Return to DOE Reports Table of Contents - F Crow Tribe of Indians: Synfuels Feasibility Study Table of Contents Crow Tribe of Indians - Synfuels Feasibility Study. Volume II - August, 1982. Process Design and Cost Estimate Book III: Section 6.5 through 6.9. Fluor Engineers and Constructors Department of Energy Table of Contents 6.5 Coproduction Case 6-549 6.5.1 Overall Plant Description 6-549 6.5.2 Feed and Product Summary 6-550 6.5.3 Thermal Efficiency Calculation 6-552 6.5.4 Design Basis 6-554 6.5.5 Plant Units 6-555 6.5.6 Plant Train Philosophy 6-556 6.5.7 Plot Plan 6-557 6.5.8 Block Flow Diagrams 6-560 6.5.9 Utility Summary 6-568 6.5.10 Catalyst and Chemical Summary 6-571 6.5.11 Operating Manpower 6-577 6.5.12 Maintenance Manpower 6-578 6.5.13 Process Units Engineering Data 6-579 6.6 Shell Coal Case 6-650 6.6.1 Overall Plant Description 6-650 6.6.2 Feed and Product Summary 6-651 6.6.3 Thermal Efficiency Calculation 6-653 6.6.4 Design Basis 6-655 6.6.5 Plant Units 6-656 6.6.6 Plant Train Philosophy 6-657 6.6.7 Plot Plan 6-658 6.6.8 Block Flow Diagrams 6-661 6.6.9 Utility Summary 6-669 6.6.10 Catalyst and Chemical Summary 6-671 6.6.11 Operating Manpower 6-676 6.6.12 Maintenance Manpower 6-677 6.6.13 Process Units Engineering Data 6-678 6.6.14 Utility and Offsite Units 6-700 6.6.15 Capacity Factors 6-722 6.7 Process Studies 6-726 6.7.1 Steam Study 6-726 6.7.2 Flue Gas Desulfurization 6-738 Appendix A 6-755 Appendix B 6-766 6.7.3 Expanded Plant 6-766 6.8 Design Plans and Drawings 6-776 6.8.1 Site Preparation – Site 1 6-776 6.8.2 Roads – Site 1 6-786 6.8.3 Railroad – Site 1 6-796 6.8.4 Logistic Facilities – Site 1 6-798 6.8.5 Paving – Site 1 6-802 6.8.6 Foundations and Structures – Site 1 6-805 6.8.7 Buildings – Site 1 6-831 6.8.8 Ponds and Basins – Site 1 6-875 6.8.9 Site Preparation – Site 23 6-890 6.8.10 Roads – Site 23 6-895 6.8.11 Railroad – Site 23 6-899 6.8.12 Logistics Facilities – Site 23 6-900 6.8.13 Paving – Site 23 6-902 6.8.14 Foundations and Structures – Site 23 6-903 6.8.15 Buildings – Site 23 6-904 6.8.16 Ponds and Basins 6-906 6.9 Cost Estimates 6-907 6.9.1 Capital Cost Summary 6-907 6.9.2 Capital Cost Estimate 6-909 6.9.3 Other Capital Cost Allowances 6-917 6.9.4 Operating and Maintenance Cost Allowances 6-919 6.9.5 Cash Flow Data 6-921 |