Table of Contents

KUCKUCK (K.K.)

 

 

 

 

TOM
Reel
Bag Item Frame

AIR conditioning and fire protection

73

 

 

307-326

BOILER house construction difficulties

73

 

 

294-296

CODES, correspondence

18

 

 

43..402-43..40*

EQUIPMENT, index to

73

 

 

327-337

EXCAVATION drawing Ku 1, 17418-1a

73

 

 

394

              schedule Ku 1, 17849-8

73

 

 

364

FIRE protection and air conditioning

73

 

 

307-326

FLOW diagram Ku 1, BSK 113

73

 

 

340-341

              diagram Ku 1 (detailed), BSK 105

73

 

 

349-350

HYDROGENATION plant, a set of drawings of the plan and layout of the Kuckuck underground

 24

 3391

 1

 

 

3391

36

 

              stall, double, M 5685-1

179

 

 

4849-4850

KUCKUCK plans, flowsheet of the

193

 

 

23371

              I plant, Niedersachswerfen, reported by J. F. Ellis and L.L. Hirst

 196

 

 

 60 ‘13-60 ‘17

              project

19

 

 

106.1328-106.13**

LOW pressure lines Ku 1, BSK 106

73

 

 

363

MATERIALS shipped to the Kuckuck plant

73

 

 

262-293

PLAN Ku 1, drawing 17750-1

73

 

 

351-359

              Ku II, drawing 17545-1

73

 

 

372

RAILROADS, Ku 1, drawing 17446-1

73

 

 

365-370

TANK contents, list of

73

 

 

338

           , form Ku II, drawing 17410-1

73

 

 

395-403

STALLS, underground arrangement of, M 12617-2

 179

 

 

4836

UNDERGROUND plant, general information on the

 73

 

 

 297-306

VAPOR phase stall, flowsheet of the, (5058 and 6434)

 193

 

 

23082

VENTILATION

73

 

 

339

              plan, Ku 1, drawing 17761-1

73

 

 

382

WATER flow diagram, Ku 1, drawing 17693-8

73

 

 

360-362

 

 

 

 

 

KUCKUCK (K.K.), 117 drawings for the K. K. project, made by the Ammoniakwerk Merseburg (Leuna), with English index, not listed separately in the present index.

 133