Table of Contents

GELSENBERG

 

 

 

 

TOM REEL

BAG

ITEM

FRAMES

GAS balances, monthly, 1940

3

2745

3

30 ‘51-30 ‘62

              circuit, 30 atm, flow diagram 1073

89

2747

100

30 ‘6-30 ‘9

              , lean, net, liquid and vapor phase, drawing

 89

 2747

 42

 0 ‘23

              , recycle, and wash oil scrubbing, BK 721, drawing

 89

 2747

 34

 0 ‘15

              , recycle, flow diagram, 700 atm, 1360-4

89

2746

14

50 ‘23

GAS, rich, composition and number of compressors, graph

 89

 2747

 53

 0 ‘34

              scrubbing, recycle, BK 640-4, drawing

89

2747

35

0 ‘16

              scrubbing, recycle, vapor phase, BK 797, drawing

 89

 2747

 36

 0 ‘17

              scrubbing, recycle, with 4 scrubbers and catchpot, flow diagram, 679-8

 89

 2746

 11

 50 ‘20

              summaries, monthly, for 1941

3

2745

4

30 ‘63-30 ‘78

GASOLINE, motor, 41.7 te/hr., production of, hydrogenation production and utilization

 89

 2747

 64

 10 ‘3

GELSENBERG hydrogenation plant, reported by C. Cockram

 196

 

 

40 ‘46-40 ‘71

GRINDING, coal, monthly summaries, 1941

3

2745

12

50 ‘12-50 ‘21

HEAT exchanger, N 1910-1, drawing

89

2747

92

20 ‘30-20 ‘33

                  , N 1909 drawing

89

2747

84

10 ’48-10 ‘52

HIGH pressure process, operations of centrifuges, summary of; graph

 89

 2747

 56

 0 ‘37

HOLD pipeline to the conical bottom, drawing

89

2747

46

0 ‘27

              unit, low pressure side, drawing

89

2747

45

0 ‘26

HYDROGENATION balance, 1942-1943, graphs

89

2747

72

10 ‘16

              gas production and utilization, drawing

89

2747

57 & 58

0 ’38-0 ‘39

              , monthly reaction volume data in, graph

89

2747

60

0 ‘42

              practices, comparison of Poelitz and Gelsenberg

 75

 

 

479-480