Return to DOE Report Table of Contents

Return to Early Entrance Table of Contents

Early Entrance Co-Production Plant - Decentralized Gasification Cogeneration Transportation Fuels and Steam From Available Feedstocks
Quarterly Technical Progress Report July to September 2001- 2001

Table of Contents 155kb

Section 1
974kb

1

Introduction and Summary 1-1
 

1.1

Introduction 1-1
  1.1.1 Phase I - Concept Definition and RD&T Planning 1-1
1.1.2 Phase II - R&D and Testing 1-1
1.1.3 Phase III - Preliminary Engineering Design 1-2

1.2

Summary 1-2

2

Phase I Task 3 - System Technical Assessment 2-1
 

2.1

Ash Fusion Temperature Prediction for EECP Coal Feeds 2-1
  2.1.1 Summary of Results and Applications 2-1
2.1.2 Methodology Review and Ash Fusion Temperature Correlations 2-4
Section 2
131kb
  2.1.2.1 Coal Ash Fusion Data 2-5
Section 3
528kb
2.1.2.2 Correlation Assessment and Accuracy 2-9
  Pennsylvania Coal 2-10
Section 4
677kb
Other Coal Samples 2-12
Section 5
1008kb
EECP Coal Feeds 2-14
EECP Blended Feeds 2-16
Section 6
123kb

2.1.3

Conclusion 2-17

2.2

Preliminary EECP Plant Balances 2-19
  2.2.1 EECP Configuration 2-19
Section 7
440kb
2.2.2 Preliminary EECP Plant Balance Summary 2-21
3 Phase I Task 4 - Feasibility Design Package Development 3-1
4 Phase I Task 5 - Market Analysis 4-1
5 Phase I Task 6 - Preliminary Site Analysis 5-1
 

5.1

EECP Large Vessel Transportation Assessment 5-1
  5.1.1 Proposed EECP Site Location and Conditions 5-1
Section 8
221kb
5.1.2 Summary Results 5-4

5.2

Transportation 5-4
  5.2.1 Site Access by Truck 5-4
5.2.2 Site Access by Rail 5-5
5.2.3 Site Access by Barge 5-5
5.2.4 Ports of Import 5-6

5.3

Reactor and Transportation Cost Estimates 5-6

6

Project Management 6-1
  6.1 Biweekly Project Status Report 6-1
6.2 Project Milestones Plan and Log 6-1

7

Experimental 7-1
  7.1 Executive Summary 7-1
7.2 Experimental 7-1
7.3 Results and Discussion 7-1
7.4 Conclusion 7-1
7.5 References 7-1