
Semi-Annual Technical Progress Report. Reporting Period: April
01, 2005 to September 30, 2005
CO2
Selective Ceramic Membrane for Water-Gas-Shift Reaction with Concomitant
Recovery of CO2. Final Report for the Period September 1, 2000
to March 31, 2005.
CO2
Selective Ceramic Membrane for Water-Gas-Shift Reaction with Concomitant
Recovery of CO2. Final Report for the Period September 1, 2000
to March 31, 2005.
Effects of Metal
Promotion On The Adsorptive And Catalytic Properties Of Rhodium
Model Catalytic
Systems: Reactions of Small Molecules (C Sub 4H Sub 9 OH, NH Sub
3, Co, H Sub 2) on Transition Metal Surfaces
Mechanisms of Fischer-Tropsch
Synthesis - 1984
Two Phase
Flow Studies - 1983
Capital
Budgeting Extension to the Econergy Portfolio Model. Econergy
Report No. 1-704, March 1977
Liquid
Hydrocarbon Fuels From Syngas. Ninth Quarterly Report, March
May 1983
Synthesis
of Octane Enhancer during Slurry-Phase Fischer-Tropsch. Quarterly
Technical Progress Report No. 3, April 1, 1991 June 30, 1991
Synthesis
of Octane Enhancers During Slurry-Phase Fischer-Tropsch. Quarterly
Technical Progress Report No. 9, October 1, 1992December 31,
1992
Synthesis
of Octane Enhancer During Slurry-Phase Fischer-Tropsch. Quarterly
Technical Progress Report No. 4, July 1, 1991 September 30,
1991.
Synthesis
of Octane Enhancer During Slurry-Phase Fischer-Tropsch. Quarterly
Technical Progress Report No. 1, September 26 December 31, 1990.
|
01/11/06 |
Five New Reports
Probe
Molecule Studies: Active Species In Alcohol Synthesis. Final Report,
July 1993 July 1994
Novel
Experimental Studies for Coal Liquefaction: Quarterly Progress
Report, April 1, 1988-June 30, 1988
Models
for Surface Intermediates in CO Hydrogenation: Final Report
Effect
of Carbon Dioxide on the Kinetic of the Fischer-Tropsch Synthesis
on Iron Catalysts - 1987
Study
of Ebullated-Bed Fluid Dynamics For H-Coal Quarterly Progress
Report No. 5 July 1, 1981 Sept. 30, 1981 |
01/09/06 |
Eight New Reports
Development
of an Advanced, Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly Report, April 1 June 30, 1993
Development
of an Advanced, Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly Report. January March 1994
Development
of an Advanced, Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly Report, April 1 June 30, 1993.
Development
of an Advanced, Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly Report for the Period January 2, 1992
March 31, 1992.
Development
of an Advanced, Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly Report for the Period July 1, 1992
September 30, 1992
Department
of an Advanced, Continuous Mild Gasification Process for the Production
of Co-Products. Quarterly Report for the period April 1, 1992
June 30, 1992
Characterization
and Failure Analysis of Ceramic Filters Utilized for Emission
Control During Coal Gasification. Final Technical Report.
