Back To TOM Reel
Index
T. O. M. Reel
066
Index of Documents
Bag No. 3445
C.I.O.S. Target No. 30/5.01
Ruhrchemie A.G.
Sterkrade – Holton
3445 – 30/5.01 –
9.
Oven 10. Filling 13.
Complete records. 1943. Frames 0001-0429. 429 pages.
10.
Graphical records -
refining. January-August 1944. Frames 0430-0439. 46 pages.
11.
Official test of iron
catalysts. 1944 – some data sheets. Frames 0440-0444. 5 pages.
12.
Ovens 33 & 34 –
conditions and yields. Frames 0445. 1 page.
13.
Sulphur in gas by
various methods – data. 1940-1942. Frame 0447. 1 page.
14.
Instructions for a
general works lab. Control test. May 15, 1944 and December 15, 1943. Frames
0448-0454. 7 pages.
15.
Fine purification
(“Feinreinigung”) – a brief minute. July 9, 1940. Frames 0455-0456. 2 pages.
16.
General synthesis
operation. (Two minutes). April 27 and November 18, 1940. Frames 0457-0469.
13 pages.
17.
Comparison of operation
methods at Rheinpreussen, Essener-Steinkohle and Ruhrbenzin. Undated. Frames
0470-0481. 12 pages.
18.
Operation methods at
Essener-Steinkohle in November 1940. December 18, 1940. Frames 0482-0493. 12
pages.
19.
Determination of
branched chains in mixtures of paraffins. November 11, 1944. Frames
0494-0500. 7 pages.
20.
Standardization of
lubricating oil specifications. Three reports dated December, 1944, undated,
and May, 1942. Frames 0501-0543. 52 pages.
21.
Brief description of
Oxo-process. Undated. Frames 0544-0545. 2 pages.
22.
Cobalt and Thorium
recovery. 1939-1944. Frames 0546-0581. Several pages illegible. 36 pages.
23.
Joint investigation of
Abreiss (“tear off”) temperature of synthetic spirits. May 1, 1942. Frames
0582-0600. 19 pages.
24.
Synthetic fuels octane
number and peroxide formation – joint reports. September 7, 1944 and October 4,
1943. Frames 0601-0701. 101 pages.
25.
Monthly reports of
medium pressure experimental Fischer-Tropsch synthesis plant. September
1938-April 1944. Frames 0702-0886. 185 pages.
26.
Weekly and fortnightly
reports from the medium pressure experimental Fischer-Tropsch synthesis plant.
May 13, 1938 to March 30, 1939. Frames 0887-0960. 74 pages.
27.
Weekly and fortnightly
reports from the medium pressure experimental Fischer-Tropsch synthesis plant.
August, 21, 1942 to August 26, 1943. Frames 0961-1007. 48 pages.
28.
S.I.C.S. (“Arezzo”)
plant – wax production and recovery. February 4, 1943 and November 1942.
Frames 1008-1018. 14 pages
29.
Details of experimental
medium pressure Fischer-Tropsch synthesis ovens. June 8, 1940. and December 17,
1938. Frames 1019-1034. 16 pages.
30.
Conversion and
synthesis (views on theoretical aspects of Fischer-Tropsch synthesis). March,
1941. Frames 1035-1066. 32 pages.
31.
Papers relating to
erection of medium and high pressure experimental plants (by Lurgi). November,
1938 to November, 1939. Frames 1067-1099. 34 pages.
Bag 3445
Continued on Reel 067.
Supplementary
Material
Bag 2288
CIOS Target
30/5.01
1.
Plan of works. Frames
1100-1102. 5 pages.
2.
Apparate-Schema – Oxo
Anlage. Frames 1103-1104. 2 pages.
3.
M. D. Benzinsynthese
Project 22. Frames 1105-1107. 2 pages.
CIOS Target
30/5.04
1.
Hoesch-Benzin
G.m.b.H. map of plant. Frames 1107-1109. 3 pages.