Table of Contents

AIR SEPARATION

 

 

 

 

 

TOM
Reel

Bag

Item

Frame

MAKEUP air circuit, pressure drop in

181

 

 

6905

NITROGEN and oxygen production, flowsheet of

117

 

 

60 ‘8-60 ‘9

     “         column, pure

117

 

 

50 ‘25-50 ‘28

     “         , monthly report on production of

39

3450

35

40’ 90

     “         regeneration, resistance curve of

181

 

 

6906

     “         separation, flowsheet of

176

 

 

248

     “         , thermodynamic properties of, at low temperatures and pressures to 200 atm, by S. Y. Gersh and O. A. Ben‘yaminovich, Kislorod 1947, No. 5, pp. 21-26, in Russian

258

 

 

60 ‘58-60 ‘67

OPERATING directions for air separation plant, 1944

195

 

 

31213-31233

     “         instructions for Linde-Frδnkl oxygen unit

175

 

 

70570-70586

                                Translation by M. W. Kellogg Co.

244

 

 

100 ‘85-100 ‘104

     “         instructions for production of oxygen and nitrogen

 235

 

 

 5-109

OPERATION balance of two days’ run of Leuna Linde-Frankl unit

 117

 

 

10 ‘47-10 ‘53

OPERATIONS, yearly report of nitrogen and oxygen plants and auxiliaries, 1938, 1942

117

 

 

20 ‘80-20 ‘122

 

 

 

 

30 ‘1-30 ‘33

OXYGEN and nitrogen production, flowsheet of

117

 

 

60 ‘8-60 ‘9

     “         , future requirements in, (1933)

117

 

 

10 ‘54-10 ‘59

     “         , graph for measuring amounts of, oxygen plant

181

 

 

6907

     “         , graphic presentation of analytical results on

117

 

 

50 ‘1-50 ‘6

     “         , impure, re-circulation of

117

 

 

0 ‘47-0 ‘57

     “         plant

259

 

 

884

     “         plant, flow diagram of Leuna, 71.60, 70.77

117

 

 

0 ‘42-0 ‘46

     “         unit at Boehlen, flow diagram of

117

 

 

50 ‘45

     “         yield in relation to oxygen content of pure nitrogen

 117

 

 

50 ‘10

PIPELINE layout, Linde, engineering drawing

235

 

 

320-340

     “         to installation room, engineering drawing, Linde

 235

 

 

345-373

PIPELINES for small oxygen plant

235

 

 

486-538

POWER consumption in different parts of aggregate

117

 

 

50 ‘66-50 ‘69

     “         requirements for air separation

117

 

 

0 ‘1-0 ‘4

                                Translation T-409

274

 

 

1126-1129

PRECOOLING of air

117

 

 

10 ‘60-10 ‘63

PRODUCTION figures of oxygen plant in Boehlen, daily

 117

 

 

50 ‘22-50 ‘24

PURTIY of oxygen and nitrogen from liquid air, supervision of, 1939

195

 

 

31234-31246

REGENERATORS for Linde-Frδnkl installations and overall utilities requirements for Linde-Frδnkl oxygen producing units, calculation of, reported by John Robell

240

 

 

50 ‘52-50 ‘61

REPAIRS on Leuna Linde-Frδnkl installation, list of

117

 

 

0 ‘32-0 ‘36

REVERSING valve, engineering drawing, Linde

235

 

 

454-455

SINGLE column, type E., oxygen production unit, 5 cbm O2 (99.7%/hr).  Drawings.

235

 

 

 175-195

STARTING Linde-Frankl unit

117

 

 

40 ‘73-40 ‘75

     “         second unit of Linde-Frδnkl in Leuna

117

 

 

10 ‘27-10 ‘46

TURBO compressor unit, Linde-Frδnkl installation, 36,000 cbm/hr

 117

 

 

30 ‘41-30 ‘45

     “         compressors, starting, Linde-Frδnkl

117

 

 

30 ‘49-30 ‘66

UPPER column of Linde-Frδnkl unit

117

 

 

50 ‘39-50 ‘41

UTILITIES requirements, overall and regenerators required for Linde-Frδnkl oxygen producing units, reported by John Robell

240

 

 

50 ‘52-50 ‘61

VAPORIZATION countercurrent, engineering drawing, Linde

 235

 

 

376-377

WATER cut off oxygen plant, scale drawing

181

 

 

6899

WELDS of pipelines of alkali towers, testing, Linde-Frankl

 117

 

 

10 ‘71-10 ‘77