EQUIPMENT |
|
|
|
|
|
TOM |
Bag |
Item |
Frame |
REACTOR, aldehyde, Leuna, M 1431-1 |
181 |
|
|
6310-6311 |
“ , assembly, Ruhrbenzin, ZM 106/14 |
90 |
|
|
20 ‘33 |
“ , boiler tube connections, Gutehoffnungshütte, KS-3546 |
90 |
|
|
10 ‘1-10 ‘5 |
“ bottoms, Gutehoffnungshütte, KS-3530 |
90 |
|
|
10 ’18-10 ‘22 |
“ , brick work for, drawing of |
38 |
3450 |
14 |
10 ‘103-10 ‘104 |
“ , calculations of high pressure synthesis |
179 |
|
|
4953-5042 |
“ , catalyst outlet assembly, drawing 3078L-1 |
86 |
|
|
1036 |
Do., M 8354-2 |
|
|
|
1037 |
REACTOR, catalyst space of |
67 |
|
|
129 |
“ , catalyst test, Rheinpreussen, 45105 |
176 |
|
|
185 |
Do., 45099 |
|
|
|
186 |
“ , comparison of, 1935 |
46 |
3446 |
|
277-278 |
“ , comparison of results with different shapes of |
13 |
3043 |
3 |
50 ’68-50 ‘69 |
|
35 |
3452 |
8 |
50 ’65-50 ‘94 |
“ , connector pipes, Gutehoffnungshütte, KS-3655 |
90 |
|
|
10 ’33-10 ‘36 |
“ construction, detail drawings of |
12 |
3500 |
24-25 |
20 ’52-20 ‘55 |
“ construction, drawing of counterweight supports |
38 |
3450 |
14 |
20 ‘50 |
“ , construction of Krupp synthesis |
37 |
3451 |
30 |
30 ‘28 |
“ , control instruments of individual, supervision of |
72 |
|
|
58-75 |
“ , cooling of synthesis, by means of fused alkali nitrates |
48 |
|
|
788-793 |
“ , cooling system of, detailed drawing |
38 |
3450 |
14 |
20 ’21-20 ‘33 |
|
|
|
|
20 ’34-20 ‘42 |
“ , cover and connections of, drawing, Mannesmann 45118, for Rheinpreussen |
195 |
|
|
31489 |
Do., 45099 |
|
|
|
31490 |
“ cover, Gutehoffnungshütte, KS-3531 |
90 |
|
|
10 ‘6-10 ‘8 |
“ detail, drawing 45088 |
176 |
|
|
194 |
Do., I. G., M 2725-1 |
|
|
|
195 |
“ , details of experimental |
66 |
|
|
1019-1034 |
“ , different construction of |
154 |
|
|
326-330 |
“ , distributor pipes, Gutehoffnungshütte, KS-3548 |
90 |
|
|
10 ’28-10 ‘32 |
“ , emptying of |
43 |
2719 |
|
508-509 |
“ , engineering drawings of |
36 |
3454 |
19 |
20 ’52-20 ‘55 |
|
39 |
3450 |
47 |
70 ’22-70 ‘88 |
|
|
|
|
80 ‘1-80 ‘11 |
|
41 |
2744 |
28 |
50 ‘121-50 ‘126 |
|
46 |
|
|
764-765 |
|
134 |
|
|
50 ‘136-50 ‘141 |
“ , experimental |
84 |
|
|
2..10 |
|
118 |
|
|
40 ’93-40 ‘109 |
“ , experimental tubular, detail, 45179 |
176 |
|
|
188 |
“ , experiments in drying spent catalyst before unloading |
35 |
3440 |
85 |
20 ‘102 |
“ , 15 atm pressure, drawing, RW 1238.1c, Gutehoffnungshütte |
89 |
3448 |
2 |
90 ’16-90 ‘19 |