Return to DOE Reports Table of Contents - P Return to Coal Gasification Project - Philadelphia Gas Works Table of Contents See also, 20222. Medium Btu Coal Gasification Project, Plant Design. December 1981.
Philadelphia Gas Works
Part 1,
Sec 1 - 3.8, 4.61 MB Table of Contents 1.0 Introduction 1-1 1.1 Project Background 1-1 1.2 Project Overview 1-4 1.3 Approach to Definitive Design 1-4 1.3.1 Market and Fuel Use Considerations 1-5 1.3.2 Site Considerations 1-7 1.3.3 Coal Considerations 1-10 1.3.4 Process Considerations 1-11 1.3.5 Criteria for Definitive Design 1-13 2.0 Basis for Process Design 2-1 2.1 Plant Site 2-1 2.2 Plant Site 2-1 2.3 Coal Feed 2-3 2.4 Gasification Process 2-3 2.5 Sulfur Removal and Recovery 2-4 2.6 Makeup Water Supply 2-4 2.7 Solid Waste Disposal 2-5 3.0 Process Description 3-1 3.1 Overall Process Description 3-1 3.2 Coal Receiving and Handling 3-13 3.2.1 Coal Receiving 3-13 3.2.2 Conveying to Storage, Weighing, and Sampling 3-14 3.2.3 Coal Storage 3-15 3.3 Coal Preparation and Conveying 3-15 3.4 GKT coal gasification and wash water treatment 3-17 3.5 Sulfur Removal and recovery 3-27 3.5.1 Stretford Desulfurization 3-27 3.5.2 Nittetu Incineration 3-32 3.6 Air Separation 3-33 3.7 Product Gas Handling 3-39 3.7.1 Gas Compression 3-39 3.7.2 Gas Dehydration 3-40 3.8 Wastewater Treatment 3-42 3.9 Utility Support Systems 3-44 3.9.1 Plant and Potable Water System 3-44 3.9.2 Cooling Water System – Process Plant 3-45 3.9.4 Other Plant Utility Support Systems 3-49 3.9.5 Plant Offsite Support Systems 3-51 3.10 Labor, Raw Materials, and Utility Requirements 3-55 4.0 Plant Design 4-1 4.1 Plant Description 4-1 4.1.1 Risk Assessment 4-2 4.1.2 Operational Considerations 4-5 4.2 Site Work 4-5 4.2.1 Site Preparation 4-5 4.2.2 Structural Design 4-6 4.3 Process Equipment 4-8 4.3.1 Coal Receiving and Handling 4-8 4.3.2 Coal Preparation and Conveying 4-18 4.3.3 GKT Coal Gasification Facility 4-25 4.3.4 Sulfur Removal and Recovery 4-34 4.3.5 Air Separation Facility 4-42 4.3.6 Gas Compression and Dehydration 4-45 4.3.7 Wastewater Treatment 4-54 4.3.8 Utilities and Supporting Systems 4-60 4.4 Plant Electrical Design 4-89 4.4.1 Plant Electrical Design Criteria 4-89 4.4.2 Plant Electrical System 4-90 4.4.3 Plant Short Circuit Levels 4-91 4.4.4 Plant Power System Operation 4-92 4.4.5 Plant Motors and Motors Control 4-97 4.4.6 Plant Instrument and Control Systems 4-98 4.4.7 Plant Lighting 4-109 4.4.8 Plant Communication Systems 4-109 4.4.9 Plant Fire Protection system 4-110 4.4.10 Plant CO Monitoring System 4-111 4.4.11 Plant Security System 4-111 4.4.12 Determination of Annual Electrical Usage 4-111 4.5 Gas Distribution System 4-112 4.5.1 Design Basis 4-112 4.5.2 Design Approach 4-115 4.5.3 Sample Calculation 4-117 4.5.4 Design Description 4-118 5.0 Alternate Operating Scenarios 5-1 5.1 Purchase of Oxygen 5-1 5.2 Coal via the Port Richmond Terminal 5-2 5.3 CO Generation for Loading Leveling 5-3 5.3.1 Capital Costs 5-6 5.3.2 Operating Costs 5-6 Appendices A Coal Search 246 B Fly Ash Recycle 267 C Stretford Plant Sulfur Recovery Options 272 D Layout Drawings 288 E Piping Flow Diagrams 309 F Electrical Drawings 336 G Instrument and Control Logic Diagrams 351 H Master Instrument Index 406 I PGW Conceptual Plant Design Review 454 J Equipment List 532 K Motor List Used for Total Plant Load Calculation 581 |