Back to Technical Oil Missions

Back to TOM Reel Indexes

Purchase TOM Reels

 

T. O. M. Reel 136

(originally designation US Navy reel 5814-1)

 

Drawings of the Winkler gas producer at Werk Bohlen of Braun-Kohle Benzin.

 

(note – all drawings identified as “poor quality” on microfilm, but most scanned well.  Those still with legibility problems are identified as such below)

 

Item

 

1.         Drawing 54-1.  Winkler generator installation at Zeitz.  Plant of the generator preheater.

2.         Drawing 90-1.  Adjustable winch.

3.         Drawing 91-1. 

4.         Drawing 96-1.  Stirring arm for the generator.

5.         Drawing 98-1.  Conical ring of the generator.

6.         Drawing 115-1.  Supporting ring, spherical zone and support of “grudebunker”.

7.         Drawing 116-1.  Shell of “grudebunker”.

8.         Drawing 125-1.  Two generator shells and supports.

9.         Drawing 137a-1.  Shell of Winkler generator No. 1, Zeitz fuel plant.

10.       Drawing 192-1.  Platform and ladder for Winkler generator preheater.

11.       Drawing 193-1.  Sheet metal shell of generator preheater, 2.2 meters ID (Brabag).

12.       Drawing 194-1.  Two brackets for 15 tons, one bracket for 5 tons, for generator.

13.       Drawing 321-2.  Four 40 cubic meter coal dust bunkers.

14.       Drawing 349-2.  “Grudebunker” for the Boehlen generator installation.

15.       Drawing 354-2.  Chimnet for the generator preheater.

16.       Drawing 355-2.  Water gas line, 2000 mm, sheet 1.

17.       Drawing 356-2.  Water gas line, 2000 mm, sheet 2.

18.       Drawing 357-2.  Water gas lines, 100 and 1200 mm.

19.       Drawing 398-2.  Housing for bottom support of the hollow shaft, and intermediate housing.

20.       Drawing 399-2.  Part of stuffing box – release.

21.       Drawing 441-2.  Firing building: construction drawings for bricking the inlet and outlet lines of the generator preheater.

22.       Drawing 447-2.  Drive of the discharge from the multiclones to the Winkler installation.

23.       Drawing 548-2.  Drive of the stirrer of the Winkler generator.

24.       Drawing 690-1.  Stirrer holder.

25.       Drawing 691-1.  Intermediate section of “Grudebunker” from 5320 to 2660 mm.

26.       Drawing 692a-1.  Water gas line, 2000 mm.

27        Drawing 693-1.  Supporting ring and spherical section of the “Grudebunker”.

28.       Drawing 694-1.  Shell of “Grudebunker”.

29.       Drawing 695-1.  Discharge of “Grudebunker”.

30.       Drawing 696-1.  Conical section of generator III.

31.       Drawing 691-1.  Generator shell III, 5.5 meters diameter, for Boehlen expansion.

32.       Drawing 701a-1.  Shell of generator preheater II of 2.2 meters ID.

33.       Drawing 702-1.  Waste heat boiler.

34.       Drawing 704-1.  Platform for Winkler generator III.

35.       Drawing 705-1.  Platform for Winkler generator III.

36.       Drawing 710-1.  Steel construction of generator II, bottom part.

37.       Drawing 711-1.  Platform and ladders on generator III.

38.       Drawing 715-1.  Heating coils, etc.

39.       Drawing 716-1.  Steel construction of upper part of generator preheater II.

40.       Drawing 717-1.  Arrangement of platforms for waste heat boiler.

41.       Drawing 718-1.  Grating support for the flue construction over generator preheater II.

42.       Drawing 719-1.  Refractory construction.

43.       Drawing 720-1.  Refractory construction.

44.       Drawing 722-1.  Runway between generators II and III.

45.       Drawing 723-1.  Roller support.

46.       Drawing 724-1.  Ash removal screw assembly.

47.       Drawing 725-1.  Gas line.

48.       Drawing 726-1.  Stirring mechanism.

49.       Drawing 727b-1.  Boehlen fuel plant expansion.

50.       Drawing 729-1.  Adjustable winch.

51.       Drawing 730-1.  Switch lever to drive ash screw.

52.       Drawing 731-1.  Housing for ash screw.  Very poor quality.

53.       Drawing 735-1.  Bracket for generator preheater II.

54.       Drawing Illegible.  Very poor quality.  Possibly 747-1 ?

55.       Drawing 736-1.  Operating platform and ladders for generator preheater. 

            Drawing 747-1.  Missing, but included in original index.

