Return to DOE Report Table of Contents
Return to Tampa
Electric Company IGCC Project Table of Contents
TAMPA ELECTRIC
COMPANY –IGCC Project:
Quarterly Report: October 1, 1996 – December 31, 1996
Tampa Electric
Company
In this pdf format, this
document has 14 pages and is 1.01 MB.
Table of Contents
1. |
Title Page |
i |
2. |
Initial Commercial Operation |
2 |
3. |
Air Separation |
2 |
4. |
Slurry Preparation |
3 |
5. |
Gasifier |
4 |
6. |
High Temperature Syngas Cooling |
6 |
7. |
Low Temperature Gas Cooling (LTGC) |
7 |
8. |
Acid Gas Removal |
7 |
9. |
Sulfuric Acid Plant |
8 |
10. |
Slag Handling, Fines Removal, and Process Water Systems |
9 |
11. |
Brine Concentration |
10 |
12. |
Combined Cycle |
10 |
13. |
Control System |
12 |
|