Abstract |
v |
List of Tables |
vi |
List of Figures |
viii |
Introduction and Summary |
x |
|
|
1 |
Fluid Bed
Gasifier (FBG) Studies (1.55MB) |
1 |
|
1.1 |
FBG Recommissioning |
1 |
|
1.1.1 |
Mechanical Modifications |
1 |
1.1.2 |
Updating of On-Line Data Acquisition System |
4 |
1.2 |
FBG Operations |
6 |
|
1.2.1 |
Startup and Baseline Operations |
7 |
1.2.2 |
Process Variable Studies |
9 |
1.2.3 |
Catalyst Recycle Operations |
10 |
1.2.4 |
Char Production Operations |
12 |
1.3 |
FBG Data Analysis |
12 |
|
1.3.1 |
Initial Operations |
16 |
1.3.2 |
Process Variable Studies with K2CO3
Catalyst |
17 |
1.3.3 |
Mixed Catalyst Operations |
18 |
1.3.4 |
Catalyst Recovery Operations |
19 |
1.3.5 |
Char Production Operations |
19 |
1.3.6 |
Comparison of FBG Data with Reactor Model
Predictions |
19 |
1.4 |
Catalyst Recycle Operations |
22 |
|
1.4.1 |
Operations of the Catalyst Recovery Unit (CRU) |
22 |
1.4.2 |
Overall Catalyst Recycle Loop Operations |
22 |
1.5 |
Pilot Scale Secondary Catalyst Recovery |
26 |
1.6 |
FBG Scrubber Water Analysis |
28 |
2 |
Bench Scale Studies (2.38MB) |
31 |
|
2.1 |
Continuous Gasification Unit (CGU)
Operations |
31 |
|
2.1.1 |
CGU Operating Experience |
31 |
2.1.2 |
CGU Data Analysis |
35 |
2.2 |
Fixed Bed Gasification Reaction Studies |
39 |
|
2.2.1 |
Experimental Apparatus and Procedure |
39 |
2.2.2 |
Kinetic Data Interpretation |
43 |
2.2.3 |
Generalized Fixed Bed Model |
51 |
2.2.4 |
Alternate Catalyst Systems |
54 |
2.3 |
Recovery of Water Soluble Catalyst |
62 |
|
2.3.1 |
Chemical Forms of Water Soluble Potassium |
62 |
2.3.2 |
Improvement of Catalyst Recovery from the CRU |
66 |
2.4 |
Recovery of Water Insoluble Catalyst
|
73 |
|
2.4.1 |
Mineral Matter Reactions |
75 |
2.4.2 |
Experimental Procedure |
76 |
2.4.3 |
Effect of Washing Solutions |
76 |
2.4.4 |
Effects of Temperature, Residence Time, and Calcium
Loading |
81 |
2.4.5 |
Catalyst Recovery from Combusted Char |
83 |
2.4.6 |
Data Analysis |
84 |
2.5 |
Catalyst Recovery via the Formate
Process |
85 |
3 |
Engineering Research and
Development (1.73MB) |
88 |
|
3.1 |
Catalyst Source/Recovery Studies |
89 |
|
3.1.1 |
Commercial Sources of Potassium and Sodium Catalyst |
89 |
3.1.2 |
"Cash Flow" Analysis of Alternative Catalyst
Manufacturing Process |
92 |
3.1.3 |
Screening Evaluation of the Engel-Precht Process |
95 |
3.1.4 |
Screening Evaluation of Alternative Electrolysis
Technologies |
96 |
3.1.5 |
"Cash Flow" Analysis of Alternative Catalyst
Recovery Processes |
98 |
3.1.6 |
Screening Study of Ca(OH)2 Digestion |
101 |
3.2 |
Gasification Reactor System Studies |
104 |
|
3.2.1 |
Evaluation of the Incentive for Secondary
Gasification |
104 |
3.2.2 |
