Preliminary Design and Assessment of a 50,000 BPD Coal-to-Gasoline-to-Methanol Plant.

Preliminary Design and Assessment of a 12,500-BPD
Coal-to-Methanol-to-Gasoline Plant.  Technical Report - July 1982. 
Deliverable 36-1 (inserted verbatim).

Stewart, R. M.

W. R. Grace & CO.

In this pdf format, this document has 36 pages and is 837.40 kb.

Table of Contents

 

I.

Introduction

1

II.

The Ralph M. Parsons Company Technical Support

3

A.

Design Support

3

B.

Deviations

5

C.

Parson’s Subcontractor Design Support*

1-1

1

Introduction

1-1

2

Process Technical Support

2-1

2.1

Air Separation

2.2

Acid Gas Removal

2.3

Methanol Synthesis

2.4

Pressure Swing Adsorption (PSA) Unit

2.5

HF Alkylation

2.6

Sulfur Recovery and Sulfur Removal

2.7

Flue Gas Desulfurization

3

 

Equipment Vendor Technical Support

3-1

3.1

Coal Grinding

3.2

Wastewater Treatment

4

 

Other Technical Support

4-1

4.1

Site Development and Environmental Assessment

4.2

Land Appraisals

4.3

Environmental Coordination

5

Deviations from Technical Support Plan – Deliverable 35-1

III.

Mobil Research and Development Corporation Technical Support

6

A.

Design Support

6

1.

Foster Wheeler

8

B.

 

Deviations

9