56.       Drawing 748-1.  Refractory construction.  Very light.

57.       Drawing 817-2.  Cover for “Grudebunker”.

58.       Drawing 819-2.  Flue over Winkler generator III.

59.       Drawing 820-2.  Winkler generator III, refractory dimensions.

60.       Drawing 821a-2.  Flue over generator preheater II.

61.       Drawing 822-2.  Borings in the supporting rings of the Winkler generator, the “Grudebunker” and the preheater.

62.       Drawing 824-2.  Supporting ring with platform supports at the 8.948 meter level of Winkler generator III.

63.       Drawing 825-2.  Spherical top of Winkler generator III.

64.       Drawing 826-2.  Braces for the water gas line of Winkler generator III.

65.       Drawing 828-2.  Storage vessel.

66.       Drawing 830-2.  Supports for the platform of the condensate vessel of Winkler generators II and III.

67.       Drawing 831-2.  Supplementary sheet for the platform at 23.9 meters on Winkler generator III.

68.       Drawing 832-2.  Covering between the top and the platform of Winkler generator III at level 23.9 meters.

69.       Drawing 833-2.  Elevation of Winkler generator preheater and “Grudebunker”.

70.       Drawing 834-2.  Refractory linings.

71.       Drawing 835-2.  Refractory linings (?).  Very poor quality.

72.       Drawing 835-2.  Refractory linings (?).  Somewhat better.

73.       Drawing 836-2.  Base plate of switches and motors for ash discharge screw.

74.       Drawing 838-2.  Control panel for Winkler generator.  Pretty light – hard to read.

75.       Drawing 839a-2.  Connecting lines between “Grudebunker”, preheater, and generator III.

76.       Drawing 840-2.  Foundation for ash discharge drive.

77.       Drawing 842-2.  Ladder for generator III.

78.       Drawing 843-2.  Liquid fuel plant, Boehlen.

79.       Drawing 844-2.  Cogwheel of stirring arm drive.

80.       Drawing 845-2.  400 mm fuel supply with spindle activation.

81.       Drawing 846-2.  40 mm peep hole for Winkler generator.

82.       Drawing 847-2.  Peep hole closure.

83.       Drawing 848-2.  Casting for water inlet and outlet lines for stirring device.

84.       Drawing 849-2.  Grade bars and attachments for Winkler generator.

85.       Drawing 850-2.  Winkler generator grates.

86.       Drawing 1007-2.  Winkler generator expansion, plant and elevation.

87.       Drawing 1404-2.  Cleaning tower installation, details of lines.

88.       Drawing 1405-2.  Cleaning tower installation, details of lines.

89.       Drawing 1406-2.  Cover support of purification tower 6800.

90.       Drawing 1408-2.  200 mm air valve for top of purification tower.

91.       Drawing 1409-2.  Bearing.

92.       Drawing 1461-1.  2000 mm water gas line.  Changes to Winkler generator.

93.       Drawing 1667-2.  Main ventilator.

94.       Drawing 2113-2.  JZM 1767-2. Building 411/405.

95.       Drawing 2114-2.  JZM 1766-2. 

96.       Drawing 2133-1.  JZM 1747-1.

97.       Drawing 2187-1.  Winkler generator explansion Boehlen A3.  Fairly light.

98.       Drawing 2197-1.  Nozzle ring pipe A3 liquid fuel plant.  Poor quality.

99.       Drawing 2396-1.  JZM 1764-1.

100.     Drawing A181-1.  Braunkohle-Benzin A.G. 92-1.  Very poor quality.

101.     Drawing A203-1.  Braunkohle-Benzin A. G. 363-1.  Relatively poor quality.

102.     Drawing A249-1.  Braunkohle-Benzin A. G. 444-1. 

103.     Drawing A345-2.  Braunkohle-Benzin A. G. 268-2.  Pretty bad.

104.     Drawing A346-2.  Braunkohle-Benzin A. G. 288-2. 

105.     Drawing A430-2.  Braunkohle-Benzin A. G. 295-2.

106.     Drawing A490-1.  Braunkohle-Benzin A. G. 

107.     Drawing A529-1.  Braunkohle-Benzin A. G. 5027-1.  Fairly awful.

108.     Drawing A539-1.  Braunkohle-Benzin A. G. 5027-1.  Ditto.

109.     Drawing A553-1.  Braunkohle-Benzin A. G. TZ1-1.  Decent.

110.     Drawing A791-2.  Braunkohle-Benzin A. G. 1718-2.

111.     Drawing A881-2.  Braunkohle-Benzin A. G. 1792-2.

112.     Drawing A929-2.  Braunkohle-Benzin A. G. 5028-2.  Fairly poor.

113.     Drawing A935-2.  Braunkohle-Benzin A. G. 5044-2.

114.     Drawing A936-2.  Mineralol Baugesellschaft m.b.H. 3242-2.  Marginal.

115.     Drawing A950-2.  Mineralol Baugesellschaft m.b.H. 3291-2.  Marginal.

116.     Drawing A955-16.  Waste heat boiler III, Brabag.

117.     Drawing A1035-2.  Braunkohle-Benzin A. G. 5137-2.  Marginal.

118.     Drawing A1075-2.  Braunkohle-Benzin A. G. 5175-2.  Marginal.

119.     Drawing A1622-2.  Multiclone with 12 150 mm tubes of Beth filter.

120.     Drawing Ze568-2.  Mineralol Baugesellschaft m.b.H. 2825-2.

121.     Drawing Ze550-2.  Mineralol Baugesellschaft m.b.H. 3521-2.

122.     Drawing JZM232m-1.  Photostat of layout of Boehlen Werk of Braunkohle-Benzin A. G. dated July 9, 1943.

123.     Drawing 4E25839.  Winkler generator with 4900 mm shaft, grateless model, proposal II.

124.     Drawing A449-1.  Boehlen plot plan, scale 1-1000.