Return to Department of
Energy Reports Table of Contents A-H
Return to Gasification Combined Cycle
Repowering Project Table of Contents
Integrated Gasification Combined
Cycle (IGCC) Repowering Project – Clean Coal II.
Annual Report - 1991
(ABB)
Combustion Engineering Systems
In this pdf format,
this document has 36 pages and is 1.88 MB.
Table of Contents
I. |
Executive Summary |
4 |
II. |
Introduction |
4 |
III. |
Project Description |
5 |
IV. |
Results |
6 |
a. |
Performance Summary |
7 |
b. |
WBS |
7 |
c. |
Budget Period #1 Accomplishments |
7 |
d. |
Work to completed During Next Budget Period |
10 |
V. |
Environmental Discussion |
12 |
a. |
NEPA Support |
12 |
b. |
Environmental and Construction Permitting |
12 |
c. |
EMPO |
12 |
VI. |
Technical Discussion |
13 |
a. |
Conceptual Cycle Studies |
13 |
b. |
Heat and Material Balances |
14 |
c. |
Process Flow Diagrams |
14 |
d. |
Preliminary Arrangement |
15 |
e. |
Equipment |
15 |
i. |
Coal Feed |
16 |
ii. |
Particulate Removal |
16 |
iii. |
Char Feed |
17 |
iv. |
Gasifier and Heat Exchanger |
17 |
v. |
Auxiliary Equipment |
18 |
vi. |
HGCU |
18 |
f. |
Support Tasks |
20 |
i. |
Fuel Feed (Transport) |
20 |
ii. |
Fuel Properties |
21 |
iii. |
Flow Modeling |
21 |
iv. |
Gasification Data |
22 |
VII. |
Site Related Activities |
22 |
VIII. |
Project Management |
23 |
a. |
PMP |
23 |
b. |
Schedules |
24 |
c. |
Sub-Contractors |
24 |
d. |
Cost Estimates |
24 |
Figures |
25 |
|