GELSENBERG |
|
|
|
|
|
TOM REEL |
BAG |
ITEM |
FRAMES |
GAS balances, monthly, 1940 |
3 |
2745 |
3 |
30 ‘51-30 ‘62 |
“ circuit, 30 atm, flow diagram 1073 |
89 |
2747 |
100 |
30 ‘6-30 ‘9 |
“ , lean, net, liquid and vapor phase, drawing |
89 |
2747 |
42 |
0 ‘23 |
“ , recycle, and wash oil scrubbing, BK 721, drawing |
89 |
2747 |
34 |
0 ‘15 |
“ , recycle, flow diagram, 700 atm, 1360-4 |
89 |
2746 |
14 |
50 ‘23 |
GAS, rich, composition and number of compressors, graph |
89 |
2747 |
53 |
0 ‘34 |
“ scrubbing, recycle, BK 640-4, drawing |
89 |
2747 |
35 |
0 ‘16 |
“ scrubbing, recycle, vapor phase, BK 797, drawing |
89 |
2747 |
36 |
0 ‘17 |
“ scrubbing, recycle, with 4 scrubbers and catchpot, flow diagram, 679-8 |
89 |
2746 |
11 |
50 ‘20 |
“ summaries, monthly, for 1941 |
3 |
2745 |
4 |
30 ‘63-30 ‘78 |
GASOLINE, motor, 41.7 te/hr., production of, hydrogenation production and utilization |
89 |
2747 |
64 |
10 ‘3 |
GELSENBERG hydrogenation plant, reported by C. Cockram |
196 |
|
|
40 ‘46-40 ‘71 |
GRINDING, coal, monthly summaries, 1941 |
3 |
2745 |
12 |
50 ‘12-50 ‘21 |
HEAT exchanger, N 1910-1, drawing |
89 |
2747 |
92 |
20 ‘30-20 ‘33 |
“ “ , N 1909 drawing |
89 |
2747 |
84 |
10 ’48-10 ‘52 |
HIGH pressure process, operations of centrifuges, summary of; graph |
89 |
2747 |
56 |
0 ‘37 |
HOLD pipeline to the conical bottom, drawing |
89 |
2747 |
46 |
0 ‘27 |
“ unit, low pressure side, drawing |
89 |
2747 |
45 |
0 ‘26 |
HYDROGENATION balance, 1942-1943, graphs |
89 |
2747 |
72 |
10 ‘16 |
“ gas production and utilization, drawing |
89 |
2747 |
57 & 58 |
0 ’38-0 ‘39 |
“ , monthly reaction volume data in, graph |
89 |
2747 |
60 |
0 ‘42 |
“ practices, comparison of Poelitz and Gelsenberg |
75 |
|
|
479-480 |