Return to DOE Report Table of Contents

Return to Tampa Electric Company IGCC Project Table of Contents

Tampa Electric Company - Final Public Design Report. 
Technical Progress Report - July 1996.

Part 1, Pages 1 - 118, 3.70 MB
Part 2, Pages 119 - 182, 2.92 MB

Table of Contents

Part 1

1.0

Introduction

1-1

2.0

Project Description

2-1

3.0

Technology Overview

3-1

4.0

Design Basis Description

4-1

4.1

Project Performance Design Basis

4-1

4.1.1

Capacity

4-1

4.1.2

Availability/Reliability

4-1

4.1.3

Design Basis Feed Composition

4-5

4.1.4

Coal Handling Systems

4-5

4.1.5

Preheat Fuel

4-5

4.1.6

Air Separation Unit Requirements

4-10

4.1.7

Power Block Design Parameters and Product Specifications

4-10

4.1.8

Sulfuric Acid Plant

4-11

 

4.1.8.1

Feed Gas Conditions

4-11

 

4.1.8.2

Product and Effluent Specifications

4-13

4.1.9

Design Life of Equipment

4-14

4.2

Site Conditions

4-15

4.2.1

Project Location

4-15

4.2.2

Elevation

4-15

4.2.3

Current Site Development

4-15

4.2.4

Access

4-15

4.2.5

Soil and Groundwater Conditions

4-15

4.2.6

Seismic Design Requirements

4-16

4.3

Climatic Design Data

4-16

4.3.1

Summer Design Temperatures

4-16

4.3.2

Winter Design Temperatures

4-16

4.3.3

Snowfall

4-16

4.3.4

Rainfall

4-16

4.3.5

Barometric Pressure

4-17

4.3.6

Wind Load

4-17

4.4

Utility Specifications

4-17

4.4.1

Existing Utilities

4-17

4.4.2

Saturated Steam System

4-17

4.4.3

Fresh Water System

4-19

4.4.4

Potable Water

4-19

4.4.5

Demineralized Water

4-19

4.4.6

Boiler Feed Water

4-19

4.4.7

Steam Condensate

4-22

4.4.8

Service Water

4-22

4.4.9

Fire Water System

4-22

4.4.10

Cooling Water

4-22

4.4.11

Plant and Instrument Air

4-24

4.4.12

Nitrogen

4-24

4.4.13

Electrical Supply

4-25

5.0

Plant Description

5-1

5.1

Site Description

5-1

5.2

Plant Layout

5-3

5.3

Process Description

5-3

5.3.1

Gasification

5-5

5.3.1.1

Gasification and Cold Gas Cleanup

5-5

5.3.1.2

Air Separation Unit

5-7

5.3.1.3

Hot Gas Cleanup

5-7

5.3.1.4

Sulfuric Acid Plant

5-8

5.3.2

Power Generation

5-8

6.0

Plant Systems

6-1

6.1

Gasification

6-1

6.1.1

Gasifier System

6-1

6.1.2

Coal Handling, Grinding, and Slurry Preparation

6-3

6.2

Cold Gas Cleanup

6-5

6.3

Hot Gas Cleanup

6-8

6.3.1

Particulate Removal

6-8

6.3.2

Desulfurization

6-8

6.3.3

Regeneration

6-10

6.3.4

Regeneration Gas Recycle Subsystem

6-10

6.3.5

Halogen Removal

6-11

6.4

Combined Cycle Power Generation

6-11

6.4.1

Combustion Turbine-Generator

6-11

6.4.2

Heat Recovery Steam Generator

6-11

6.4.3

Steam Turbine-Generator

6-12

6.4.4

Condensate System

6-12

6.4.5

Electrical Power Distribution System

6-14

6.5

Air Separation Unit

6-18

6.6

By-Product Handling

6-18

6.6.1

Slag

6-18

6.6.2

Slag Storage Area

6-18

6.6.3

Sulfuric Acid

6-19

6.6.4

Sulfuric Acid Storage Facilities

6-20

6.7

Balance of Plant Systems

6-20

6.7.1

Cooling Water

6-20

6.7.2

Fuel Oil Storage

6-21

6.7.3

Utility Summary

6-21

6.8

Distributed Control System

6-23

6.9

Emergency Shutdown System

6-23

7.0

Project Costs and Schedule

7-1

7.1

Project Costs

7-1

7.2

Project Schedule

7-3

8.0

Heat and Material Balances

8-1

Part 2

9.0

General Arrangement Drawings

9-1

9.1

Site Plot Plant

9-1

9.2

Gasification Structure Arrangement

9-1

9.3

Power Block Arrangement Drawings

9-1

9.4

Air Separation Unit Plot Plan

9-1

10.0

Equipment List

10-1

11.0

Miscellaneous Drawings

11-1

11.1

Project Schedules

11-1

11.2

Electrical One-Line Diagram

11-1

11.3

Process Flow Diagrams

11-1