Return to DOE Reports Table of Contents - N See also Gasification Plant Cost and Performance Optimization Table of Contents
Task 3 Gasification Plant
Cost and Performance Optimization.
Nexant
Nexant: Samuel Tam, Alan
Nizamoff, Sheldon Kramer, Scott Olson
Part 1, Page 1 - App. A, 4.92 MB Table of Contents 1 Executive Summary 1-1 8 2 Introduction 2-1 16 3. Methodology 3-1 19 3.1 Gasification Modeling 3-1 19 3.2 Downstream Process Modeling 3-2 19 3.3 Power Block Modeling 3-2 20 3.4 Cost Estimation 3-3 20 3.5 Availability Analysis 3-4 22 3.6 Commodity Pricing 3-6 24 3.7 Financial Analysis 3-7 25 4. Industrial Combined Heat and Power Plant Designs 4-1 4.1 Subtask 3.2 Air-Blown Design 4-1 27 4.2 Subtask 3.2 Oxy-blown Design 4-3 29 4.3 Subtask 3.3 Alternative Air-Blown Design 4-4 30 4.4 Comparison of the Subtask 3.2 and 3.3 Combined Heat and Power Designs 4-7 33 4.5 Sensitivity of the Subtask 3.3 Alternate Air-Blown Design to the Financial Parameters 4-11 37 4.6 Summary of the Subtask 3.2 and 3.3 Plant Designs 4-14 40 5. Lignite-Fueled IGCC Power Plant Design 5-1 42 5.1 Description of the Lignite-Fueled IGCC Power Plant Design 5-1 42 5.2 Financial Results for the IGCC Power Plant Design 5-5 46 5.3 Summary of the Subtask 3.4 Lignite-Fueled IGCC Power Plant Design 5-11 52 6. Summary 6-1 53 6.1 Summary 6-1 53 6.2 Conclusions 6-2 54 6.3 Recommendations 6-4 7 References 7-1 58 8 Acknowledgements 8-1 61 9 List of Acronyms and Abbreviations 9-1 62 Appendices A Subtask 3.2 Preliminary Designs for the Eastern Coal Case A-1 67 B Subtask 3.3 Alternate Design for the Eastern Coal Case B-1 255 C Subtask 3.4 Lignite-Fueled IGCC Power Plant C-1 369 |