BRABAG, a notebook, from Dr. Hausmanns files. Short abstracts from literature and patents. |
180 |
|
|
5133-5834 |
|
|
|
|
|
BRABAG-BOEHLEN |
|
|
|
|
TOM Reel |
Bag | Item | Frame | |
ACCEPTANCE of two stationary boilers |
181 |
|
|
6847-6865 |
BOEHLEN plant, handbook of processes, equipment layout, flow diagrams and building layouts of the |
191 |
|
|
24672-24720 |
|
|
|
|
24721-24775 |
BRABAG I plant at Boehlen, report on visit to, by Major Ellis |
123 |
|
|
70 30-70 73 |
I plant, Boehlen, reported by J. F. Ellis |
196 |
|
|
50 61-50 71 |
|
|
|
|
60 1-60 12 |
CIRCULATION gas, flowsheets of, Boehlen |
11 |
3500 |
18 |
90 11-90 15 |
COMPUTATIONS, basis of, in the monthly reports at Boehlen |
129 |
|
|
30 8-30 43 |
COSTS, construction, for alkylation and dehydrogenation plants at Boehlen |
13 |
3500 |
108 |
10 34-10 45 |
|
|
|
|
20 1-20 55 |
estimates, installation and equipment, Boehlen plant (on the basis of 1935 figures) |
11 |
3500 |
17 |
90 9-90 10 |
of construction, estimated and actual, of Lurgi high pressure gas plant in Boehlen |
12 |
3500 |
32 |
20 70-20 76 |
DATA on the Boehlen and Magdeburg works |
214 |
|
|
10 42-10 52 |
DESIGN of hydrogenation, isomerization and alkylation for Boehlen |
18 |
3042 |
16 |
16..57-16..62 |
DEVELOPMENT work in Boehlen, 1941 |
178 |
|
|
4035-4060 |
work, status of the production, in Boehlen, 1939, by Mott. |
193 |
|
|
23350-23354 |
FLOWSHEET, 1935, #99-1, Boehlen |
179 |
|
|
5096 |
GASOLINE, motor, production from tar and middle oil, Boehlen, 1938 |
11 |
3500 |
21 |
90 38-90 46 |
GAS works, Boehlen, gas stripping bridge, reported by C. A. Getz and B. V. Pfeiffer |
229 |
|
|
0 67-0 76 |
, typical operation report of the Boehlen |
192 |
|
|
22452-22601 |