Power Systems Development Facility: Commissioning Report of M. W. Kellogg Transport Reactor Train, Westinghouse Particulate Control Device, and Associated Balance-Of-Plant Equipment - September 1995 to December 1996 (Volume I)

Southern Company Services, Inc.

Section 1 is pages 1-80 and is 4.23MB.

Section 2 is pages 81-161 and is 2.81MB.

Section 3 is pages 162-242 and is 3.01MB.

Section 4 is pages 243-323 and is 2.56MB.

Section 5 is pages 324-404 and is 3.14MB.

Section 6 is pages 405-485 and is 3.29MB.

Section 7 is pages 486-566 and is 3.52MB.

Section 8 is pages 567-667 and is 3.98MB.

Section 9 is pages 668-798 and is 5.56MB.

Table of Contents

Title Page
Inside Cover
Disclaimer
Acknowledgements
 
VOLUME 1
 
Listing of Tables and Figures

vii

1.0

EXECUTIVE SUMMARY 1.0-1

2.0

INTRODUCTION 2.1-1
 

2.1

The Power Systems Development Facility 2.1-1

2.2

Transport Reactor System Description 2.2-1

2.3

Westinghouse Particulate Control Device 2.3-1

2.4

Balance-of-Plant 2.4-1

3.0

SCHEDULE OF PSDF START-UP/COMMISSIONING ACTIVITIES 3.0-1

4.0

DESIGN, PROCUREMENT, AND INSTALLATION 4.1-1
 

4.1

Conceptual Design 4.1-1
 

4.1.1

Transport Reactor Train 4.1.1-1

4.1.2

Balance-of-Plant 4.1.2-1

4.2

Procurement 4.2.1-1
 

4.2.1

Transport Reactor Train 4.2.1-1

4.2.2

Balance-of-Plant 4.2.2-1

4.3

Installation 4.3-1

5.0

COMMISSIONING OF M.W. KELLOGG TRANSPORT REACTOR TRAIN 5.1.1-1
 

5.1

Transport Reactor Loop 5.1.1-1
 

5.1.1

Commissioning Test Run CR01 5.1.1-1

5.1.2

Commissioning Test Run CR02 5.1.2-1