Table of Contents

EQUIPMENT

 

 

 

 

 

TOM
Reel

Bag

Item

Frame

REACTOR, aldehyde, Leuna, M 1431-1

181

 

 

6310-6311

              , assembly, Ruhrbenzin, ZM 106/14

90

 

 

20 ‘33

              , boiler tube connections, Gutehoffnungshütte, KS-3546

 90

 

 

 10 ‘1-10 ‘5

              bottoms, Gutehoffnungshütte, KS-3530

90

 

 

10 ’18-10 ‘22

              , brick work for, drawing of

38

3450

14

10 ‘103-10 ‘104

              , calculations of high pressure synthesis

179

 

 

4953-5042

              , catalyst outlet assembly, drawing 3078L-1

86

 

 

1036

                Do., M 8354-2

 

 

 

1037

REACTOR, catalyst space of

67

 

 

129

              , catalyst test, Rheinpreussen, 45105

176

 

 

185

                Do., 45099

 

 

 

186

              , comparison of, 1935

46

3446

 

277-278

              , comparison of results with different shapes of

 13

 3043

 3

 50 ’68-50 ‘69

 

35

3452

8

50 ’65-50 ‘94

              , connector pipes, Gutehoffnungshütte, KS-3655

 90

 

 

 10 ’33-10 ‘36

              construction, detail drawings of

12

3500

24-25

20 ’52-20 ‘55

              construction, drawing of counterweight supports

 38

 3450

 14

 20 ‘50

              , construction of Krupp synthesis

37

3451

30

30 ‘28

              , control instruments of individual, supervision of

 72

 

 

 58-75

              , cooling of synthesis, by means of fused alkali nitrates

 48

 

 

 788-793

              , cooling system of, detailed drawing

38

3450

14

20 ’21-20 ‘33

 

 

 

 

20 ’34-20 ‘42

              , cover and connections of, drawing, Mannesmann 45118, for Rheinpreussen

 195

 

 

31489

                Do., 45099

 

 

 

31490

              cover, Gutehoffnungshütte, KS-3531

90

 

 

10 ‘6-10 ‘8

              detail, drawing 45088

176

 

 

194

                Do., I. G., M 2725-1

 

 

 

195

              , details of experimental

66

 

 

1019-1034

              , different construction of

154

 

 

326-330

              , distributor pipes, Gutehoffnungshütte, KS-3548

 90

 

 

 10 ’28-10 ‘32

              , emptying of

43

2719

 

508-509

              , engineering drawings of

36

3454

19

20 ’52-20 ‘55

 

39

3450

47

70 ’22-70 ‘88

 

 

 

 

80 ‘1-80 ‘11

 

41

2744

28

50 ‘121-50 ‘126

 

46

 

 

764-765

 

134

 

 

50 ‘136-50 ‘141

              , experimental

84

 

 

2..10

 

118

 

 

40 ’93-40 ‘109

              , experimental tubular, detail, 45179

176

 

 

188

              , experiments in drying spent catalyst before unloading

 35

3440

85

 20 ‘102

              , 15 atm pressure, drawing, RW 1238.1c, Gutehoffnungshütte

 89

 3448

 2

 90 ’16-90 ‘19