Part 1, Pages 1 - 48, 4.20 MB |
1. |
Introduction |
1 |
2. |
Project Objectives |
1 |
3. |
Schedule of Milestones |
1 |
4. |
Summary of Test Plans |
2 |
5. |
Technical Summary |
2 |
6. |
Technical Approach |
3 |
7. |
Existing Facility Description |
3 |
8. |
Test Facility Major Equip. Cap. & Ties to Ft. Martin |
3 |
9. |
Functional Descriptions of Test Facility – Phase I |
22 |
10. |
Control System Description |
32 |
11. |
Electrical System Assessment |
37 |
12. |
Functional Descriptions of Test Facility – Phase II |
44 |
13. |
Project Environmental Aspects |
49 |
14. |
Emission Reduction of NOx |
49 |
15. |
Greenhouse Gases and Air Toxics |
49 |
16. |
Production and Handling of Other Effluents |
50 |
17. |
EHSS Compliance |
51 |
18. |
Plan for EHSS Risks and Impacts |
52 |
19. |
Viability of the Gasification Concept |
53 |
20. |
Overview of the PyGas™ Process |
57 |
21. |
The Pyrolyzer |
58 |
22. |
Upper Zone of the Gasifier |
60 |
23. |
Upper Bed Gasification |
60 |
24. |
Lower Bed Gasification |
62 |
25. |
Math Model Predictions |
62 |
26. |
Conclusions |
64 |
27. |
Description of the PyGas™ Gasifier |
64 |
28. |
Unique Features of the PyGas™ Gasifier |
65 |
28.1 |
Run of Mine Coal |
65 |
28.2 |
Air Blown |
65 |
28.3 |
Caking Coals |
65 |
28.4 |
Tar Cracking |
66 |
28.5 |
Volatilized Alkali Control |
66 |
28.6 |
Minimized Ammonia Production |
66 |
29. |
Emissions Characteristics |
66 |
Part 2, Pages 49 - 109, 4.19 MB |
|
NEPA Document Table of Contents PSIT Support |
68 |
1. |
Introduction |
69 |
1.1 |
Trace Elements in Coal |
69 |
1.2 |
Emissions from Fort Martin Plant Under Normal Operation |
74 |
1.3 |
Trace element Behavior in GPIF System |
85 |
1.4 |
Significance of Trace Metal Emission from GPIF |
96 |
2. |
CRITERIA POLLUTANTS |
100 |
2.1 |
SO2 Emissions |
100 |
2.2 |
NOx Emissions |
100 |
2.3 |
CO Emissions |
103 |
3. |
NEPA Assessment of PSIT Facilities |
103 |
3.1 |
Brief Description of PSIT Laboratory Facilities to be Used in this Project |
103 |
3.2 |
Anticipated Emission from PSIT Laboratory Facilities |
104 |
3.3 |
Permits Required |
106 |
3.4 |
Agency Contacts |
106 |
4. |
References |
107 |