Part 1 |
Executive Summary |
E-1 |
1. |
Overview of Russian Power Industry |
1-1 |
1.1 |
General |
1-1 |
1.2 |
TPS Environmental Impact |
1-6 |
2. |
|
Electric Power Equipment of Russia |
2-1 |
2.1 |
General |
2-1 |
2.2 |
Steam Boilers and Associated Equipment |
2-1 |
2.3 |
Steam Turbines |
2-8 |
2.4 |
Gas-Turbine Unit |
2-11 |
3. |
The Power Industry Development Forecast for Russia |
3-1 |
4. |
Clean Coal Technology Demonstration Program (CCTP) of U.S. Department of Energy |
4-1 |
4.1 |
General |
4-1 |
4.2 |
Project for Reducing Emissions from Conventional Boilers |
4-2 |
4.3 |
Advanced Power Technologies Project |
4-6 |
4.4 |
Result Obtained in CCTP Project |
4-12 |
Part 2 |
5. |
Reduction of Coal TPS Environmental Impact in Russia |
5-1 |
5.1 |
Coal used at Russian TPS |
5-1 |
5.1.1 |
General |
5-1 |
5.1.2 |
Characteristics of Bituminous Coals |
5-2 |
5.1.3 |
Characteristics of Brown Coals |
5-3 |
5.2 |
Power and Environmental Protection Technologies in Use |
5-4 |
6. |
Base Options of advanced coal thermal power plant |
6-1 |
6.1 |
6.4-GW TPS Project with 800-MW, Brown K-A Coal-Fired Unit |
6-1 |
6.2 |
Yuzhno-Ural Ekib Bituminous Coal-Fired 4-GW TPS with 500-MV Unit Project |
6-3 |
6.3 |
2,400MW TPS with CFB Boilers Firing Poor-Quality Anthracite Culm(AC) |
6-6 |
6.4 |
IGCC TPS Project with Entrained-Flow and Moving-Bed Coal Gasification |
6-9 |
Gasification |
6-9 |
IGCC Equipment |
6-14 |
Gas Turbine |
6-14 |
Heat-Recovery Boiler(HRSG) |
6-15 |
Steam Turbine |
6-16 |
Gasifiers |
6-17 |
Air Separation Plant |
6-18 |
6.5 |
TPS with Fluidized-Bed Gasification CCP Project |
6-19 |
Conclusions |
C-1 |
References |
R-1 |
Acronyms and Abbreviations |
A-1 |
Part 3 |
Tables |
T-1 |
Figures |
F-1 |