Part 1, Pages 1 - 129,5.72 MB |
1.0 |
Abstract |
2.0 |
Executive Summary |
3.0 |
Coal Gasification Combined Cycle System |
3.1 |
Overall System Description |
3.2 |
System Components |
3.2.1 |
Coal Gasification |
3.2.2 |
Fuel Gas Clean-up |
3.2.3 |
Combustion Turbine |
3.2.4 |
Heat Recovery |
3.2.5 |
Steam Turbine |
3.2.6 |
Water Treatment |
3.2.7 |
Utilities and Facilities |
3.3 |
Fuel Supply and Preparation |
3.3.1 |
Coal Source |
3.3.2 |
Coal Transportation |
3.3.3 |
Coal Receipt, Storage and Preparation |
3.4 |
Electrical One Line Diagram |
4.0 |
System Operation |
4.1 |
General Description |
4.2 |
Operating Cases |
4.2.1 |
Case I: Stream Turbine – generator units #9 and #11 at full load with the gasifier and gas turbine at matching load. |
4.2.2 |
Case II: Maximum production; all turbine generators operating at full load. |
4.2.3 |
Case III: Limited operation |
4.2.4 |
Case IV: Gasifier and gas turbine at rated load, with partial bypass of heat recovery steam generator. |
4.2.5 |
Case V: Gasifier out of service with the gas turbine at full load on distillate fuel. |
4.3 |
Partial loads and Operational limits |
4.4 |
Start-up and shutdown |
5.0 |
Environmental Licensing Considerations |
5.1 |
Air Quality |
5.1.1 |
Emission Loads |
5.1.2 |
Permits and Regulations |
5.2 |
Solid Wastes |
5.2.1 |
Solid Wastes for Disposal |
5.2.2 |
Permits and Regulations |
5.2.3 |
Alternative Methods of Disposal |
5.3 |
Water Quality |
5.3.1 |
Waste water for Disposal |
5.3.2 |
Permits and Regulations |
Structure – Section 316B Clean Water Act |
Part 2, Pages 129 - 261, 4.85 MB |
|
5.4 |
Other Environmental Considerations |
5.4.1 |
Cooling Tower |
5.4.2 |
Navigable Airspace |
5.4.3 |
Vehicular Traffic |
5.4.4 |
Dredging and Construction in Navigable Waters |
5.4.5 |
Noise |
5.4.6 |
Flaring |
6.0 |
Item List |
7.0 |
Paragraph Specifications |
8.0 |
Capital Cost Estimate |
9.0 |
Operating and Maintenance Cost Estimates |
10.0 |
Economic Analysis |
10.1 |
Introduction |
10.2 |
Summary and Conclusions |
10.3 |
Method of Analysis |
10.4 |
Major Assumptions |
10.5 |
Other Considerations |
10.6 |
Analysis |
10.7 |
Graphics |
10.8 |
Appendix A |
10.9 |
Addendum #1 – Economic Analysis |
11.0 |
Regulatory Environment |
12.0 |
Government Impact |
13.0 |
Management Review |
14.0 |
Recommendations |
15.0 |
Schedule for Building Proposed Plant |