T. O. M. Microfilm Reel 120
(Original Identification Reel BM-7)
Table of Contents
(Original) Remarks: This Reel is so poor that it is practically without value. It was possible to make an index but most of the items mentioned cannot be read.
Editor’s note: Items 1 and 2 are indeed extremely poor quality images, although there are sections of item 1 that are quite legible. These documents are attached below, but are of limited value. For item 1 a related, english language report (“The Wesseling Synthetic Fuels Plant – US Naval Technical Mission to Europe technical report 87-45) can be found elsewhere on the Fischer-Tropsch.org website:
1. Hydrogenation Plant Wesseling.
Description of Method 1
Description of Plant and Layout 4
Most Important Manufactures of Machines 15
Succession of Starting of Operation 22
Pintsch Hillebrand water Gas Plant 24
Light Gas Plant 30
Cracking Plant 35
Conversion 40
CO2 Purification 45
CO Purification 49
Compressors and Condensors 52
Start of Hydrogenation 54
Starting and Finished Products of Hydrogenation 58
Steels of Hydrogenation 67
High Pressure 700 AT Sump Phase 72
High Pressure 325 AT gas Phase 101
Grinding Plant 106
Centrifugal Plant 113
Low Temperature Carbonization Plant 118
A – Distillation 128
B – Distillation 132
Lye-Washery Stabilization 135
Hy-Gas Production 138
The Sulphur Question 148
Waste Water Preparation 153
The Power House 161
Electric Supply 173
Water Supply 176
Electric Consumption 180
Production 182
CIOS Target 30/5.05 - Homberg
End of reel 120.