Table of Contents

GELSENBERG

 

 

 

 

TOM REEL

BAG

ITEM

FRAMES

PLANT, description of, Gelsenberg Benzin I-III

4

2747

17

80 ‘96-80 ‘101

                              Translation by Vacuum Oil Co.

143

 

 

10 ‘52-10 ‘55

              , drawing

89

2747

82

10 ‘27-10 ‘35

              layout, drawing

89

2747

83

10 ‘36-10 ‘47

POWER consumption, electric, in the high pressure stalls and pumps, drawing

 89

 2747

 59

 0 ‘40-0 ‘41

PREHEATER brickwork, Gelsenber, L 3440-1, drawing

 89

 2747

 90

 20 ‘20-20 ‘24

              brickwork, L 3677-1, drawing

89

2747

96

20 ‘46-20 ‘49

              detail, N 4846-2, drawing

89

2747

95

20 ‘41-20 ‘45

              , efficiency of

89

2747

41

0 ‘22

              , enlarged, drawing, 1812-2

89

2747

2

40 ‘63-40 ‘64

              hairpin, drawing, N 10340-2

89

2746

18

50 ’34-50 ‘38

              , hairpins in gas heated, drawing N 653-8

89

2746

14

40 ‘3-40 ‘6

              , liquid phase, BK 15h-8, drawing

89

2747

51 & 52

0 ‘32-0 ‘33

              , liquid phase, drawing 1156-2

89

2746

3

40 ‘65-40 ‘69

              , liquid phase, layout of, drawing L 10300-2

 89

 2747

 91

 20 ‘25-20 ‘29

PRESSURE release, liquid and vapor phase, drawing N 1068-1, N 1060-1, N 1068b-1

 89

 2746

 16-18

 40 ‘10-40 ‘34

PRESSURE vessel, drawing, 1212-1, 2232a-1

89

2746

7-8

50 ‘8-50 ‘15

PRODUCTION figures for Gelsenberg, 1944

212

 

 

0 ‘40-0 ‘48

              , gasoline, in relation to converters in use, monthly data on, 1939-1941, graph

 89

 2747

 79

 10 ‘23

PUMP, injection, flow diagram, 1195-2

89

2746

1

40 ‘58-40 ‘62

              layout, N 1121-1, drawing

89

2746

6

30 ‘27

              , paste and centrifugal, drawing

89

2747

39

0 ‘20

              , paste, layout, drawing 1844-4

89

2746

5

50 ‘2

REFINING, coal gasoline

3

2745

18

80 ‘23-80 ‘27

REGULATOR, flushing oil, drawing, 1860-2

89

2746

16

50 ‘25-50 ‘28

SHIPMENTS, barge, in 1941

3

2745

6

30 ‘89-40 ‘95

              , records of monthly, 1941

3

2745

5

30 ‘79-30 ‘88

SHUTTING down stall 301

3

2745

18

60 ‘50-60 ‘59

              down of stall 302, Gelsenberg

3

2745

18

60 ‘69

              down the liquid phase stall and its conversion to a three-converter stall, 1940-1943

 3

 2745

 18

60 ‘41-60 ‘49

SPLITTING and saturation stalls, monthly summaries, 1940-1941

 3

 2745

15

0 ‘21

              stall with gas preheater and 3 converters, 6434, drawing

 89

 2747

40

60 ‘1-60 ‘22

STABILIZATION and distillation, monthly summaries

 3

 2745

 9

40 ‘23-40 ‘33

              stall 7019, drawing, 751-8

89

2747

66

10 ‘8

START of the reaction in the liquid phase, comparison of the temperatures in the different stalls, graph

 89

 2747

 55

0 ‘35-0 ‘36

STRIPPING and iso-butane plant, monthly statements of, 1941

3

 2745

 7

40 ‘1-40 ‘8

TEMPERATURES of the liquid phase stall, graphs of

 89

 2747

 47

0 ‘28

THERMOCOUPLE inset, pressure resistant, drawing, BK 3084-4

 89

 2746

 4

50 ‘1

VACUUM installation, BK 726-4, drawing

89

2747

33

0 ‘14

VALVE, 5 mm L, drawing, NB 2366-4

89

2746

13

50 ‘22

              grouping layout for differential pressure gauge, drawing 1022-2

 89

2746

6

 50 ‘3-50 ‘7

              , membrane, preliminary regulation for, drawing BK 3510-4

 89

 2746

 12

50 ‘21

VAPOR phase stall flow diagram, 7019 catalyst,

              1192-2

 89

2747

29

0 ‘1-0 ‘10

                Do., 11926-2

 

 

 

0 ‘11

WASH oil and recycle gas scrubbing, BK 721, drawing

 89

 2747

34

0 ‘15

GELSENKIRCHEN, layout of tar distillation plant

 150

 

 

 50