Part 1, Pages 1 - 44.pdf |
1. |
Executive Summary |
1 |
2. |
Introduction |
1 |
3. |
Project Description |
1 |
4. |
Results |
3 |
4.1 |
Performance Summary |
3 |
4.2 |
WBS |
3 |
4.3 |
1992 Accomplishments |
4 |
4.4 |
Work to completed During Next Budget Period |
4 |
5. |
Environmental Discussion |
7 |
5.1 |
NEPA Support |
7 |
5.2 |
EMP |
7 |
5.3 |
Environmental and Construction Permitting |
7 |
5.4 |
Air Modeling |
8 |
5.5 |
BACT |
8 |
5.6 |
Air Permit |
9 |
5.7 |
Plans for Other Environmental Permits |
9 |
6. |
Technical Discussion |
|
6.1 |
IGCC Performance Studies |
9 |
6.2 |
Computer Modeling |
9 |
6.3 |
Heat Rate Sensitive Process Decisions |
12 |
6.3.1 |
Gasifier Air Temperature |
16 |
6.3.2 |
HRSG Stack Temperature |
17 |
6.3.3 |
HRSG Feedwater Temperature Study |
17 |
6.3.4 |
Supplemental HRSG Firing |
18 |
6.3.5 |
Coal and Char Feed System Study |
18 |
6.3.6 |
Process Steam Source Study |
20 |
6.3.7 |
Cost Reduction Study Heat Rate Effects |
20 |
6.3.8 |
HRSG Performance Study |
21 |
6.3.9 |
Coal Preparation Alternate |
24 |
6.3.10 |
Coal Feed Alternate |
26 |
6.4 |
Design Basis |
28 |
6.5 |
System Studies |
30 |
6.5.1 |
Coal Feed |
30 |
6.5.2 |
Pressurizing, Fluidizing, and Conveying Gas Study |
31 |
6.5.3 |
Coal Mill outlet Temperature |
31 |
6.5.4 |
Lockhopper and Feed Bin Digest |
31 |
6.5.5 |
Lockhopper and Feed Bin Test |
32 |
6.5.6 |
Material Handling Valve |
32 |
6.5.7 |
Char Recycle System |
33 |
6.5.8 |
Char Bagfilter |
33 |
6.5.9 |
Char Vessel Material |
33 |
6.5.10 |
Char Study |
36 |
6.5.11 |
Hot Gas Cleanup |
36 |
6.6 |
Heat and Material Balances |
36 |
6.7 |
Process Flow Diagrams and Process Descriptions |
37 |
6.8 |
Piping and Instrumentation Diagrams |
43 |
Part 2, Pages 45 - 82.pdf |
6.9 |
Metallurgical Diagrams |
45 |
6.10 |
Equipment Data Sheets |
45 |
6.11 |
Gasifier and Heat Exchanger |
46 |
6.11.1 |
Syngas Cooler Performance Studies |
47 |
6.11.2 |
Initial Mechanical Design |
49 |
6.11.3 |
Arrangement Drawings |
49 |
6.11.4 |
Transportation Study |
58 |
6.11.5 |
Construction Studies |
58 |
6.11.6 |
Heat Exchanger Computer Program |
59 |
6.11.7 |
Transient Studies |
59 |
6.11.8 |
Circulation System |
60 |
6.11.9 |
Superheater |
60 |
6.11.10 |
Burner Development |
61 |
6.11.11 |
Slag Tap |
61 |
6.11.12 |
Slag Grinder |
62 |
6.11.13 |
Gasifier and Syngas Cooler Cost Estimate |
62 |
6.12 |
Balance of Plant |
62 |
6.12.1 |
Coal Handling |
62 |
6.12.2 |
Slag Removal and Handling |
63 |
6.12.3 |
Sulfur Recovery |
64 |
6.12.4 |
Booster Compressor |
66 |
6.12.5 |
Gas Turbine |
66 |
6.12.6 |
Steam Turbine |
67 |
6.12.7 |
HRSG |
68 |
6.12.8 |
Plant Layouts |
68 |
6.12.8.1 |
Gasifier Island |
68 |
6.12.8.2 |
Lakeside Building |
70 |
6.12.8.3 |
Overall Site Plot Plans |
71 |
6.12.9 |
CWL&P Interfaces |
71 |
6.13 |
Cost Estimate |
74 |
6.14 |
Cost Reduction Studies |
74 |
6.15 |
Support Studies |
74 |
6.15.1 |
Materials Studies |
74 |
6.15.2 |
Permeability of Gasifier Char |
75 |
6.15.3 |
Kinetic Extruder |
76 |
6.15.4 |
Preliminary Hazard Analysis |
76 |
6.15.5 |
Gasification Data |
77 |
6.15.6 |
Lakeside Boiler Performance on LBG |
77 |
6.16 |
Startup/Shutdown/Operating Procedures |
78 |
6.17 |
Commissioning/Startup/Operation/Maintenance Plans |
79 |
6.18 |
Test Plans |
79 |
7. |
Site Related Activities |
80 |
8. |
Project Management |
80 |
8.1 |
Project Management Plan |
80 |
8.2 |
Schedules |
81 |