Prestressed
Concrete Pressure Vessels Conceptual
Design/Economic Analysis. R and D Report No. 114, Interim Report No. 8
O’Hara, J. B.
Howell, R. D.
Lee, J. C.
Lin, T. Y.
Chow, P. C
Ngo,
D.
The Ralph M. Parsons Company
In this
pdf format, this document has pages iii to 6-11 and is 3.56MB.
In this pdf
format, this document has pages 6-12 to D-5 and is 3.64MB.
Table of Contents
Abbreviations |
viii |
Glossary of Terms |
x |
Section 1 |
Introduction |
1-1 |
Section 2 |
Summary |
2-1 |
Section 3 |
Project Parameters |
3-1 |
|
3.1 |
Scope of Work |
3-1 |
|
3.2 |
Vessels Plus Ancillaries Studied |
3-1 |
Section 4 |
Economics |
4-1 |
Section 5 |
PCPV Characteristics and History |
5-1 |
|
5.1 |
Characteristics |
5-1 |
|
5.2 |
History |
5-1 |
Section 6 |
PCPV Design |
6-1 |
|
6.1 |
Vessel Functional Requirements |
6-1 |
|
6.2 |
PCPV Design |
6-4 |
|
6.3 |
PCPV Structural Design Methods |
6-6 |
|
6.4 |
PCPV Design Analysis |
6-7 |
Section 7 |
Fabrication and Construction |
7-1 |
|
7.1 |
Conclusions |
7-1 |
|
7.2 |
Fabrication and Construction Sequence |
7-1 |
|
7.3 |
Schedule |
7-3 |
|
7.4 |
Discussion |
7-3 |
Section 8 |
Technical Feasibility |
8-1 |
|
8.1 |
Vessel Size, Materials, and Construction |
8-1 |
|
8.2 |
Inspection |
8-2 |
|
8.3 |
Maintenance and Repair |
8-4 |
|
8.4 |
Changes and Modifications |
8-5 |
|
8.5 |
Safety |
8-6 |
Section 9 |
Literature Cited |
9-1 |
|