T.O.M. Microfilm Reel 176
(Original designation Navy 5868-1)
Table of Contents
Note from the editors – only selected documents from this microfilm reel have been completely processed and presented below in cleaned and grouped format (Parts 1 and 5, all items, identified by HTML links below). The remainder of the reel is not related to the Fischer-Tropsch process, and therefore complete processing cannot be justified at this time.
We are, however, making the entire reel contents available in raw image format, although in a small number of relatively large files (rather than a very large number of small individual images). Anyone interested in pursuing the non-FT related material on this reel may find the document in these larger raw files.
Images 0001-0100 File size ca. 14 Mb
Images 0301-0400 File size ca. 29 Mb
Images 0401-0550 File size ca. 33 Mb
1. Extract from “Treatises on coal/carbon/ Vol. 11”, Investigations on the conversion of carbon monoxide and carbonic acid into methane with increased pressure. Hydrogenation of carbon monoxide contained in coke gas into methane. Conversion of the carbon monoxide of a mixed gas (rich in carbon monoxide) into methane. Influence of various materials on the formation of methane. 1931. Frames 0006-0009. 4 pages.
4. Report on the hydrocarbon synthesis experiments in Leuna. Marked “Incomplete” in English on the cover. February 1939. Covers laboratory work, some technical experiment, theory, proposed projects and experimental oven construction types. Frames 0051-0179. 130 pages, including some graphs, calculations and illustrations.
9. Scale drawing # 45105. Test contact oven (Rheinpreussen). November 28, 1944. Proposition I. 1 page.
10. Scale Drawing # 45099. November 10, 1944 Test contact oven Rheinpreussen. 1 page.
11. Drawing # 200/57. June 26, 1942. Contact oven installation. 1 page.
12. Scale Drawing # 45179. June 29, 1943. Arrangement of tubes in test contact oven. 2 pages.
14. Scale Drawing # M7445-2. June 29, 1940. Ammoniakwerk. Experimental installation for 750 Talo Ma458. Flow diagram. 1 page.
15. Drawing # ODS666. May 15, 1944. LURGI. Arrangement of complete cycle – Flow diagram. 2 pages.
16. Scale drawing # OFT/147. May 7, 1941. LURGI contact oven 300 mn NW. 4 pages.
18. Drawing # N2725-1. Scale drawing of a catalyst chamber. May 16, 1939. 2 pages.
19. Scale drawing # 26136. Boiler support. June 11, 1942. 2 page.
21. Drawing # 71-120 (Krupp #07z530/1c). Fuel plant changer with tubes. May 24, 1945. 2 pages.
22. Scale drawing # C670d. I. G. Farben. Pressure converter. December 28, 1943. 2 pages.
23. Scale drawing # C679. November 28, 1941. Pressure converter. I. G. Farben. Evaporator. 2 pages.
24. Scale drawing #C671. October 24, 1941. Arrangement of auxiliary rings in evaporator. I. G. Farben. 1 page.
25. Scale drawing # 684x. I. G. Farben. December 8, 1941. Experimental evaporator NW 250. Oxygen contact. 1 page.
Part 2. Frames 203-275
1. Production of acetophenone, synthetic resin AP, crotonic acid, crotonic acid butyl ester, and softening agent III, Huls Chemical works; three pages with translation, and Three drawings. 22 May, 1945.
2. Flow diagram for manufacture of acetophenone synthetic resin, Huls Chemical works, three charts, 22 April, 1945
3. Hydrogen apparatus, Huls Chemical works, products of the decomposition of raw gas” by an electric arc, 25 May, 1945.
4. Ethylene apparatus, Huls chemical works, an apparatus for producing pure ethylene from raw ethylene and hydratedethylene, 25 May, 1945.
5. Coke gas apparatus, Huls chemical works, percentage decomposition of coke gas by an electric arc method, 25 May, 1945.
6. Acetylene production, soot manufacture, and low pressure gas purification, Huls chemical works, 4 pages. 25 May, 1945.
7. Huls Chemical Works, production chart showing raw materials, intermediate products and final products (buna and by-products).
