Back to Technical Oil Missions
T. O. M. Reel 066
Index of Documents
Bag No. 3445
C.I.O.S. Target No. 30/5.01
Ruhrchemie A.G.
Sterkrade – Holton
3445 – 30/5.01 –
9. Oven 10. Filling 13. Complete records. 1943. Frames 0001-0429. 429 pages.
10. Graphical records - refining. January-August 1944. Frames 0430-0439. 46 pages.
11. Official test of iron catalysts. 1944 – some data sheets. Frames 0440-0444. 5 pages.
12. Ovens 33 & 34 – conditions and yields. Frames 0445. 1 page.
13. Sulphur in gas by various methods – data. 1940-1942. Frame 0447. 1 page.
14. Instructions for a general works lab. Control test. May 15, 1944 and December 15, 1943. Frames 0448-0454. 7 pages.
15. Fine purification (“Feinreinigung”) – a brief minute. July 9, 1940. Frames 0455-0456. 2 pages.
16. General synthesis operation. (Two minutes). April 27 and November 18, 1940. Frames 0457-0469. 13 pages.
17. Comparison of operation methods at Rheinpreussen, Essener-Steinkohle and Ruhrbenzin. Undated. Frames 0470-0481. 12 pages.
18. Operation methods at Essener-Steinkohle in November 1940. December 18, 1940. Frames 0482-0493. 12 pages.
19. Determination of branched chains in mixtures of paraffins. November 11, 1944. Frames 0494-0500. 7 pages.
20. Standardization of lubricating oil specifications. Three reports dated December, 1944, undated, and May, 1942. Frames 0501-0543. 52 pages.
21. Brief description of Oxo-process. Undated. Frames 0544-0545. 2 pages.
22. Cobalt and Thorium recovery. 1939-1944. Frames 0546-0581. Several pages illegible. 36 pages.
23. Joint investigation of Abreiss (“tear off”) temperature of synthetic spirits. May 1, 1942. Frames 0582-0600. 19 pages.
24. Synthetic fuels octane number and peroxide formation – joint reports. September 7, 1944 and October 4, 1943. Frames 0601-0701. 101 pages.
25. Monthly reports of medium pressure experimental Fischer-Tropsch synthesis plant. September 1938-April 1944. Frames 0702-0886. 185 pages.
26. Weekly and fortnightly reports from the medium pressure experimental Fischer-Tropsch synthesis plant. May 13, 1938 to March 30, 1939. Frames 0887-0960. 74 pages.
27. Weekly and fortnightly reports from the medium pressure experimental Fischer-Tropsch synthesis plant. August, 21, 1942 to August 26, 1943. Frames 0961-1007. 48 pages.
28. S.I.C.S. (“Arezzo”) plant – wax production and recovery. February 4, 1943 and November 1942. Frames 1008-1018. 14 pages
29. Details of experimental medium pressure Fischer-Tropsch synthesis ovens. June 8, 1940. and December 17, 1938. Frames 1019-1034. 16 pages.
30. Conversion and synthesis (views on theoretical aspects of Fischer-Tropsch synthesis). March, 1941. Frames 1035-1066. 32 pages.
31. Papers relating to erection of medium and high pressure experimental plants (by Lurgi). November, 1938 to November, 1939. Frames 1067-1099. 34 pages.
Bag 3445 Continued on Reel 067.
Supplementary Material
Bag 2288
CIOS Target 30/5.01
1. Plan of works. Frames 1100-1102. 5 pages.
2. Apparate-Schema – Oxo Anlage. Frames 1103-1104. 2 pages.
3. M. D. Benzinsynthese Project 22. Frames 1105-1107. 2 pages.
CIOS Target 30/5.04
1. Hoesch-Benzin G.m.b.H. map of plant. Frames 1107-1109. 3 pages.