Back To TOM Reel Index

T. O. M. Reel 066

 

Index of Documents

 

Bag No. 3445

C.I.O.S. Target No. 30/5.01

Ruhrchemie A.G.

Sterkrade – Holton

 

3445 – 30/5.01 –

 

9.         Oven 10. Filling 13. Complete records.  1943.  Frames 0001-0429.  429 pages.

10.       Graphical records - refining.  January-August 1944.  Frames 0430-0439.  46 pages.

11.       Official test of iron catalysts. 1944 – some data sheets.  Frames 0440-0444.  5 pages. 

12.       Ovens 33 & 34 – conditions and yields.  Frames 0445.  1 page.

13.       Sulphur in gas by various methods – data.  1940-1942.  Frame 0447.  1 page.

14.       Instructions for a general works lab. Control test.  May 15, 1944 and December 15, 1943.  Frames 0448-0454.  7 pages.

15.       Fine purification (“Feinreinigung”) – a brief minute.  July 9, 1940.  Frames 0455-0456.  2 pages. 

16.       General synthesis operation. (Two minutes).  April 27 and November 18, 1940.  Frames 0457-0469.  13 pages.

17.       Comparison of operation methods at Rheinpreussen, Essener-Steinkohle and Ruhrbenzin.  Undated.  Frames 0470-0481.  12 pages.

18.       Operation methods at Essener-Steinkohle in November 1940.  December 18, 1940.  Frames 0482-0493.  12 pages.

19.       Determination of branched chains in mixtures of paraffins.  November 11, 1944.  Frames 0494-0500.  7 pages.

20.       Standardization of lubricating oil specifications.  Three reports dated December, 1944, undated, and May, 1942.  Frames 0501-0543.  52 pages.

21.       Brief description of Oxo-process.  Undated.  Frames 0544-0545.  2 pages.

22.       Cobalt and Thorium recovery.  1939-1944.  Frames 0546-0581.  Several pages illegible.  36 pages.

23.       Joint investigation of Abreiss (“tear off”) temperature of synthetic spirits.  May 1, 1942.  Frames 0582-0600.  19 pages.

24.       Synthetic fuels octane number and peroxide formation – joint reports.  September 7, 1944 and October 4, 1943.  Frames 0601-0701.  101 pages.

25.       Monthly reports of medium pressure experimental Fischer-Tropsch synthesis plant.  September 1938-April 1944.  Frames 0702-0886.  185 pages.

26.       Weekly and fortnightly reports from the medium pressure experimental Fischer-Tropsch synthesis plant. May 13, 1938 to March 30, 1939.  Frames 0887-0960.  74 pages.

27.       Weekly and fortnightly reports from the medium pressure experimental Fischer-Tropsch synthesis plant.  August, 21, 1942 to August 26, 1943.  Frames 0961-1007.  48 pages.

28.       S.I.C.S. (“Arezzo”) plant – wax production and recovery.  February 4, 1943 and November 1942.  Frames 1008-1018.  14 pages

29.       Details of experimental medium pressure Fischer-Tropsch synthesis ovens.  June 8, 1940. and December 17, 1938.  Frames 1019-1034.  16 pages.

30.       Conversion and synthesis (views on theoretical aspects of Fischer-Tropsch synthesis).  March, 1941.  Frames 1035-1066.  32 pages.

31.       Papers relating to erection of medium and high pressure experimental plants (by Lurgi).  November, 1938 to November, 1939.  Frames 1067-1099.  34 pages.

 

Bag 3445 Continued on Reel 067.

 

Supplementary Material

 

Bag 2288

CIOS Target 30/5.01

 

1.         Plan of works.  Frames 1100-1102.  5 pages.

2.         Apparate-Schema – Oxo Anlage.  Frames 1103-1104.  2 pages.

3.         M. D. Benzinsynthese Project 22.  Frames 1105-1107.  2 pages.

 

CIOS Target 30/5.04

 

1.         Hoesch-Benzin G.m.b.H. map of plant.  Frames 1107-1109.  3 pages.