Crow Tribe of Indians: Synfuels Feasibility Study Table of Contents

Crow Tribe of Indians - Synfuels Feasibility Study - August, 1982. Process Design and Cost Estimate Volume II,  Book II, Sections 6.3 and 6.4.

Fluor Engineers and Constructors

Table of Contents

 

 Part 1, TOC - 6-262, 3.86 MB

 

6.3

Base Case Utility and Offsite Units – Engineering Data

6-224

 

6.3.1

Unit 40 – Oxygen Production

6-224

6.3.2

Unit 41 – Steam Generation

6-233

6.3.3

Unit 42 – Power Generation

6-248

6.3.4

Unit 43 – Flue Gas Desulfurization

6-256

 Part 2, 6-263 - 6-318, 4.41 MB

 

 

6.3.5

Unit 44 – Raw Water Treating

6-263

6.3.6

Unit 45 – Boiler Feedwater and Condensate Treatment

6-273

6.3.7

Unit 46 – Air and Nitrogen Systems

6-293

6.3.8

Unit 47 – Process Cooling Water

6-304

6.3.9

Unit 48 – Utility Cooling Water

6-318

 

 

 

6.3.10

Unit 49 – Potable Water

6-328

6.3.11

Unit 50 – Utility Water

6-338

6.3.12

Unit 51 – Firewater

6-342

6.3.13

Unit 52 – Fuel Gas

6-349

6.3.14

Unit 53 – Flare

6-356

6.3.15

Unit 54 – Wastewater Treating

6-365

Part 3, 6-319 - 6-377, 4.15 MB

 

 

6.3.16

Unit 55 – Tank Farm and Dispatch

6-389

6.3.17

Unit 56 – Sanitary Waste Treatment System

6-419

6.3.18

Unit 57 –Interconnecting Pipeway

6-423

6.3.19

Unit 61 – Buildings

6-424

 Part 4, 6-378 - 6.424, 4.27 MB

 

 

6.3.20

Unit 65 – Electrical Distribution

6-425

 

Appendix 6.3.20-1 Electrical Design Drawings

6-443

6.3.21

Unit 68 – Control Systems

6-468

Part 5, 6-425 - 6-483, 4.34 MB

Part 6, 6-484 - 6-548, 3.30 MB

 

 

6.3.22

Unit 71 – Site Preparation

8-494

 

6.3.23

Unit 75 – Site Improvements

6-495

6.4

Power Self-Sufficiency Case

6-497

 

6.4.1

Overall Plant Description

6-497

6.4.2

Feed and Product Summary

6-498

6.4.3

Thermal Efficiency Calculation

6-500

6.4.4

Design Basis

6-502

6.4.5

Plant Units

6-503

6.4.6

Plant Train Philosophy

6-504

6.4.7

Plot Plan

6-505

6.4.8

Block Flow Diagrams

6-506

6.4.9

Utility Summary

6-514

6.4.10

Catalyst and Chemicals Summary

6-517

6.4.11

Operating Manpower

6-522

6.4.12

Maintenance Manpower

6-523

6.4.13

Process Units Engineering Data

6-524

6.4.14

Utility and Offsites Units

6-528

6.4.15

Capacity Factors

6-546