Return to DOE
Reports Table of Contents - L
Long-Term Durability
Testing of Ceramic Cross-Flow Filter.
Final Report - September 29, 1987 to December 31, 1992.
Lippert, T. E.
Alvin, M. A.
Smeltzer, E. E.
Bachovchin, D. M.
Westinghouse Electric Corporation
Part 1, Pages 1 - 4-30, 4.95 MB
Part 2,
Pages 5-1 - C-36. 4.20 MB
Part 3,
Pages D-1 - E-33, 4.00 MB
Part 4,
Pages F-1 - H-57, 3.33
Part 5, Pages I-1 - L-8, 5.03 MB
Table
of Contents
Part 1, Pages 1 - 4-30.pdf |
Abstract |
ix |
Executive Summary |
S-1 |
|
Introduction |
S-1 |
Project Description |
S-1 |
Project Results |
S-3 |
Project Conclusions |
S-7 |
References |
S-8 |
1. |
Introduction |
1-1 |
1.1 |
Cross Flow Filter Concept |
1-1 |
1.2 |
Cross Flow Filter Development |
1-1 |
1.3 |
Long Term Durability Testing |
1-10 |
1.4 |
References |
1-10 |
2. |
Experimental Test Plan |
2-1 |
2.1 |
Objective |
2-1 |
2.2 |
Description of Test Facilities |
2-2 |
|
2.2.1 |
PFBC Simulator Test loop |
2-2 |
|
2.2.2 |
Gasifier Char, HTHP Recirculating Gas Test Loop |
2-7 |
2.3 |
Operating Procedures and Test Criteria |
2-12 |
2.3 |
References |
2-18 |
3. |
Summary of Test Results |
3-1 |
3.1 |
Overview |
3-1 |
3.2 |
PFBC Simulator Filter Testing |
3-3 |
3.3 |
Gasifier Char, Recirculating Gas Testing |
3-20 |
4. |
Discussion and Results |
4-1 |
4.1 |
Comparison of PFBC Simulator and Plant Filter Testing |
4-1 |
4.2 |
Comparison between Simulator and Gasification Plant Experience |
4-8 |
4.3 |
Cross Flow Filter Performance Potential |
4-19 |
4.4 |
Cross Flow Filter Durability |
4-23 |
4.5 |
References |
4-30 |
Part 2, Pages 5-1 - C-36, 4.20 MB |
5. |
Conclusions and Recommendations |
5-1 |
Appendix A - C |
|
|
Part 3, Pages D-1 - E-33, 4.00 MB |
Appendix D - E |
|
D-1 |
Part 4, Pages F-1 - H-57, 3.33 MB |
Appendix F - H |
|
F-1 |
Part 5, Pages I-1 - L-8, 5.03 MB |
Appendix I - L |
|
I-1 |
|