Return to Department of Energy Reports
Table of Contents - C
Return to Gasification
Product Improvement Facility Table of Contents
Gasification
Product Improvement Facility (GPIF)
Conceptual Design Report -
September 1994
Sadowski, R. S. and Skinner,
W. H. - CRS Sirrine Engineers, Inc.
House, L. S. and Duck, R .R. - CRS Sirrine Engineers, Inc.
Lisauskas, R.A. and Dixit, V. J. - Riley Stoker Corporation
Morgan, M. E. and
Johnson, S. A. - PSI
PowerServ
Boni, A. A. - PSI-Environmental Instr. Corp.
Table
of Contents
Part 1, Pages 1 - 77, 4.54 MB |
|
List of Drawings |
iii |
List of Figures |
iv |
List of Tables |
v |
1.0 |
Summary |
1 |
2.0 |
Process & Operation |
5 |
|
2.0.1 |
Anticipated Throughput Capacity |
7 |
2.0.2 |
Increasing Performance & Operating Safety |
9 |
2.1 |
Process Descriptions |
11 |
2.1.1 |
Functional Descriptions |
11 |
2.1.2 |
Process Flow Sheets |
26 |
2.1.3 |
Equipment Specifications |
28 |
2.1.3.1 |
Materials of Construction |
28 |
2.1.3.2 |
Size of Significant Vessels |
29 |
2.1.4 |
Functional Descriptions of Test Facility – Phase II |
29 |
2.2 |
Operating Requirements |
30 |
2.2.1 |
Operating Summary |
30 |
2.2.2 |
Predicted Plant Emissions (Gaseous, Liquid, Solid) |
52 |
2.2.3 |
Utility Consumption |
58 |
2.2.3.1 |
Normal |
28 |
2.2.3.2 |
Special |
61 |
2.2.4 |
Feed Flow Rates |
61 |
2.2.5 |
Product Flow Rates |
63 |
2.2.6 |
Process Mass & Energy Balances |
64 |
2.2.7 |
Major Operating Parameters |
68 |
3.0 |
Conceptual Design |
71 |
3.1 |
Plant Description |
71 |
3.2 |
Coal Preparation & Feed System |
71 |
3.3 |
Compressors & Air Handling System |
71 |
3.4 |
PyGas™ Gasifier, Ash Handling, Fines Control |
76 |
3.5 |
Steam Generation, Water Treatment |
76 |
Part 2, Pages 78 - B-33, 3.00 MB |
|
3.6 |
Piping, Electrical |
78 |
3.6.1 |
Piping Systems: Approximate Flows & Conditions |
78 |
3.6.2 |
Electrical Requirements |
81 |
3.7 |
Disposal of Fuel Gas |
87 |
3.8 |
Emission Control System |
88 |
3.9 |
Process Steam Characterization |
88 |
3.10 |
Fuel Gas Monitoring, Data Acquisition, Process Control Instrumentation |
89 |
3.11 |
Host Site Interfaces |
98 |
4.0 |
Site Requirements, Revised Cost & Schedule |
101 |
4.1 |
Site Preparation Requirements |
101 |
4.1.1 |
Foundations/Pads Designs |
101 |
4.1.2 |
Steel, Support Structure, Layout |
102 |
4.1.3 |
Process Building & Area Major Features |
102 |
4.1.4 |
Office Configuration |
105 |
4.1.5 |
Utility Service |
105 |
4.2 |
Revised Construction Cost Estimate |
105 |
4.2.1 |
Value Engineering Cost Reduction Potentials |
107 |
4.2.2 |
Recommended Project Scope Changes |
108 |
4.3 |
Schedule for Detail Design & Construction |
109 |
4.3.1 |
Long Lead Items Descriptions |
109 |
4.3.2 |
Anticipated Time Requirements |
111 |
|