BRABAG, a notebook, from Dr. Hausmanns files. Short abstracts from literature and patents. |
180 |
|
|
5133-5834 |
|
|
|
|
|
TOM Reel |
Bag | Item | Frame | |
HYDROGENATION feeds and products, properties of, May 1945 |
11 |
3500 |
11 |
80 23-80 26 |
HYDROGENATION of Boehlen tar at 250 atm over catalyst 8376 |
24 |
|
|
1..25-1..26 |
MAP of the Boehlen plant |
12 |
3500 |
36-39 |
40 1-40 16 |
MAPS, various, ground plants, and drawings of plant areas, plants, buildings, location of equipment, etc., Boehlen and Magdeburg |
13 |
3500 |
85-107 |
10 4-10 33 |
OPERATIONAL results, discussions of, for August 1941 in Boehlen |
12 |
3500 |
22 |
0 1-0 17 |
OPERATIONS, monthly report of, for 1942 at Boehlen |
129 |
|
|
10 108-10 124 |
|
|
|
|
20 1-20 98 |
|
|
|
|
30 1-30 7 |
, monthly reports on plant, Brabag, 1943, 1944 |
11 |
3500 |
1-7 |
60 1-60 61 |
|
|
|
|
70 1-70 72 |
|
|
|
|
80 1-80 18 |
OXYGEN plant, oxygen graph, EW VIII 289 |
181 |
|
|
6874 |
, assembly of 450 mm compressor, A 7358 |
195 |
|
|
31247 |
plant, compressed air graph EW VIII 287 |
181 |
|
|
6871 |
OXYGEN plant, low pressure air graph, EW VIII 288 |
181 |
|
|
6873 |
plant, nitrogen graph, EW VIII 290 |
181 |
|
|
6872 |
PRODUCTION figures for Boehlen, 1944 |
212 |
|
|
0 70-0 100 |
, graphical representation of, 1943-1944 |
11 |
3500 |
9 |
80 20 |
, planned, in Boehlen during 1943-1944 |
12 |
3500 |
33 |
30 16 |
records for 1940-1944, Boehlen gas works |
12 |
3500 |
33 |
30 53-30 62 |
reports including cost accounting for Boehlen and Madgeburg for 1943 |
12 |
3500 |
22a |
0 18-0 33 |
|
|
|
|
10 1-10 147 |
|
|
|
|
20 1-20 50 |
PURIFICATION, existing tower installations, He 63172 F (gas) |
195 |
|
|
30873 |
installation for high pressure gas plant (sulfur removal), Boehlen |
195 |
|
|
30900-30901 |
towers for desulfurizing high pressure gas |
195 |
|
|
30902-30903 |
REPAIRS on stall 5 |
182 |
|
|
7965-8021 |
REPORTS, monthly, from June to August, 1940 |
192 |
|
|
22341-22361 |
SULFURIC acid plant, Boehlen |
193 |
|
|
23091-23096 |
TAR stall #2, flowsheet, Boehlen Do., stall #3 |
179 179 |
|
|
4868 4870 |
THERMOCOUPLE locations in the Boehlen liquid and vapor phase stalls |
193 |
|
|
23134-23137 |
TOLUENE production, preliminary estimates of, in Boehlen |
193 |
|
|
23117-23131 |
TTH stall 3, operating life of |
11 |
3500 |
14 |
90 1-90 6 |
WINKLER gasifier, phenolated water circuit, Brabag-Boehlen 316-1 |
195 |
|
|
30918 |