KUCKUCK (K.K.) |
|
|
|
|
TOM Reel |
Bag | Item | Frame | |
AIR conditioning and fire protection |
73 |
|
|
307-326 |
BOILER house construction difficulties |
73 |
|
|
294-296 |
CODES, correspondence |
18 |
|
|
43..402-43..40* |
EQUIPMENT, index to |
73 |
|
|
327-337 |
EXCAVATION drawing Ku 1, 17418-1a |
73 |
|
|
394 |
“ schedule Ku 1, 17849-8 |
73 |
|
|
364 |
FIRE protection and air conditioning |
73 |
|
|
307-326 |
FLOW diagram Ku 1, BSK 113 |
73 |
|
|
340-341 |
“ diagram Ku 1 (detailed), BSK 105 |
73 |
|
|
349-350 |
HYDROGENATION plant, a set of drawings of the plan and layout of the Kuckuck underground |
24 |
3391 |
1 |
|
|
|
3391 |
36 |
|
“ stall, double, M 5685-1 |
179 |
|
|
4849-4850 |
KUCKUCK plans, flowsheet of the |
193 |
|
|
23371 |
“ I plant, Niedersachswerfen, reported by J. F. Ellis and L.L. Hirst |
196 |
|
|
60 ‘13-60 ‘17 |
“ project |
19 |
|
|
106.1328-106.13** |
LOW pressure lines Ku 1, BSK 106 |
73 |
|
|
363 |
MATERIALS shipped to the Kuckuck plant |
73 |
|
|
262-293 |
PLAN Ku 1, drawing 17750-1 |
73 |
|
|
351-359 |
“ Ku II, drawing 17545-1 |
73 |
|
|
372 |
RAILROADS, Ku 1, drawing 17446-1 |
73 |
|
|
365-370 |
TANK contents, list of |
73 |
|
|
338 |
“ , form Ku II, drawing 17410-1 |
73 |
|
|
395-403 |
STALLS, underground arrangement of, M 12617-2 |
179 |
|
|
4836 |
UNDERGROUND plant, general information on the |
73 |
|
|
297-306 |
VAPOR phase stall, flowsheet of the, (5058 and 6434) |
193 |
|
|
23082 |
VENTILATION |
73 |
|
|
339 |
“ plan, Ku 1, drawing 17761-1 |
73 |
|
|
382 |
WATER flow diagram, Ku 1, drawing 17693-8 |
73 |
|
|
360-362 |
|
|
|
|
|
KUCKUCK (K.K.), 117 drawings for the K. K. project, made by the Ammoniakwerk Merseburg (Leuna), with English index, not listed separately in the present index. |
133 |
|
|
|