Back to Technical Oil Missions

Back to TOM Reel Indexes

Purchase TOM Reels

T. O. M. Reel 090

(Originally reel 3M and/or 3F)

 

Bag 3448

Target 30/11.10

Gute-Hoffnungs-Hutte

 

Drawings of 1 and 10 atmosphere Fischer-Tropsch ovens (reactors)

 

1.         Drawing O Jz 530/1.  Rohrbundel – Drucksyntheseofen 2750.   Fried. Krupp A. G. Essen.  5 pages.

2.         Drawing KS 3675.  Kontaktofen.  January 18, 1936.  5 pages.

3.         Drawing KS 3533.  Kontaktofen - Seitenwande.  November 9, 1935.  4 pages.

4.         Drawing KS 3548 (3543 ?).  Kontaktofen - Siederohranschlusse.  1935.  4 pages.

5.         Drawing KS 3531.  Kontaktofen - Deckel.  December 16, 1935.  4 pages.

6.         Drawing KS 3609.  Kontaktofen - Rohrleitungen um den Kontaktofen.  December 29, 1935.  3 pages.

7.         Drawing KS 3537.  Kontaktofen – Rechte Gaskammer.  November 19, 1935.  5 pages.

8.         Drawing KS 3530.  Kontaktofen – Unterteil.  October 29, 1935.  5 pages.

9.         Drawing KS 3542.  Kontaktofen – Eintritt Semmelrohre.  December 27, 1935.  5 pages.

10.       Drawing KS 3543.  Kontaktofen – Verteilungerohre.  December 27, 1935.  5 pages.

11.       Drawing KS 3655.  Kontaktofen - ?.  February 24, 1936.  4 pages.

12.       Drawing KS 3633.  Kontaktofen – Rohraufhangung.  March 4, 1936.  4 pages.

13.       Drawing KS 3596(?).  Kontaktofen – Linke Gaskammer mit dazugehorigem Deckel.  December 17, 1935. 

14.       Drawing KS 3635.  Kontaktofen - ?.  November 16, 1935.  1 page.

15.       Drawing KS 35??.  Kontaktofen – Deckel-Stutzen.  November 2, 1935.  1 page.

16.       Drawing KS 3623.  Kontaktofen - ?.  January 29, 1936.  1 page.

17.       Drawing KS 3657.  Kontaktofen – Laschen zum Heben des Ofens.  February 26, 1936.  1 page.

18.       Drawing KS 3529.  Kontaktofen – Rohrbleche z. Rohrsystem.  October 28, 1935.  1 page.

19.       Drawing KS 3678.  Kontaktofen – Rohrverstarkung.  March 13, 1936.  1 page.

20.       Drawing KS ????.  Kontaktofen – Versuchvorrichtung.  February 26, 1936.  6 pages.

21.       Drawing KS 3639.  Kontaktofen.  February 13, 1936.  4 pages.

22.       Drawing KS 3612.  Kontaktofen – Zusammenstellung.  January 15, 1936.  4 pages.

 

Bag 3448

CIOS Target 30/5.01

Ruhrchemie A. G. – Sterkrade-Holten

Part II

 

103A.  Drawing ZM 106/1.  Ubersicht.  Undated.  4 pages.

103B.   Drawing ZM 106/3.  Reinigerturm.  October 14, 1938.  4 pages.

103C.  Drawing ZM 106/2.  Reinigerturm.  October 17, 1938.  3 pages.

103D.  Drawing ZM 106/5.  Gaserhitzer.  October 18, 1938.  4 pages.

103E.   Drawing ZM 106/4.  Warmeaustauscher.  October 16, 1938.  4 pages.

103F.   Drawing ZM 106/13.  Gehause (Seitenwand) zum Kontaktofen (Kammerofen).  October 19, 1938.  4 pages.

103G.  Drawing ZM 106/8.  Gehause (Seitenwand) Ankenvand u. Verankerung (?) d. Seiten z. Kontaktofen.  October 15, 1938.  4 pages.

103H.  Drawing ZM 106/7.  Illegible.  October, 1938.  3 pages.

103I.    Drawing ZM 106/1?.  Illegible.  Undated (probably October, 1938).  4 pages.

103J.    Drawing ZM 106/14.  Kontaktofen Aufstellungsplan Anordnung der Stutzen.  October 19, 1938.  1 page.

103K.  Drawing ZM 106/11.  Ubersicht.  August 6, 1936.  4 pages.

103L.   Drawing ZM 106/6.  Gaskuhler.  October 18, 1938.  4 pages.

 

104.     Projekt einer Katalysator-Fabrik fur die Benzinsynthese Amerika (Project of a catalyst factory for the benzine synthesis USA).   3 pages.

 

A.           Drawing 10 Am Ka 0.109. Anordnung einer Katalysatorfabrik fur Frischherstellung u. Regenerierung (Lageplan der Katalysator-Fabrik Anlage fur Amerika).  October 8, 1938.  2 pages.

B.         Drawing 10 Am Ka 0-115.  Schema einer kleiner Katalysator-Fabrik.  October 21, 1938.  4 pages.

C.        Drawing 10 Am 0.106.  Apparat Schema fur eine Gross-Anlage zur Regenerierung und Frisch-Herstellung von Kontaktmasse.  August 9, 1938.  6 pages.

D.        Drawing 10 Am Ka 0.110.  Schema showing the chemical reaction on solution precipitation and recovery of thorium.  October 21, 1938.  4 pages.

E.         Drawing 10 Am Ka 0.116.  Megenfluss - Schema fur Wasse, Wasser u. Dampf.  October 21, 1938.  4 pages.

F.         Drawing 10 Am Ka 2.101.  Losung und Fallungs Anlage (Solution and Precipitation).  October 11, 1938.  4 pages.

            G.        Drawing 10 Am Ka 7.10?.  Reduktion.  October 11, 1938.  4 pages.

H.        Drawing 10 Am Ka 7.103.  Rohrteitungen zwischen Gaserhitzen Ventilator Exhauster Bau 407 (“Rekuperator”).  October 25, 1938.  1 page.

I.          Drawing 10 Am 15-101.  Feinreiniger – Masse – Werkstaff.  October 21, 1938.  5 pages.

J.          Drawing 10 Am Ka 2.103.  Rohrschlangen fur Losebehalter.  July 9, 1938.  3 pages.

K.        Drawing 10 Am Ka 3.101.  Eisenkonstruktion d Presse Buhne Reinigungsfallung (Pressenbuhne).  June 12, 1937.  4 pages.

            L.         Drawing 10 Am Ka 4.1??.  Einstellbehalter.  September 2, 1937.  5 pages.

            M.        Drawing 10 Am Ka 4.103.  Fallbehalter.  November 15, 1937.  1 page.

            N.        Drawing 10 Am Ka 7.30?.  Reduktionstrag.  Illegible date.  4 pages.

            O.        Drawing 10 Am Ka 15.104.  Passiersieb.  November 21, 1938.  4 pages.

P.                  Drawing 10 Am Ka 15.103.  Raumerstern u. Lagerbock.  August 9, 1933. 

4 pages.

Q.        Drawing 10 Am Ka 15.102.  Feinreiniger Werkstaff – Schneckenrad Antrieb zum Passiersieb.  May 25, 1937.  4 pages.