| Units of Measure | 1 | 
														
																					| Abbreviations and Terms | 2 | 
														
																					| 1.0 | Introduction | 3 | 
														
																					| 2.0 | Methodology | 4 | 
														
																					| 2.1 | System Boundaries and Data Availability | 5 | 
														
																					| 2.2 | Methodology – Energy Considerations | 9 | 
														
																					| 2.3 | Methodology – Comparison with Other Systems | 9 | 
														
																					| 2.4 | Methodology – Sensitivity Analysis | 9 | 
														
																					| 2.5 | Accounting | 10 | 
														
																					| 2.6 | Time Frame and Issues in Assessing Environmental Consequences | 12 | 
														
																					| 3.0 | Technoeconomic Analysis | 13 | 
														
																					| 3.1 | Biomass Combined Cycle System Description | 16 | 
														
																					| 3.2 | Model Description | 16 | 
														
																					| 3.2.1 | Wood Preparation and Drying | 17 | 
														
																					| 3.2.2 | Gasification | 18 | 
														
																					| 3.2.3 | Gas Turbine | 18 | 
														
																					| 3.2.4 | General Plant Requirements | 19 | 
														
																					| 3.3 | Economic Analysis | 19 | 
														
																					| 3.3.1 | Economic Analysis Methodology | 19 | 
														
																					| 3.3.2 | Capital Cost Estimates | 20 | 
														
																					| 3.3.3 | Overall System Performance | 21 | 
														
																					| 3.3.4 | Economic Analysis Results | 21 | 
														
																					| 4.0 | Description of Process Blocks Studied in the LCA | 22 | 
														
																					| 4.1 | Base Case Feedstock Production Assumptions | 23 | 
														
																					| 4.1.1 | Yield Assumptions and Land Requirements | 23 | 
														
																					| 4.1.2 | Base Case Fertilization Assumptions | 24 | 
														
																					| 4.1.3 | Base Case Herbicide and Pesticide Use | 25 | 
														
																					| 4.1.4 | Water Consumption by Biomass Plantation | 27 | 
														
																					| 4.1.5 | Biogenic Emissions | 27 | 
														
																					| 4.1.6 | Transportation of Farm Chemicals | 27 | 
														
																					| 4.1.7 | Plantation Operations | 28 | 
														
																					| 4.1.8 | Soil Carbon Sequestration Base Case | 31 | 
														
																					| 4.2 | Base Case Biomass Transportation Assumptions | 33 | 
														
																					| 4.3 | Base Case Power Plant Construction & Decommissioning Assumptions | 34 | 
														
																					| 4.4 | Base Case Power Generation Assumptions | 35 | 
														
																					| 4.4.1 | Biomass Storage & Drying | 37 | 
														
																					| 4.4.2 | Gasifier/Combustors | 38 | 
														
																					| 4.4.3 | Gas Turbine and HRSG | 39 | 
														
																					| 4.4.4 | Water Requirements & Treatment | 39 | 
														
																					| 5.0 | Base Case Results by Impact Category | 40 | 
														
																					| 5.1 | Air Emissions | 44 | 
														
																					| 5.1.1 | Carbon Dioxide Emissions | 46 | 
														
																					| 5.1.2 | Air Emissions from the Power Plant:  Non-Methane Hydrocarbons, NOx, and Sox | 54 | 
														
																					| 5.1.3 | Particulate Emissions | 56 | 
														
																					| 5.1.4 | Carbon Monoxide Emissions | 56 | 
														
																					| 5.2 | Water Emissions | 56 | 
														
																					| 5.3 | Energy and Resource Consumption | 56 | 
														
																					| 5.4 | Solid Waste | 65 | 
														
																					| 6.0 | Results Specific to the Three Major Subsystems | 65 | 
														
																					| 6.1 | Base Case Feedstock Production Results | 65 | 
														
																					| 6.2 | Base Case Biomass Transportation Results | 72 | 
														
																					| 6.3 | Base Case Power Plant Construction & Decommissioning Results | 72 | 
														
																					| 6.4 | Base Case Power Generation Results | 78 | 
														
																					|   | 
														
																					| 7.0 | Sensitivity Analysis | 79 | 
														
																					| 7.1 | Feedstock Sensitivity Analysis | 84 | 
														
																					| 7.2 | Transportation Sensitivity Analysis | 84 | 
														
																					| 7.2.1 | Mode of Transportation | 84 | 
														
																					| 7.2.2 | Transportation Distance | 88 | 
														
																					| 7.3 | Power Plant Construction & Decommissioning Sensitivity Analysis | 88 | 
														
																					| 7.4 | Land Filling Versus Recycling Sensitivity Analysis | 89 | 
														
																					| 7.5 | Power Generation Sensitivity Analysis | 89 | 
														
																					| 7.5.1 | NOx Produced | 89 | 
														
																					| 7.5.2 | Power Plant Efficiency | 89 | 
														
																					| 7.5.3 | Operating Capacity Factor | 90 | 
														
																					| 8.0 | Impact Assessment | 90 | 
														
																					| 9.0 | Summary of Results and Discussion | 92 | 
														
																					| 10.0 | Future Work | 94 | 
														
																					| 11.0 | Related Studies | 94 | 
														
																					| 12.0 | Acknowledgements | 96 | 
														
																					| 13.0 | References and Pertinent Literature | 97 |