Table of Contents

RUHROEL, WELHEIM

 

 

 

 

TOM
Reel

Bag Item Frame

CONVERTER, vapor phase, assembling, Ruhroel, drawing 1208-1

 88

 

 

1

 

EXTRACT, coal, filtration of, at Welheim

256

 

 

380-385

                              Translation T-301

256

 

 

385a-385d

                              Translation T-301

273

 

 

630-633

EXTRACTION, coal, plant, flowsheet of

150

 

 

350-360

              , coal, plant of Ruhroel G.m.b.H., reported by H.H. Lowry and H. J. Rose

 198

 

 

20 ‘14-20 ‘21

FILTRATION plant

150

 

 

348-349

FUEL oil and aviation gasoline, flowsheet for the production of

 150

 

 

 333

GASOLINE, Welheim, as a high test fuel for aviation

 8

 

2732

 

4

 30 ‘33-30 ‘37

HYDROGEN, flowsheet for the production of

150

 

 

334

HYDROGENATION of pitch at Welheim

126

 

 

1051-1052

              plant at Welheim

150

 

 

323-332

              plant, Bottrop-Welheim, reported by C. Cockram

 196

 

 

 40 ‘27-40 ‘45

INSPECTION of Welheim by I.G. Staff members

126

 

 

1043-1049

PRODUCTION figures, 1944, Ruhroel

212

 

 

0 ‘57-0 ‘69

REPORT, supplementary, on the Ruhroel hydrogenation plant, Welheim, reported by W. F. Faragher and W. A. Horne

 199

 

 

60 ‘13-60 ‘17

STALLS, high pressure, assembly, Ruhroel, drawing FW 1003-1

 88

 

 

18

 

STARTING up the Welheim plant

8

2732

4

30 ‘26-30 ‘32

VISIT to Welheim plant

204

 

 

608-613

 

 

 

 

 

RUSYN project data

47

 

 

1223-1228

RUTGERSWERKE A.G.

 

 

 

 

 

 

 

 

 

ANTHRACENE plant, drawing of

150

 

 

82

              recovery plant, flowsheet for

150

 

 

83

TAR distillation, plant for

150

 

 

72-74

 

 

 

 

 

RYRUSYN

 

 

 

 

 

 

 

 

 

THE Ryrusyn project operations with the iron catalyst

 39

 3450

 45

 60 ‘45-60 ‘72

 

 

 

 

 

SACHSISCHE WERKE

 

 

 

 

LURGI high pressure gasification, A.G. Sachsische Werke, Boehlen, reported by H. Hollings and L. L. Newman

 197

 

 

 50 ‘32-50 ‘42

 

 

 

 

 

SCHAFFGOTSCH-BENZIN

 

 

 

 

 

 

 

 

 

INSTALLATION proposals, discussion of

33

3440

17

30 ‘129-30 ‘140

PLANT and operation details

49

 

 

175-262

              , discussion of the Schaffgotsch

35

3452

19

60 ‘98-60 ‘119