Prestressed Concrete Pressure Vessels Conceptual
Design/Economic Analysis.  R and D Report No. 114, Interim Report No. 8

O’Hara, J. B.
Howell, R. D.
Lee, J. C.
Lin, T. Y.
Chow, P. C
Ngo, D.

The Ralph M. Parsons Company

In this pdf format, this document has pages iii to 6-11 and is 3.56MB.

In this pdf format, this document has pages 6-12 to D-5 and is 3.64MB.

Table of Contents

 

Abbreviations

viii

Glossary of Terms

x

Section 1

Introduction

1-1

Section 2

Summary

2-1

Section 3

Project Parameters

3-1

 

3.1

Scope of Work

3-1

 

3.2

Vessels Plus Ancillaries Studied

3-1

Section 4

Economics

4-1

Section 5

PCPV Characteristics and History

5-1

 

5.1

Characteristics

5-1

 

5.2

History

5-1

Section 6

PCPV Design

6-1

 

6.1

Vessel Functional Requirements

6-1

 

6.2

PCPV Design

6-4

 

6.3

PCPV Structural Design Methods

6-6

 

6.4

PCPV Design Analysis

6-7

Section 7

Fabrication and Construction

7-1

 

7.1

Conclusions

7-1

 

7.2

Fabrication and Construction Sequence

7-1

 

7.3

Schedule

7-3

 

7.4

Discussion

7-3

Section 8

Technical Feasibility

8-1

 

8.1

Vessel Size, Materials, and Construction

8-1

 

8.2

Inspection

8-2

 

8.3

Maintenance and Repair

8-4

 

8.4

Changes and Modifications

8-5

 

8.5

Safety

8-6

Section 9

Literature Cited

9-1