Evaluation of Two-Stage Gasifier with Upper Drying
Stage |
109 |
3.2.3 |
Impacts of Catalyst Gasifier Operating Conditions |
114 |
3.3 |
Acid Gas Removal Studies |
118 |
|
3.3.1 |
Evaluation of Conventional Acid Gas Removal Process |
118 |
3.3.2 |
Evaluation of Cryogenic Fractionation for Acid Gas
Removal |
119 |
4 |
Commercial Plant Study
Design and Economics (2.05MB) |
121 |
|
4.1 |
Study Design Steps and Depth of
Engineering Detail |
122 |
4.2 |
Project Basis |
124 |
4.3 |
Process Basis |
125 |
|
4.3.1 |
Coal Drying and Catalyst Addition |
125 |
4.3.2 |
Reactor System |
125 |
4.3.3 |
Product Gas Cooling and Scrubbing |
130 |
4.3.4 |
Sour Water Stripping and Ammonia Recovery |
130 |
4.3.5 |
Acid Gas Removal and Sulfur Recovery |
130 |
4.3.6 |
Methane Recovery System |
130 |
4.3.7 |
Refrigeration |
131 |
4.3.8 |
Catalyst Recovery |
131 |
4.4 |
Detailed Material and Energy Balances |
132 |
4.5 |
Equipment Design for Onsites |
132 |
|
4.5.1 |
Section 100 - Coal Drying and Catalyst Addition |
132 |
4.5.2 |
Section 200 - Reactor System |
135 |
4.5.3 |
Section 300 - Product Gas Cooling and Scrubbing |
137 |
4.5.4 |
Section 400 - Sour Water Stripping and Ammonia
Recovery |
137 |
4.5.5 |
Section 500 - Acid Gas Removal and Sulfur Recovery |
138 |
4.5.6 |
Section 600 - Methane Recovery System |
139 |
4.5.7 |
Section 700 - Refrigeration |
139 |
4.5.8 |
Section 800 - Catalyst Recovery |
139 |
4.6 |
Overall Plant Utilities Balances |
140 |
4.7 |
Equipment Sizing for Offsites |
142 |
4.8 |
Plant Investment |
144 |
|
4.8.1 |
Investment Cost Estimating Approach |
144 |
4.8.2 |
Investment for a Pioneer Commercial Plant |
145 |
4.9 |
Economics |
147 |
|
4.9.1 |
Basis for Calculation of SNG Cost |
147 |
4.9.2 |
SNG Cost for a Pioneer Commercial Plant |
149 |
|
APPENDIX A - FLUID
BED GASIFIER YIELD PERIOD DATA (5.67MB) |
153 |
|
A.1 |
Yield Period 202 |
156 |
A.2 |
Yield Period 203 |
164 |
A.3 |
Yield Period 204 |
173 |
A.4 |
Yield Period 205 |
180 |
A.5 |
Yield Period 206 |
188 |
A.6 |
Yield Period 207 |
196 |
A.7 |
Yield Period 208 |
204 |
A.8 |
Yield Period 209 |
212 |
A.9 |
Yield Period 210 |
220 |
A.10 |
Yield Period 211 |
228 |
A.11 |
Yield Period 212 |
236 |
A.12 |
Yield Period 213 |
244 |
A.13 |
Yield Period 214 |
252 |
A.14 |
Yield Period 215 |
260 |
A.15 |
Yield Period 216 |
268 |
A.16 |
Yield Period 217 |
276 |
A.17 |
Yield Period 218 |
284 |
A.18 |
Yield Period 219 |
292 |
|
APPENDIX B -
PUBLICATIONS (2.81MB) |
300 |
|
B.1 |
Catalytic Gasification
Predevelopment Research |
301 |
B.2 |
Kinetics of Potassium
Catalyzed Gasification |
307 |
B.3 |
Catalytic Coal Gasification
Process Research and Development |
327 |
B.4 |
Production of SNG from
Illinois Coal via Catalytic Gasification |
336 |