8. The production of coke-electrodes for the aluminum industry, Leuna Werke, 2 pages, 21, 12, 1943A.
9. Soot production,” Leuna Werke, 5 pages with chart, 19 May, (2 copies).
10. Cost estimate of a soot-production plant. Leuna-Werke, 1 June, 1939.
11. Over-all chart of hydrogen boxes 1-5, Huls Chemical Works, Chart # 460-4a.
12. Chart of the Huls ethylene plant, Huls Chemical Works, Chart #4b, 4 Aug. 1943.
13. Working plan of a nitrogen apparatus, I.G. Farben Industries, Chart # 73, 47.5 – 4c, Linde air fractionization.
14. Flow sheet of gas decomposition, Huls-Chemical Works, Chart, #4, 21 April, 1945.
15. Ethyl benzol production, Huls Chemical Works, tow pages with chart #12, 22 May, 1945
16. Styrpl production, Huls Chemical Works, Chart #13, 21 April, 1945.
17. Description of acetylene hydrogenation Hu 662, Huls Chemical Works, 2 pages with chart #6, 22 May, 1945.
18. Tatarinow acetylene production,” Leuna-Werke 2 pages, 15 Feb. 1944.
19. Two graphs and miscellaneous reactions dealing with acetylene production, Leuna-Werke.
Note: Frames 274 through 703 omitted from reel.
Part 3. Frames 704-814
1. Central heating and Ruhr foundry coke, Rheinisch-Westfalisches Kohlen-Syndikat, pamphlet of 48 pages.
2. The Ruhr coal in the Bakery, Rheinisch-Westfalisches Kohlen-Syndikat, pamphlet of 24 pages.
3. Ruhr coal in gas production, Rheinisch-Westfalisches Kohlen-Syndikat, pamphlet of 46 pages with charts.
Part 4. Frames 815-860
1. Entrance duct on the lower cover of a tar oven, Braunkohle-Benzin A.G., no. FA 322-2, Aug. 18, 19441. Scale drawing.
2. Regenerator, Mannesmannrohren Works, no. RW1769.1b. Nov. 23, 1935, scale drawing for Braunkohle-Benzin, A.G.
3. Tube bundle for 600 Regenerator, I.G. Farben Industries, No. N4564-2, June 7, 1937, scale drawing.
4. Gas phase converter, 1000 f 15 m. assembly” Mineralol-Baugesellschaft, No. 2338-1, Dec. 8, 1937, scale drawing.
5. Gas pre-heater Ka.5, Technisches Buro, No. 1781, Dec. 18, 1940, thermo-diagram.
6. 1000 f gas phase converter, Gaswerkschaft Mathias Stinnes, No. 2228-1, Sept, 7, 1937, scale drawing.
7. 1200 f 12 m. forging, I. G. Farben Industrie, No. N538-1, scale drawing.
8. Angle valve, Braunkohle-Benzin A. G., No. A1929-2, Feb. 24, 1944, scale drawing.
9. Lo f stem for angle valve, Braunkohle-Benzin A. G., No. FA-1547-4, Jan. 30, 1945, scale drawing.
10. Angle valve 58 f, water cooled, Braunkohle-Benzin, A. G., No. FA1522-4, Jan 24, 1945, scale drawing.
11. 10 f angle valve, water cooled, Braunkohle-Benzin A.G., No. FA 1523-4, Feb. 7, 1945, scale drawing.
12. 10 f check valve, Braunkohle-Benzin A. G., No. FA-1530-4, Jan. 24, 1945, scale drawing.
13. Complete set of drawings on H.P. valve, I.G. Farben Industries, No. NB 2827-2, Jan. 21, 11945.
14. Slime-free valve, Braunkohle-Benzin A. G., No. A1496-2, Mar. 31, 1943, scale drawing.
15. Experiment valve for H-K- slime freeness, Braunkohle-Benzin A. G., No. A1494-2, Mar. 27, 1943, scale drawing.
16. Expansion valve, Braunkohle-Benzin A. G., No. 181-2, May 7, 1935, scale drawing.
17. Diagram of the distribution of the reduction machine 500-2250, Braunkohle-Benzine A. G., No. 383-8, April 16, 1935, for Bohlen works.
18. Diagram of the reduction machine, Braunkohle-Benzin A. G., No. A343-8, Nov. 5, 1936, for Bohlen works.
19. Pressure regulator, pistons 205 f, Leunawerke, No. 953(7), Aug. 29, 1938.
20. Central reducer, tar and gasoline, for 300 atu working pressure, Braunkohle-Benzin A. G., No. IZM126-2, Sept. 26, 1940, scale drawing.
