Trademark Notice |
ii |
Table of Contents |
iii |
List of Figures |
iv |
List of Tables |
v |
Summary |
1 |
1.0 |
Introduction |
2 |
2.0 |
Mine and Infrastructure Assessment |
4 |
3.0 |
Coal Sampling and Testing |
7 |
4.0 |
Market Assessment of PDF and CDL |
12 |
5.0 |
Engineering |
21 |
5.1 |
Introduction and Overview |
21 |
5.2 |
Process Flow Diagrams and Material Flow Balance |
29 |
5.3 |
Equipment Lists and Equipment Data Sheets |
34 |
5.4 |
Site layout and Support Facilities |
36 |
5.5 |
Site Preparation and Drainage |
41 |
5.6 |
Piping and Instrumentation Diagrams |
42 |
5.7 |
Generic Subsystem Drawings |
43 |
5.8 |
Plant Profile Drawings |
45 |
5.9 |
Electrical, Controls and Instrumentation |
48 |
6.0 |
Environmental and Permit Requirements |
54 |
7.0 |
Commercial Plant Implementation Schedule |
57 |
8.0 |
Project Economics |
62 |
9.0 |
Project Risk Assessment |
68 |
References |
73 |
Glossary |
74 |