Return to DOE Reports Table of Contents - S Preliminary Design and Assessment of a 50,000 BPD Coal-to-Gasoline-to-Methanol Plant.
Process Engineering and
Mechanical Design Reports. Volume II of IV, Deliverable 14B. Preliminary
Design and Assessment of a 12,500 BPD
Stewart, R. M. The Ralph M. Parsons Company Table of Contents 1. Facilities Design II-1-1 1.1 General Constraints II-1-1 1.1.1 Codes and Standards II-1-1 1.1.2 Regulatory standards and Requirements II-1-2 1.1.3 Sparing Criteria II-1-4 1.1.4 Special Metallurgical Requirements II-1-5 1.2 Process Units Design II-1.2-1 1.2.1 Coal Receiving and Unloading – Unit 11 II-1.2.1.1 1.2.2 Coal Conveying and Storage – Unit 12 II-1.2.2.1 1.2.3 Coal Stacking and Reclaiming – Unit 13 II-1-2.3-1 1.2.4 Solid Waste Collection and Disposal Unit 14 II-1.2.4-1 1.2.5 Gasification – Unit 21 II-12.5-1 1.2.6 Oxygen – Unit 22 II-1.2.6-1 1.2.7 CO Shift – Unit 23 II-1.2.7-1 1.2.8 Coal Grinding and Slurry Preparation – Unit 24 II-1.2.8-1 1.2.9 Methanol Synthesis – Unit 25 II-1.2.9-1 1.2.10 Ammonia Recovery – Unit 26 II-1.2.10-1 1.2.11 Effluent Water Treatment (Texaco) – Unit 27 III-1.2.11-1 1.2.12 Methanol-to-Gasoline Unit 31 III-1.2.13.-1 1.2.13 Gas Fractionation – Unit 32 III-1.2.13-1 1.2.14 HF Alkylation – Unit32 III-1.2.14-1 1.2.15 Acid Gas Removal – Unit 34 III-1.2.15-1 1.2.16 Sulfur Recovery (Claus) – Unit 36 III-1.2.16-1 1.2.17 Sulfur Removal (BSRP) – Unit 37 III-1.2.17-1 1.2.18 Heavy Gasoline Treating – Unit 38 II-1.2.18-1 1.2.19 Process Water Treatment – Unit 39 III-1.2.19-1 |