1. |
Project Description |
1 |
2. |
Project Highlights |
3 |
3. |
Environmental/Permitting |
4 |
4. |
Major Contracts Awarded |
5 |
4.1 |
Turnkey Air Separation Unit |
5 |
4.2 |
Detailed Professional Engineering and Technical Services |
5 |
4.3 |
Hot Gas Clean-Up System Preliminary Design |
5 |
4.4 |
Engineered Equipment Package for Radiant Syngas Cooling System |
5 |
4.5 |
Engineered Equipment Package for Convective Syngas Cooling System |
5 |
4.6 |
Construction Management Services |
6 |
4.7 |
Distributed Control System |
6 |
4.8 |
Power Plant Sire Purchase Agreements |
6 |
5. |
Process Description |
7 |
5.1 |
Coal Handling, Grinding, and Slurry Preparation |
7 |
5.2 |
Gasifier System |
8 |
5.3 |
Cold Gas Clean Up (CGCU) |
9 |
5.4 |
Hot Gas Clean Up (HGCU) |
11 |
5.5 |
Combined Cycle Power Generation |
13 |
5.5.1 |
Combustion Turbine-Generator (CT and CTG) |
13 |
5.5.2 |
Heat Recovery Steam Generator (HRSG) |
13 |
5.5.3 |
Steam Turbine-Generator (ST and STG) |
14 |
5.5.4 |
Condensate System |
14 |
5.5.5 |
Electrical Power Distribution System |
15 |
5.6 |
Air Separation Unit |
16 |
5.7 |
By-Product Handling |
17 |
5.7.1 |
Slag |
17 |
5.8.2 |
Slag Storage Area |
17 |
5.9 |
Sulfuric Acid Plant |
19 |
5.10 |
Balance of Plant Systems |
20 |
5.10.1 |
Cooling Water |
20 |
5.10.2 |
Fuel Oil Storage |
21 |
6. |
Project Management |
22 |
7. |
Project Cost |
24 |
7.1 |
Total Instilled Cost Estimate – August 1993 |
24 |
7.2 |
1993 Project Costs Year-To-Date and Project-To-Date |
24 |
7.3 |
Budget Period 2 Cost Estimate |
25 |
8. |
Technical Progress |
26 |
8.1 |
Detailed Engineering |
26 |
8.1.1 |
Coal Delivery, Handling, and Storage Facilities |
26 |
8.1.2 |
Coal Grinding and Slurry Preparation |
27 |
8.1.3 |
Gasifier System |
27 |
8.1.4 |
Hot Gas Clean Up System |
27 |
8.1.5 |
Cold Gas Clean Up System |
28 |
8.1.6 |
Sulfuric Acid Plant |
28 |
8.1.7 |
Combined Cycle Power Generation System |
28 |
8.1.8 |
Air Separation Unit |
29 |
8.1.9 |
By-Product Handling Systems |
29 |
8.1.10 |
Cooling/Circulating Water and Firewater Systems |
29 |
8.1.11 |
Power Block Closed Loop Cooling Water System |
29 |
8.1.12 |
Fuel Oil Storage |
30 |
8.1.13 |
Compressed Air System |
30 |
8.1.14 |
Water Treatment System |
30 |
8.1.15 |
Waste Treatment System |
30 |
8.2 |
Procurement |
31 |
8.2.1 |
Coal Delivery, Handling, and Storage Facilities |
31 |
8.2.2 |
Coal Grinding and Slurry Preparation |
31 |
8.2.3 |
Gasifier System |
31 |
8.2.4 |
Hot Gas Clean Up System |
31 |
8.2.5 |
Cold Gas Clean Up System |
31 |
8.2.6 |
Sulfuric Acid Plant |
31 |
8.2.7 |
Combined Cycle Power Generation System |
32 |
8.2.8 |
Air Separation Unit |
32 |
8.2.9 |
By-Product Handling Systems |
32 |
8.2.10 |
Cooling/Circulating Water and Firewater Systems |
32 |
8.2.11 |
Power Block Closed Loop Cooling Water System |
32 |
8.2.12 |
Fuel Oil Storage |
32 |
8.2.13 |
Compressed Air System |
33 |
8.2.14 |
Water Treatment System |
33 |
8.2.15 |
Waste Treatment System |
33 |
8.3 |
Significant Enhancements |
34 |
8.3.1 |
Coal Delivery, Handling, and Storage Facilities |
34 |
8.3.2 |
Coal Grinding and Slurry Preparation |
34 |
8.3.3 |
Gasifier System |
35 |
8.3.4 |
Hot Gas Clean Up System |
36 |
8.3.5 |
Cold Gas Clean Up System |
36 |
8.3.6 |
Sulfuric Acid Plant |
36 |
8.3.7 |
Combined Cycle Power Generation System |
36 |
8.3.8 |
Air Separation Unit |
37 |
8.3.9 |
Power Block Closed Loop Cooling Water System |
38 |
8.3.10 |
Compressed Air System |
38 |
8.3.11 |
Waste Treatment System |
38 |
9. |
Construction Management |
39 |
10. |
Technical Papers/Conference Presentations |
40 |
11. |
Projections for 1994 |
42 |
12. |
Summary |
44 |
13. |
Appendix |
46 |