Return to DOE Report Table of Contents
Return to Portfolio Selections for Fossil
Demonstration Plant Programs Table of Contents
Capital Budgeting
Extension to the Econergy Portfolio Model.
Econergy Report No. 1-704, March 1977
English, J. Morley
Econergy, Inc.
In this
pdf format, this document has 42 pages and is 1.47MB.
Table of Contents
List of Figures |
iii |
List of Tables |
iii |
1. |
Introduction |
1 |
2. |
Basic Capital Budgeting Model |
4 |
2.1 |
Postulations |
5 |
2.2 |
Method for Satisfying the Budget Constraints |
8 |
3. |
Illustrative Example |
11 |
3.1 |
Net Present Worth |
11 |
3.2 |
Slippage Penalties |
14 |
3.3 |
The Budget Constraints |
18 |
3.4 |
Process of Slippage |
19 |
3.5 |
Revised Benefit/Risk Map |
28 |
4. |
Summary |
33 |
References |
35 |
|