Return to Texaco Reports Table of Contents
Preliminary Report on Synthesis Operations
Laboratory: Montebello
Date: 1947
ChevronTexaco provides no warranties, either express or
implied, as to the accuracy or validity of any of the work in this report.
Anyone accessing or using the reports indemnifies and holds ChevronTexaco
harmless against any liability that comes from using
or relying on the information contained therin.
In this pdf format, this
document has 119 pages and is 196MB.
Table of Contents
Preliminary Report on Synthesis Operations, February
15, 1947 |
3 |
|
Introduction
(4.72MB) |
4 |
Equipment
(3.48MB) |
4 |
Operation
(3.16MB) |
5 |
Catalyst
(1.46MB) |
6 |
Discussion |
6 |
|
(Part 1 - 4.50MB) |
6-11 |
(Part 2 - 5.72MB) |
12-15 |
(Part 3 - 4.27MB) |
16-19 |
(Part 4 - 5.87MB) |
20-23 |
(Part 5 - 4.37MB) |
24-27 |
(Part 6 - 4.39MB) |
28-33 |
(Part 7 - 4.90MB) |
34-38 |
(Part 8 - 4.58MB) |
39-41 |
|
Report on Synthesis Run Number 12,
February 27, 1947 |
42 |
|
Introduction
(1.93MB) |
43 |
Equipment Changes
(1.14MB) |
43 |
Operations
(3.72MB) |
43 |
Discussion
(2.62MB) |
45 |
Future Operation |
46 |
|
(Part 1 - 5.61MB) |
46-47 |
(Part 2 - 5.79MB) |
48-49 |
(Part 3 - 4.67MB) |
50-51 |
(Part 4 - 4.32MB) |
52-53 |
(Part 5 - 5.58MB) |
54-55 |
(Part 6 - 4.51MB) |
56-57 |
(Part 7 - 4.31MB) |
58-59 |
(Part 8 - 4.30MB) |
60-64 |
|
Test of Stratco Separating Wheel, March
15, 1947 |
65 |
|
Introduction
(1.22MB) |
66 |
Equipment
(1.70MB) |
66 |
Operations
(1.75MB) |
67 |
Discussion |
68 |
|
(Part 1 - 3.75MB) |
68-71 |
(Part 2 - 3.84MB) |
72 |
(Part 3 - 4.17MB) |
73 |
|
Heat Transfer Data, April 7, 1947 |
74 |
|
Introduction
(935kb) |
75 |
Equipment
(648kb) |
75 |
Operation
(1.32MB) |
75 |
Results |
76 |
|
(Part 1 - 5.25MB) |
76-82 |
(Part 2 - 3.16MB) |
83-84 |
|
Preliminary Correlation of Synthesis
Data, April 7, 1947 |
85 |
|
Introduction
(719kb) |
86 |
Correlations and Discussion |
86 |
|
(Part 1 - 5.27MB) |
86-90 |
(Part 2 - 5.25MB) |
90-93 |
(Part 3 - 2.58MB) |
94-95 |
|
Preliminary Report on Synthesis Run
Number 15, April 18, 1947 |
96 |
|
Introduction
(3.51MB) |
97 |
Equipment Changes
(2.03MB) |
97 |
Operations
(3.87MB) |
97 |
Catalyst History
(2.25MB) |
99 |
Results
(3.56MB) |
100 |
Discussion |
101 |
|
(Part 1 - 5.48MB) |
101-103 |
(Part 2 - 5.39MB) |
104-105 |
(Part 3 - 3.16MB) |
106 |
(Part 4 - 3.72MB) |
107 |
(Part 5 - 4.90MB) |
108 |
(Part 6 - 4.25MB) |
109 |
(Part 7 - 3.8MB) |
110 |
|
Review of Operations, Synthesis Runs 17
through 21 |
111 |
|
(Part 1
- 5.36MB) |
111 - 115 |
(Part 2
- 3.56MB) |
116 |
(Part 3
- 3.65MB) |
117 |
(Part 4
- 3.73MB) |
118 |
(Part 5
- 3.9MB) |
119 |
|