Return to DOE Report Table of Contents

The Cost of Mercury Removal in an IGCC Plant -
Final Report September 2002

Michael G. Klett
Russell C. Maxwell
Michael D. Rutkowski

Parsons Infrastructure and Technology Group Inc.

In this pdf format, this document has 27 pages and is 160.7kb.

Table of Contents

 

1

Summary

1

2

Introduction

3

3

Background

4

 

 

 

 

3.1

Regulatory Initiatives

4

3.2

Mercury Removal for Conventional Coal-Fired Plants

4

3.3

Mercury Removal Experience in Gasification

5

3.4

Variability of Mercury Content in Coal

6

4

Design Considerations

7

 

 

 

 

 

4.1

Carbon Bed Location

12

4.2

Mercury Concentration

14

4.3

Process Parameters

15

4.4

Mercury Removal

15

4.5

Carbon Replacement Time

16

5

Design Basis

17

6

Cost Estimate

18

7

Sensitivities

20

8

Applicability of Estimate

22

9

Conclusions

23

 
LIST OF TABLES

1

Mercury Content of Coals

6

2 Texaco IGCC Plant - Detailed Composition 9
3 Volumetric Flow Comparison 13
4 Effect of Mercury Removal on Stream Properties 14
5 Design Basis - Mercury Removal by a Carbon Bed - Fixed-Bed Option 17
6 Cost Estimate - Mercury Removal by a Carbon Bed - Fixed-Bed Option 19
7 Sensitivity of Increased Mercury Concentration 20
8 Sensitivity of Key Parameters 20
 
LIST OF FIGURES
1 Modified Block Flow Diagram - Texaco Gasifier-Based IGCC Reference Plant 8
2 Sensitivity of Key Parameters on Mercury Removal Costs 21