Overall Project Objectives |
1 |
Summary of all Previous Work Performed on the
Contract |
3 |
Work Performed |
3 |
Major Technical Problems Encountered |
4 |
Major Accomplishments |
5 |
Conclusions and Significant Findings |
6 |
Specific Objectives for the Current year |
7 |
Work Plan for the Current Year |
9 |
Task XI. Obtain Adiabatic Design Data |
9 |
Task XII. Test Direct Methanation Catalysts |
9 |
Task XIII. Determine Catalyst Life |
9 |
Task XIV. Determine Kinetics of Reaction |
9 |
Task XV. Supported Process Development |
10 |
Work Actually Performed During the Current Year |
11 |
Life Tests of GRI-C-500 and GRI-C-600 Series
Catalysts |
11 |
COS Hydrolysis/Hydrogenation reactions |
15 |
Single-Reactor System |
15 |
Steam Reforming of a Sulfur-Containing Natural Gas |
16 |
Major Achievements During the Current Year |
17 |
Major Technical Problems Encountered During the Year |
19 |
Conclusions |
21 |
Specific Objectives and Work Plan for the Next Year |
25 |
Task XI. Obtain Adiabatic Design Data |
25 |
Task XII. Test Direct Methanation Catalysts |
25 |
Task XIII. Determine Catalyst Life |
25 |
Task XIV. Determine Kinetics of Reaction |
26 |
Task XVI. Provide Storage of Chemical By-Products
Derived from the Gasification of Illinois Basin Coal by the Lurgi
Process |
26 |