21. Gas cooler of two-chamber gas phase converter, Mineralol-Baugesellschaft, No. 2273-1, Sept. 25, 1937, scale drawing.
22. Lower thrust expander, Braunkohle-Benzin A. G., No. A822-1, Sept. 20, 1943, scale drawing.
23. Upper part hot separator, Braunkohle-Benzin, No. A832-1, Nov. 17, 1943, scale drawing.
24. Shell for 600 f regenerator, I.G. Farben Industries, No. N4022-2, Nov. 20, 1937, scale drawing.
25. Bottom closure 600 f regenerator, I. G. Farben Industries, No. N4563-2, June 22, 1937, scale drawing.
26. Grids for catalyst, Braunkohle-Benzin A. G., No. A950a-4, Nov. 16, 1944, scale drawing.
27. Slurry phase inlet, Braunkohle-Benzin A. G., No. A975-4, Dec. 13, 1940, scale drawing.
28. Lower oven cover, Braunkohle-Benzin A. G., No. A955-4, Sept. 25, 1940, scale drawing.
29. Drawing # N4265°-2 I. G. Farben. Scale drawing – Bottom head 600 f regenerator. 21 April, 1938.
30. Drawing # RW 1769.3a Braunkohle-Benzin scale drawing “upper oven cover” 14 Nov. 1938.
31. Drawing # R. W. 1769.4b Braunkohle-Benzin. Scale drawing – “lower cover” 21 Nov. 1938.
32. Drawing # 76-4 Braunkohle-Benzin. Scale drawing – 600 f funnel neck. 29 Mar. 1935.
33. Drawing # 150-2 Braunkohle-Benzin. Scale drawing lower funnel neck 600 f. 29 Mar. 1935.
34. Drawing # 206-2. Braunkohle-Benzin. Scale drawing – tube bundle 600 f.
35. Drawing # 72-4. Braunkohle-Benzin. Scale drawing lower tube sheet. 1 Mar. 1935.
36. Drawing # 75-4. Braunkohle-Benzin. Scale drawing – lower head and inlet and outlet tubes.
37. Drawing # 1138-4. Braunkohle-Benzin scale drawing tube support. July 27, 1937.
38. Drawing # A36-16. Tube for tube bundles. Braunkohle Benzin, scale drawing. 6 May, 1935.
39. Drawing # A27-1, Braunkohle-Benzin. regenerator assembly 600 f, scale drawing. 24 May, 1935.
40. Unlabeled drawing.
41. Unlabeled drawing.
42. Unlabeled drawing.
Part 5. Frames 861-1225
Notebook containing “Experience Exchange” conference reports on Fischer-Tropsch synthesis of the Ruhrchemie AK with various licensees (Rheinpreussen, Ruland, Rauxel, Krupp, Ruhrbenzin, etc.) from the file of Dr. Braune.1. Session 14. Mostly on gas purification. By Feisst. February 7/19, 1938. Frames 0863-0875. 13 pages.
2. Session 13. Activity of catalyst. By Feisst. January 7/27, 1938. Frames 0876-0889. 14 pages.
7. Session 11. Topics as in Session 12. By Feisst. November 5, 1937. Frames 0954-0971. 18 pages.
8. Session 10. Topics as above. By Feisst. October 1, 1937. Frames 0972-0981. 10 pages.
9. Session 9. Usual topics. By Feisst. August 27, 1937. Frames 0992-1000. 9 pages.
10. Session 8. Usual topics. July 30, 1937. Frames 1001-1015. 15 pages.
14. Session 4. Usual topics, includes graphs. By Feisst. March 22, 1937. Frames 1080-1094. 14 pages.
15. Session 3. Usual topics. By Alberts and Roelen. February 5, 1937. Frames 1095-1112. 16 pages.
17. Session 1. Usual topics. November 27, 1936. Frames 1144-1153. 10 pages.
18. Session 1. Alternate report. By Feisst. November 27, 1936. Frames 1154-1176. 23 pages.
19. Duplicate copy of item 18 – with some additional correspondence. Frames 1177-1201. 25 pages.
20. Duplicate copy of item 18 – missing final page. Frames 1202-1223. 22 pages.
Continued on reel 177.