Section 1
974kb |
1 |
Introduction and Summary |
1-1 |
|
1.1 |
Introduction |
1-1 |
|
1.1.1 |
Phase I - Concept Definition and RD&T Planning |
1-1 |
1.1.2 |
Phase II - R&D and Testing |
1-1 |
1.1.3 |
Phase III - Preliminary Engineering Design |
1-2 |
1.2 |
Summary |
1-2 |
2 |
Phase I Task 3 - System Technical Assessment |
2-1 |
|
2.1 |
Ash Fusion Temperature Prediction for EECP Coal Feeds |
2-1 |
|
2.1.1 |
Summary of Results and Applications |
2-1 |
2.1.2 |
Methodology Review and Ash Fusion Temperature Correlations |
2-4 |
Section 2
131kb |
|
2.1.2.1 |
Coal Ash Fusion Data |
2-5 |
Section 3
528kb |
2.1.2.2 |
Correlation Assessment and Accuracy |
2-9 |
|
Pennsylvania Coal |
2-10 |
Section 4
677kb |
Other Coal Samples |
2-12 |
Section 5
1008kb |
EECP Coal Feeds |
2-14 |
EECP Blended Feeds |
2-16 |
Section 6
123kb |
2.1.3 |
Conclusion |
2-17 |
2.2 |
Preliminary EECP Plant Balances |
2-19 |
|
2.2.1 |
EECP Configuration |
2-19 |
Section 7
440kb |
2.2.2 |
Preliminary EECP Plant Balance Summary |
2-21 |
3 |
Phase I Task 4 - Feasibility Design Package Development |
3-1 |
4 |
Phase I Task 5 - Market Analysis |
4-1 |
5 |
Phase I Task 6 - Preliminary Site Analysis |
5-1 |
|
5.1 |
EECP Large Vessel Transportation Assessment |
5-1 |
|
5.1.1 |
Proposed EECP Site Location and Conditions |
5-1 |
Section 8
221kb |
5.1.2 |
Summary Results |
5-4 |
5.2 |
Transportation |
5-4 |
|
5.2.1 |
Site Access by Truck |
5-4 |
5.2.2 |
Site Access by Rail |
5-5 |
5.2.3 |
Site Access by Barge |
5-5 |
5.2.4 |
Ports of Import |
5-6 |
5.3 |
Reactor and Transportation Cost Estimates |
5-6 |
6 |
Project Management |
6-1 |
|
6.1 |
Biweekly Project Status Report |
6-1 |
6.2 |
Project Milestones Plan and Log |
6-1 |
7 |
Experimental |
7-1 |
|
7.1 |
Executive Summary |
7-1 |
7.2 |
Experimental |
7-1 |
7.3 |
Results and Discussion |
7-1 |
7.4 |
Conclusion |
7-1 |
7.5 |
References |
7-1 |