Return to DOE Reports Table of Contents - S Preliminary Design and Assessment of a 50,000 BPD Coal-to-Gasoline-to-Methanol Plant.
Preliminary Design and
Assessment of a 50,000 BPD Stewart, R. M. W. R. Grace & Co. In this pdf format, this document has 53 pages and is 1.37 MB. Table of Contents I. Introduction 1 II. The Ralph M. Parsons Company Technical Support 3 A. Vendor Technical Support 3 1. Kennedy Van Saun – Coal Grinding 4 2. Ruhrchemie – Heat Recovery 4 3. Air Liquide – Oxygen Plant 4 4. Lotepro- Acid Gas Removal 5 5. Parsons – Bulk Sulfur Recovery 5 6. Parsons – Tail Gas Sulfur Recovery 6 7. Lurgi – Methanol Synthesis 6 8. Phillips – HF Alkylation 6 9. Dames & Moore – Site Environmental Data 7 10. Flue Gas Desulfurization 7 III. Mobil Research and Development Corporation Technical Support 8 A. Preparation Support 11 1. United States Army Corps of Engineers (COE) – Lead Federal Agency 11 2. Environmental Consultant 12 |