I. |
Abstract |
1 |
II. |
Objective and Scope of Work |
2 |
III. |
Summary of Progress to Date |
4 |
IV. |
Detailed Description of Technical Progress |
|
|
A. |
Task 1 – Process Studies in Two-Stage Bench-Scale Unit |
5 |
|
1. Run CT-256-6 – Conclusion |
5 |
2. Run CT-256-7 – Startup |
9 |
3. Future Work |
11 |
B. |
Task 2 – Scoping Studies of Fischer-Tropsch Reactor-Wax Upgrading |
11 |
|
1. Thermal Cracking, Hydrocracking, Fluid Catalytic Cracking, and Hydrodewaxing |
11 |
2. Future Work |
|
C. |
Task 3 – Product Evaluation |
11 |
|
1. Improved Fischer-Tropsch Reactor Hydrodynamic Studies |
13 |
2. Product Analysis |
12 |
3. Future Work |
12 |
D. |
Task 4 – Slurry Fischer-Tropsch Reactor Hydrodynamic Studies |
13 |
|
1. Scoping Hydrodynamic Studies Using Short Hot-Flow Columns |
13 |
2. Hydrodynamic Studies Using a Tall Hot-Flow Bubble-Column |
14 |
3. Future Work |
14 |
V. |
Nomenclature |
15 |
VII. |
References |
15 |
|
Tables |
|
|
Figures |
|
Appendix A – Summary of Data from Run CT-256-6 |