Part 1, Sect 1 - 3.5, Pages 1 - 79, 5.14 MB.pdf |
1.0 |
Introduction |
7 |
2.0 |
Process Selection |
9 |
2.1 |
Discussion of Choice of Processing Sequence |
|
2.2 |
General Description of Flow |
2.3 |
Nominal Capacities of Processing Units |
2.4 |
Block Flow Diagram |
3.0 |
Baseline Design – Description of Plant |
23 |
3.1 |
Section 100 Coal Preparation |
|
3.2 |
Section 200 Air Separation Plant |
3.3 |
Section 300 Gasification and Gas Scrubbing |
Typical Layout |
3.4 |
Section 400 Acid Gas Removal |
Flow Diagram |
3.5 |
Section 500 Treated Gas Compression |
Part 2, Sect 3.9 - 4.6, Pages 80 - 164, 5.09 MB |
|
3.6 |
Section 600 Sulfur Recovery Plant |
|
3.7 |
Section 700 Sour Water Stripping |
3.8 |
Section 800 Ash Slag Handling |
3.9 |
Section 1200 Utility Area |
Raw Water Treatment and Storage |
Potable Water Storage & Cond. Treatment |
BFW Treatment |
Stream Generation & Distribution |
3.10 |
Section 1300 Cooling Water System |
3.11 |
Section 1400 Flare |
3.12 |
Section 1500 Waste Water Treatment |
3.13 |
Section 2000 General Facilities |
Description of Systems |
Ash Storage |
Byproducts and Chemicals Storage |
Firewater Systems |
Sewage System |
Power, Lighting and Communications |
3.14 |
Section 2100 Buildings |
4. |
Plant Requirements |
150 |
4.1 |
Summary of Feed and Products |
|
Tabulation of Feed and Products |
Overall Material and Energy Balance |
4.2 |
Steam Balance |
Description of Flow |
Steam Balance Diagram |
4.3 |
Cooling Water Usage |
Description |
Cooling Water Usage Diagram |
4.4 |
Power Requirements |
Listing of Power Usage by Section |
4.5 |
Fuel Requirements |
Description |
4.6 |
Catalysts and Chemicals Requirements |
Listing and Yearly Consumption and Costs |
5.0 |
Plant Layout |
165 |
5.1 |
Key Plot Plan |
5.2 |
Elevations |
6.0 |
Environmental Assessment |
174 |
Part 3, Section 5 - 9, Pages 165 - 207, 2.28 MB |
7.0 |
Suggestions for Follow-on Work |
187 |
8.0 |
Projections |
189 |
9.0 |
Cost Estimates |
191 |
9.1 |
Investment Cost |
|
9.2 |
Operating Cost |
9.3 |
Sensitivity Analysis |