GELSENBERG |
|
|
|
|
|
TOM REEL |
BAG |
ITEM |
FRAMES |
PLANT, description of, Gelsenberg Benzin I-III |
4 |
2747 |
17 |
80 ‘96-80 ‘101 |
Translation by Vacuum Oil Co. |
143 |
|
|
10 ‘52-10 ‘55 |
“ , drawing |
89 |
2747 |
82 |
10 ‘27-10 ‘35 |
“ layout, drawing |
89 |
2747 |
83 |
10 ‘36-10 ‘47 |
POWER consumption, electric, in the high pressure stalls and pumps, drawing |
89 |
2747 |
59 |
0 ‘40-0 ‘41 |
PREHEATER brickwork, Gelsenber, L 3440-1, drawing |
89 |
2747 |
90 |
20 ‘20-20 ‘24 |
“ brickwork, L 3677-1, drawing |
89 |
2747 |
96 |
20 ‘46-20 ‘49 |
“ detail, N 4846-2, drawing |
89 |
2747 |
95 |
20 ‘41-20 ‘45 |
“ , efficiency of |
89 |
2747 |
41 |
0 ‘22 |
“ , enlarged, drawing, 1812-2 |
89 |
2747 |
2 |
40 ‘63-40 ‘64 |
“ hairpin, drawing, N 10340-2 |
89 |
2746 |
18 |
50 ’34-50 ‘38 |
“ , hairpins in gas heated, drawing N 653-8 |
89 |
2746 |
14 |
40 ‘3-40 ‘6 |
“ , liquid phase, BK 15h-8, drawing |
89 |
2747 |
51 & 52 |
0 ‘32-0 ‘33 |
“ , liquid phase, drawing 1156-2 |
89 |
2746 |
3 |
40 ‘65-40 ‘69 |
“ , liquid phase, layout of, drawing L 10300-2 |
89 |
2747 |
91 |
20 ‘25-20 ‘29 |
PRESSURE release, liquid and vapor phase, drawing N 1068-1, N 1060-1, N 1068b-1 |
89 |
2746 |
16-18 |
40 ‘10-40 ‘34 |
PRESSURE vessel, drawing, 1212-1, 2232a-1 |
89 |
2746 |
7-8 |
50 ‘8-50 ‘15 |
PRODUCTION figures for Gelsenberg, 1944 |
212 |
|
|
0 ‘40-0 ‘48 |
“ , gasoline, in relation to converters in use, monthly data on, 1939-1941, graph |
89 |
2747 |
79 |
10 ‘23 |
PUMP, injection, flow diagram, 1195-2 |
89 |
2746 |
1 |
40 ‘58-40 ‘62 |
“ layout, N 1121-1, drawing |
89 |
2746 |
6 |
30 ‘27 |
“ , paste and centrifugal, drawing |
89 |
2747 |
39 |
0 ‘20 |
“ , paste, layout, drawing 1844-4 |
89 |
2746 |
5 |
50 ‘2 |
REFINING, coal gasoline |
3 |
2745 |
18 |
80 ‘23-80 ‘27 |
REGULATOR, flushing oil, drawing, 1860-2 |
89 |
2746 |
16 |
50 ‘25-50 ‘28 |
SHIPMENTS, barge, in 1941 |
3 |
2745 |
6 |
30 ‘89-40 ‘95 |
“ , records of monthly, 1941 |
3 |
2745 |
5 |
30 ‘79-30 ‘88 |
SHUTTING down stall 301 |
3 |
2745 |
18 |
60 ‘50-60 ‘59 |
“ down of stall 302, Gelsenberg |
3 |
2745 |
18 |
60 ‘69 |
“ down the liquid phase stall and its conversion to a three-converter stall, 1940-1943 |
3 |
2745 |
18 |
60 ‘41-60 ‘49 |
SPLITTING and saturation stalls, monthly summaries, 1940-1941 |
3 |
2745 |
15 |
0 ‘21 |
“ stall with gas preheater and 3 converters, 6434, drawing |
89 |
2747 |
40 |
60 ‘1-60 ‘22 |
STABILIZATION and distillation, monthly summaries |
3 |
2745 |
9 |
40 ‘23-40 ‘33 |
“ stall 7019, drawing, 751-8 |
89 |
2747 |
66 |
10 ‘8 |
START of the reaction in the liquid phase, comparison of the temperatures in the different stalls, graph |
89 |
2747 |
55 |
0 ‘35-0 ‘36 |
STRIPPING and iso-butane plant, monthly statements of, 1941 |
3 |
2745 |
7 |
40 ‘1-40 ‘8 |
TEMPERATURES of the liquid phase stall, graphs of |
89 |
2747 |
47 |
0 ‘28 |
THERMOCOUPLE inset, pressure resistant, drawing, BK 3084-4 |
89 |
2746 |
4 |
50 ‘1 |
VACUUM installation, BK 726-4, drawing |
89 |
2747 |
33 |
0 ‘14 |
VALVE, 5 mm L, drawing, NB 2366-4 |
89 |
2746 |
13 |
50 ‘22 |
“ grouping layout for differential pressure gauge, drawing 1022-2 |
89 |
2746 |
6 |
50 ‘3-50 ‘7 |
“ , membrane, preliminary regulation for, drawing BK 3510-4 |
89 |
2746 |
12 |
50 ‘21 |
VAPOR phase stall flow diagram, 7019 catalyst, 1192-2 |
89 |
2747 |
29 |
0 ‘1-0 ‘10 |
Do., 11926-2 |
|
|
|
0 ‘11 |
WASH oil and recycle gas scrubbing, BK 721, drawing |
89 |
2747 |
34 |
0 ‘15 |
GELSENKIRCHEN, layout of tar distillation plant |
150 |
|
|
50 |