Return to DOE Report Table of Contents
Return to Process and Testing of Syngas Derived
Ultra-Clean Fuels
Development of OTM Syngas Process and Testing of Syngas-Derived
Ultra-clean Fuels in Diesel Engines and Fuel Cells,
Budget Period 1, Topical
Report - 2001
Robinson, E.T. (Skip)
Meagher, James P.
Prasad,
Ravi
In the pdf format his document has 47 pages and is 678kb
Table of Contents
1.0 |
Executive Summary |
4 |
2.0 |
Introduction |
6 |
3.0 |
Results by Task |
|
3.1 |
Task 1: Materials Development |
7 |
3.2 |
Task 2: Composite Element Development |
12 |
3.3 |
Task 3: Tube Fabrication |
15 |
3.4 |
Task 4: Reactor Design and Process
Optimization |
17 |
3.5 |
Task 5: Catalyst Development |
26 |
3.6 |
Task 6: P-1 Operation |
29 |
3.7 |
Task 7: P-2 Build and Operation |
31 |
3.8 |
Task 8: Fuel and Engine Testing |
31 |
3.9 |
Task 9: Market Study |
34 |
3.10 |
Task 10: Program Management |
34 |
4.0 |
Conclusion |
35 |
5.0 |
References |
37 |
6.0 |
Appendices |
|
6.1 |
Disk Reactor |
A-1 |
6.2 |
P-0 Reactor |
A-2 |
6.3 |
Long Tube Tester |
A-3 |
6.4 |
P-1 Pilot Plant |
A-4 |
6.5 |
Element Manufacturing Facility |
A-5 |
6.6 |
Nuvera MPR Facility |
A-7 |
6.7 |
International Truck and Engine Facility |
A-8 |
|