Return to DOE Reports Table of Contents A-H Return to DOE Reports Table of Contents S - Z Steel Point Coal Gasification / Combined Cycle Study, Bridgeport (Title Page Missing)
Table of Contents 1.0 Abstract 2.0 Executive Summary 3.0 Coal Gasification Combined Cycle System 3.1 Overall System Description 3.2 System Components 3.2.1 Coal Gasification 3.2.2 Fuel Gas Clean-up 3.2.3 Combustion Turbine 3.2.4 Heat Recovery 3.2.5 Steam Turbine 3.2.6 Water Treatment 3.2.7 Utilities and Facilities 3.3 Fuel Supply and Preparation 3.3.1 Coal Source 3.3.2 Coal Transportation 3.3.3 Coal Receipt, Storage and Preparation 3.4 Electrical One Line Diagram 4.0 System Operation 4.1 General Description 4.2 Operating Cases 4.2.1 Case I: Stream Turbine – generator units #9 and #11 at full load with the gasifier and gas turbine at matching load. 4.2.2 Case II: Maximum production; all turbine generators operating at full load. 4.2.3 Case III: Limited operation 4.2.4 Case IV: Gasifier and gas turbine at rated load, with partial bypass of heat recovery steam generator. 4.2.5 Case V: Gasifier out of service with the gas turbine at full load on distillate fuel. 4.3 Partial loads and Operational limits 4.4 Start-up and shutdown 5.0 Environmental Licensing Considerations 5.1 Air Quality 5.1.1 Emission Loads 5.1.2 Permits and Regulations 5.2 Solid Wastes 5.2.1 Solid Wastes for Disposal 5.2.2 Permits and Regulations 5.2.3 Alternative Methods of Disposal 5.3 Water Quality 5.3.1 Waste water for Disposal 5.3.2 Permits and Regulations Structure – Section 316B Clean Water Act 5.4 Other Environmental Considerations 5.4.1 Cooling Tower 5.4.2 Navigable Airspace 5.4.3 Vehicular Traffic 5.4.4 Dredging and Construction in Navigable Waters 5.4.5 Noise 5.4.6 Flaring 6.0 Item List 7.0 Paragraph Specifications 8.0 Capital Cost Estimate 9.0 Operating and Maintenance Cost Estimates 10.0 Economic Analysis 10.1 Introduction 10.2 Summary and Conclusions 10.3 Method of Analysis 10.4 Major Assumptions 10.5 Other Considerations 10.6 Analysis 10.7 Graphics 10.8 Appendix A 10.9 Addendum #1 – Economic Analysis 11.0 Regulatory Environment 12.0 Government Impact 13.0 Management Review 14.0 Recommendations 15.0 Schedule for Building Proposed Plant |