T. O. M. Microfilm Reel 003

 

Table of Contents

 

Note from the editors – only selected documents from this microfilm reel have been completely processed and presented below in cleaned and grouped format (bag 2168 items 1 through 2b21, identified by HTML links).  The remainder of the reel is not related to the Fischer-Tropsch process, and therefore complete processing cannot be justified at this time.

 

We are, however, making the entire reel contents available in raw image format, although in a small number of relatively large files (rather than a very large number of small individual images).  Anyone interested in pursuing the non-FT related material on this reel may find the document in these larger raw files.

 

                                                Images 0001-0200                   File size ca. 20 Mb

                                                Images 0201-0400                   File size ca. 15 Mb

                                                Images 0401-0600                   File size ca. 29 Mb

                                                Images 0601-0746                   File size ca. 17 Mb

 

 

Bag 2168(4.03) – I.G. Ludwigshafen – Oppau

 

Item

 

1.             Continuation of Section 13, from T.O.M. Reel 2, Synthesis Gas Production.  2 pages.

 

2.             Monthly reports on Fischer synthesis Plant at Wintershall A. G. Lutzkendorf consists of summary sheet under the following headings:  1, coal used; 2. heating gas;  3, synthesis gas; 4, gas purification;  5, Fischer synthesis and 6, oxygen and nitrogen.  The “Summary Sheet” is followed by “Detail” sheets of  explanatory notes.

                The following individual items obtain:-:-

 

2b.           (1)  Monthly report Group A, August, 1943, Summary Sheet, 1 page. Detail Sheet, 1 page.

 

(2)  Report of June, 1943.  Summary Sheet, 3 pages.  Group C  Detail Sheet, 1 page.  Group B  Detail Sheet,  2  pages

 

(3)  Monthly Report  Group A, June, 1943. Summary Sheet, 1 page.  Detail Sheet, 1 page.

 

(4)  Monthly Report - “D” - June, 1943.  Utilized Requirements Summary Sheet, 2 pages.  Detail Sheet, 2 pages

 

(5)  Monthly Report Group A, September, 1943.  Summary Sheet, 1 page.

 

(6)  Monthly Report “D”, May, 1944.  Utilities Requirements Summary Sheet, 2 pages.

 

(7)  List of Personnel – Chemists and Engineers, gives vital statistics.  Some pages illegible.  46 pages.

 

(8)  List of personnel at Oberrheim.  56 pages.  Variable quality.  Some excellent, some illegible.

 

(9)  A letter (Marked Secret) mentioning a report on a convention on “Analytic and Experimental Micro-Separation  Technic on Hydrocarbon mixtures”.  April 5, 1940, 1 page.

 

(10)  A letter on time needed to give a lecture on the item in #9.  1 page.

 

(11)  A report on the convention in item #9.  “Analytic & Micro-Separation of Hydrocarbon Oils from Methanol  Synthesis under various conditions.  9 pages.  Item #11 – Translation Suggested.

 

(12)  A report “Addition to Report on the Isolation and Identification of Hydrocarbons according to New Methods” an  outline of the report:  1.  Micro-Technic;  2.  Determination of Olefines;  3.  Determination of Dienes;  4. Determination of Paraffins and 5.  Separation of Artificial Mixtures.  The report contains tables and diagrams of        apparatus.  51 pages. Item #12 – Translation Suggested. 

(13)  Paper by K.B. Metzger – March, 1940.  Concerning the shifting of explosive limit of mixtures of ethylene and  ethylene oxide;  ethylene oxide and oxygen mixtures by addition of nitrogen and CO2 respectively.  Literature  reference and tables given.  17 pages.

 

(14)  Paper by Dr. Jannack – given before the cooperative society of “the chemistry of aliphatic and cyclo-aliphatic hydrocarbons” on “The Synthesis and Conversion of Simple Hydrocarbons.  May 24, 1940.  15 pages.

 

(15)  Monthly Report  Group A.  Summary Sheet on Fischer Synthesis.  4 pages

 

(16)  Monthly Report  Group B. February, 1944.  Summary and Detail Sheets.  2 Pages.

 

(17)  Monthly Report  Group C.  February, 1944.  Summary and Detail Sheets.  2 pages.

 

(18)  Monthly Report  Group D.  October, 1943.  Utilities Requirements.  2 pages

 

(19)  Monthly Report.  September, 1943.  Utilities Requirements.  2 pages.  Summary Sheet on Progress.  4 pages

 

(20)  Monthly Report  Group C.  September, 1943.  4 pages.

 

(21)  Monthly Report  Group B.  August, 1943.  2 pages.

 

(22)   An Experiment by F. Winkler, dated July 26, 1939.  Ethylene (from the hydrogenation in the electric arc)  enriched by copper wash.  5 pages.

 

(23)  Paper on “The Continous Production of Succinic Acid from Tetra-hydro-furane and  nitric acid.  October 6, 1942.

                        19 pages

 

(24)  Procedure for the production of n and I butyraldehyde or the corresponding alcohols – A write-up for a patent.