Characterization
and Failure Analysis of Ceramic Filters Utilized for Emission
Control During Coal Gasification. Topical Report, October 1, 1995
September 30, 1996. |
01/06/06 |
Nine New Reports
Characterization
and Failure Analysis of Ceramic Filters Utilized for Emission
Control During Coal Gasification. Quarterly Report, July 1 September
30. 1997
Characterization
and Failure Analysis of Ceramic Filters Utilized for Emission
Control During Coal Gasification. Quarterly Report, July 1- September
30, 1996
Chemical
Trapping of CO/H Sub 2 Surface Species. Quarterly Report - Jan
1987
Chemical
Trapping of CO/H Sub 2 Surface Species. Second Quarterly Report,
September November 1985
Chemical
Trapping of CO/H Sub 2 Surface Species. Quarterly Report, September
1986
Chemical
Trapping of CO/H Sub 2 Surface Species - 1985
CO + H
SUB 2 Reactions Over Nitrogen-Modified Iron Catalysts. Quarterly
Technical Progress Report, October 1, 1984-December 31, 1984
CO + H
SUB 2 Reactions Over Nitrogen-Modified Iron Catalysts. Quarterly
Technical Progress Report, July 1-September 30, 1984
CO + H
SUB 2 Reactions Over Nitrogen-Modified Iron Catalysts. Quarterly
Technical Progress Report, April 1, 1984-June 30, 1984 |
01/05/06 |
Thirteen New Reports
Promotion
Effects on the Synthesis of Higher Alcohols. Sixth Quarterly Report,
December 1983-February 1984
Promotion
Effects on the Synthesis of Higher Alcohols. Eleventh Quarterly
Report, January-March 1985
Promotion
Effects on the Synthesis of Higher Alcohols. Final Report
Promotion
Effects on the Synthesis of Higher Alcohols. Fifth Quarterly Report,
September 1983-November 1983
Effect
of Chemical Additives on the Synthesis of Ethanol. Technical Progress
Report No. 10, December 16, 1989-March 15, 1990
Effect
of Chemical Additives on the Synthesis of Ethanol. Technical Progress
Report No. 14, September 16, 1990-December 15, 1990.
Effect
of Chemical Additives on the Synthesis of Ethanol. Technical Progress
Report No. 12, June 16, 1990-September 15, 1990
Effect
of Chemical Additives on the Synthesis of Ethanol. Technical Progress
Report 3, March 16, 1987-June 15, 1988
Effect
of Chemical Additives on the Synthesis of Ethanol. Technical Progress
Report 2, December 16, 1987-March 15, 1988
Effect
of Chemical Additives on the Synthesis of Ethanol. Technical Progress
Report 7, March 16, 1989-June 15, 1989
Effect
of Chemical Additives on the Synthesis of Ethanol. Technical Progress
Report, June 15, 1991-September 15, 1991
Twenty
Years of Energy Policy: Looking Toward the Twenty-First Century.
(Proceedings of the 20th Annual Illinois Energy Conference. November
1992.)
Fossil
Energy Research Meeting - June 1977 |
01/04/06 |
12 New Reports
Scale-Up
of Mild Gasification to a Process Development. Quarterly Report
- November 21, 1992 - February 20, 1993
Scale-Up
of Mild Gasification to a Process Development. Quarter Report
- February to May 1995.
Scale-Up
of Mild Gasification to a Process Development. November 21, 1994
- February 20, 1995
Scale-Up
of Mild Gasification to a Process Development. Quarterly Report:
May - August 1993
Scale-Up
of Mild Gasification to A Process Development Unit: Quarterly
Report: February May 1993
Scale-Up
of Mild Gasification to a Process Development. Quarterly Report
- August - November 1993
Scale-Up
of Mild Gasification to a Process Development. Quarterly Report
- February 21, - May 20, 1993
Scale-Up
of Mild Gasification to a Process Development. Quarterly Report
- May 21 - August 20, 1993
Material
and Energy Balances for Methanol from Biomass Using Biomass Gasifiers
- January 1992
Advanced
Computational Model for Three-Phase Slurry Reactors, Progress
Report for October 2001
Advanced
Computational Model for Three-Phase Slurry Reactors, Progress
Report for November 2000
Advanced
Computational Model for Three-Phase Slurry Reactors - October
2004 |
01/03/06 |
Five New Reports
Catalysis
and Surface Science - March 1979
Hydrogenation
of CO and CO Sub 2 on Clean Rhodium and Iron Foils. Correlations
of Reactivitys and Surface Compositions
Pre-stressed
Concrete Pressure Vessels Conceptual Design/Economic Analysis.
Executive Summary. R and D Report No. 114, Interim Report No.
8
Preliminary
Design Services Research and Development Report No. 114, JulySeptember
1975. Interim Report No. 2
Commercial
Complex Conceptual Design/Economic Analysis. Oil and Power by
Coed Based Coal Conversion. R and D Report No. 114. Interim Report
No. 1 |