Return to DOE Reports Table of Contents - F Return to TVA Coal-Gasification Commercial Demonstration Plant Table of Contents
TVA Coal-Gasification Commercial Demonstration Plant Project. Volume 5. Plant Based on Koppers-Totzek Gasifier. Final Report - November 1, 1980. Foster Wheeler Energy Corporation
Part 1, Sect 1 - 3, Pages 1 - 103
Table of Contents 1.0 Introduction 8 2.0 Process Selection 10 2.1 Discussion of Choice of Processing Sequence 2.2 General Description of Flow 2.3 Nominal Plant Capacities 2.4 Block Flow Diagram 3.0 Baseline Design – Description of Plant 22 3.1 Section 100 Coal Preparations Description of Flow List of Major Equipment Flow Diagram 3.2 Section 200 Air Separation Plant Description of Flow Flow Diagram 3.3 Section 300 Gasification Description of Flow Input/Output Major Stream Flows List of Major Equipment Flow Diagrams 3.4 Section 400 Acid Gas Removal Description of Flow Input/Output Major Stream Flows List of Major Equipment Flow Diagram 3.5 Section 500 Treated Gas Compression Description of Flow Input/Output Major Stream Flows Flow Diagram 3.6 Section 600 Sulfur Recovery Description of Flow Input/Output Major Stream Flows Flow Diagram 3.7 Section 700 Sour Water Stripper Description of Flow Input/Output Major Stream Flows Flow Diagram 3.8 Section 800 Ash/Slag Handling Description of Flow List of Major Equipment Flow Diagram 3.9 Section 1200 Utility Area Description of Flow Flow Diagram 3.10 Section 1300 Cooling Water System Description of Flow Flow Diagram 3.11 Section 1400 Flare Description of Flow 3.12 Section 1500 Waste Water Treatment 3.13 Section 2000 General Facilities Ash Storage By-Products and Chemicals Storage Firewater System Sewage System Power, Lighting and Communications 3.14 Section 2100 Buildings 4.0 Plant Requirements 104 4.1 Summary of Feed and Products Tabulation of Feed and Products Heat Recovery Factor 4.2 Steam Balance Description of Flow Steam Balance Diagram 4.3 Water Balance Winter Balance Diagram 4.4 Power Requirements Discussion Listing of Gross and Net by Section 4.5 Fuel Requirements Description 4.6 Catalyst and Chemicals Requirements Catalysts & Chemicals Costs 5.0 Plant Layout 118 5.1 Key Plot Plan 5.2 Elevations 6.0 Environmental Assessment 130 7.0 Suggestion for Follow-on Work 134 8.0 Projections 136 9.0 Cost Estimates 138 9.1 Investment Costs 9.2 Operating Costs 9.3 Sensitivity Analysis |