        March 19, 1943.  4 pages.

 

(25)  Procedure for the production of Poly-hydric alcohols.  A patent application (copy).  March 6, 1943.  1 page.

 

(26)  Procedure for the production of dichlorethane.  A patent application November 23, 1943.  2 pages.

 

(27)  Procedure for the production of ethylene glycol.  Patent application July 9, 1942.  7 pages

 

(28)  Procedure for the production of Halogin Acid Solutions.  Addition to Patent Application #1.71 303 IV b 12i.

                         March 26, 1942.  4 pages.

 

(29)   Steam and Electricity (Economy of) Requirements at Lutzendorf.  14 pages.

 

                (30)  Letter Dated November 25, 1940 to the Ministry of Economics Division of Power on Power requirements.  2

                            pages.

 

(31)  Report on Power Production and Operation Safety.  2 pages

 

(32)  Directive on Work Schedule.  1 page.

 

End of Bag #2168  Target No.  30/4.03

 

1.             Bag #2745  Target 30/4.08  Gelsenberg

(Noto – This new target number continues on the same roll)

 

2.             (1)           Summary Sheet of Bag 2745 Target 30/4.08 lists 20 items (18 of which are on this roll which is identified as

                Roll 3).  The Summary sheet is in English.

(2)           Title page in English – Coal Hydrogenation.  1 page.

(3)           Item #1 – Monthly Report

(1)     Operating Data on Hydrogenation works at Nordstern.  2 pages.

(2)   Monthly Report March 1944.  2 pages.

(3)   Monthly Report February 1944.  2 pages.

(4)   Monthly Report Januray 1944.  2 pages

(5)   Monthly Report December 1943.  2 pages

(6)   Monthly Report October 1943.  2 pages

(7)   Monthly Report September 1943.  3 pages

(8)   Monthly Report August 1943.  3 pages

(9)   Monthly Report July 1943.  2 pages

(10) Monthly Report June 1943.  2 pages

(11)  Monthly Report May 1943.  2 pages

(12) Monthly Report March 1943.  2 pages

(4)           Item #2 – Monthly Total Balance – Coal, Catakysts, Oil.  In Engish.  1 page

(1)     Total Balance Sheets October 1941 – Januray 1940.  10 pages

(5)           Item #3 – Monthly Total Gas Balance December 1940 – January 1940. 12 pages

(6)           Item #4 – Monthly Gas Summaries September 1941-January 1940.  16 pages

(7)           Item #5 – Monthly Total Shipments October 1941 – January 1941.  10 pages

                (8)           Item #6 – Monthly Barge Shipments.  8 pages

(9)           Item #7 – Monthly Summaries – Shipping and Isobutane Plant – September 1941 – September 1940.  8 pages

(10)         Item #8 – Monthly Summaries A – Middle Oil Distallation July 1941 – December 1940.  14 pages

(11)         Item #9 – Monthly Summaries – Distillation and Stabilizing, October 1941 – January 1941.  11 pages

(12)         Item #10 – Monthly Summaries – Centrifuge Plant October 1941 – January 1940.  24 pages

(13)         Item #11 – Monthly Summaries – Carbonization Plant, October 1941 – January 1940.  24 pages

(14)         Item #12 – Monthly Summaries – Coal Grinding, October 1941 – January 1941 .  10 pages

(15)         Item #13 – Monthly Summaries – Light Ends Recovery, July 1941.  23 pages

(16)         Item #14 – Monthly Summary Coal Stalls December 1940 – December 1941.  22 pages

                (17)         Item #15 – Monthly Summaries.  Saturation and Splitting.  October 1941 – December 1940. 22 pages

(18)         Item #16  Yearly Stall – Operations Curves

1942 – 1943  (1)  Monthly usage of stalls (chambers)

1942 – 1943  (2) Charges and yields

1942 – 1943  (3) Chemical operation data on coal phase-yields of different fraction.

                                                Curves are ploteed with time as abscissa and % yields as ordinate.

(19)         Item #17  Coal Stalls – Effect of ash – hydrogen loss-light hydrocarbons.

(1)           Influences of ash content on coal phase hydrogen.  1 page

(2)           Hydrogen losses and gaseous hydrocarbons in coal phase.  4 pages

(3)             A short visit to Scholven – Discussion – the charging capicity of ovens with coal paste.                    2 pages.

                (20)         Item # 18  Operation Reports – Saturation and Splitting stalls

                                    (1)           June 1944 – February 1944 plus general report.  8 pages

(2)           Discontinuation and enlargement of operating stall –operational period December 1940 – March 1940 - gives reasons for discontinuation.  4 pages

                                                (3)           Pressure Drop Data through Equipment.  1 page.

(4)           Machine Shop Forms.  3 pages

(5)           Equipment List (use not stated).  1 page

                                                (6)           Discontinuation of Benzine Stall 305 (due to air raid) October 15, 1940.  Rebuilt  according to stall     301.  1 page

(7)           Operation Report Benzine Stall 301.  July 1944. 9 pages

(8)           Report on remodeling of experimental stall 302 after 9th oeriod of operation.  February 1943.  1 page

(9)           Machine Shop Forms.  5 pages

                                               (10)          Equipment for experimental hydrogenation stall 302 – 3 compartments in chamber

February 20, 1943.  1 page

(11)          Preliminary report on experimental stall 302.  February 1943.  2 pages

(12)          Discontinuation of Stall 302.  April 21, 1941.  2 pages

(13)          Report on operation of stall 302 covering different periods (6 in all).  27 pages

(14)         Discontinuation of chamber 303.  March 30, 1940.  4 pages

(15)         Repair of chamber 303.  1 page

(16)         memorandum – air raid – chamber 303.  August 12, 1943.  1 page

(17)         Flow sheet (gas-phase)  Chamber 303.  1 page

(18)         Memorandum – foundation to Benzine chamber 303.  August 1942.  1 page

(19)         Production results with new hydrogenation catalyst at Politz.  1 page

                (20)         Experiences with catalyst 7846 W. 250                 (composition not stated).  4 pages

                (21)         Installation of chamber 303 with catalyst 7846 W. 250.  October 26, 1942.  3 pages

(22)              Experiences with catalyst 7846 W. 250 with large scale operation 3 pages

(23)              Preliminary Hydrogenation experiment with Catalyst 7846 W. 250  May 1942.  2 pages

(24)              Visit of Dr. Schick from Leuna – concerning injection of cold coal paste  March 1942.  1 page.

(25)              Operation report experimental chamber 303.  August 1944.  7 pages

(26)              Short report on last operational period – experimental chamber 304  August 1944.  2 pages

(27)              Preliminary testing of experimental chamber 304 building #22  December 1943.  3 pages

                                                (28)         Experimental chamber 304 – April 1942.  6 pages

(28)              Repair work and remodeling of chamber 304.  March 1942.  1 page

(29)              Repair work and remodeling of chamber 304.  March 1942.  1 page

(30)              Discontinuation of experimental chamber 304.  June 1941.  1 page

                                                (31)         Operation report chamber 304.  February 1943.  3 pages

                                                (32)         Operation report chamber 304.  1943.  4 pages

                                                (33)         Operational report chamber 304.  5 pages

(34)              Method of measurement (preliminary testing) of chamber 304.  2 pages

(35)              Repair work on chamber 305 – after resumption of work in gas phase October 1942.  2 pages

(36)              Construction of Oven 6434 of chamber 305.  December 1941.  3 pages

(37)              Discontinuation of Benzine chamber 305.  October 7, 1941.  2 pages

(38)              Discontinuation of Benzine chamber 304.  October 15, 1940.  1 page

                                                (39)         Operation report – chamber 305.  July 20, 1940.  4 pages

                                                (40)         Operation report – chamber 305.  July 24, 1944.  4 pages

                                                (41)         Operation report – chamber 305.  July 24, 1944.  4 pages

                                                (42)         Operation report – chamber 305.  July 17, 1944.  3 pages

                                                (43)         Operation report – chamber 305.  July 26, 1944.  2 pages

                                                (44)         Operation report – chamber 305.  July 29, 1944.  4 pages

                                                (45)         Operation report – chamber 305.  August 23, 1944.  4 pages

(46)              Reconstruction report of experimental chamber 306.  September 2, 1943.  2 pages

(47)              File notice #6641 on Benzine chamber 306.  Sketch of chamber given.  4 pages

(48)              Discontinuation of chamber 306 and enlargement to 3 compartments December 10, 1942

Sketch of chamber 306.  3 pages

                                                (49)         File notice  February 17, 1942 – on operation data.  1 page

                                                (50)         Removal of experimental chamber 306.  February 1942.  5 pages

(51)              Discontinuation of experimental chamber 306.  January 10, 1942.  3 pages

                                                (52)         File notice – operation on 306.  1 page

                                                (53)         Operation data on 306 covering different periods.  17 pages

                                                (54)         Preliminary testing of chamber 307.  May 1944.  1 page

                                                (55)         Resumption of work on chamber 307.  November 1943.  2 pages

                                                (56)         Repair of Raffinate oven in chamber 307.  December 1942.  2 pages

(57)              The Raffination of coal benzine.  Curve of production % vs. month.  Flow diagram of chamber 307.  5 pages

                                                (58)         File notice.  February 1942  Operation Data.  1 page

(59)          Operation report – chamber 307 – covering various periods.                  10 pages

                                                (60)         List of charges in various chambers.  1 page.

                                                (61)         Discontinuation of gas phase – August 1942.  5 pages

(62)              Pressure release and washing of gas container.  October 1942.  1 page

(63)              Scheme for releasing the pressure in gas phase.  October 1942.  2 pages

                                                (64)         Discontinuation of Gas Phase.  October 1942.  3 pages

(65)         Repairs on Gas Phase Equipment during Plant Discontinuation  September 1942.  2 pages

 

End of Roll #3.

                                               

                                                July 9, 1945