Return to DOE Report Table of Contents
Return to Power Systems Development
Facility Table of Contents
Power Systems Development Facility: Commissioning Report of M.
W. Kellogg Transport Reactor Train, Westinghouse Particulate Control Device, and
Associated Balance-Of-Plant Equipment - September 1995 to December 1996 (Volume
I)
Southern Company Services, Inc.
Section 1 is pages 1-80 and
is 4.23MB.
Section 2 is pages 81-161 and
is 2.81MB.
Section 3 is pages 162-242 and
is 3.01MB.
Section 4 is pages 243-323 and
is 2.56MB.
Section 5 is pages 324-404 and
is 3.14MB.
Section 6 is pages 405-485 and
is 3.29MB.
Section 7 is pages 486-566 and
is 3.52MB.
Section 8 is pages 567-667 and
is 3.98MB.
Section 9 is pages 668-798 and
is 5.56MB.
Table of Contents
Title Page |
Inside Cover |
Disclaimer |
Acknowledgements |
|
VOLUME 1 |
|
Listing of Tables and Figures |
vii |
1.0 |
EXECUTIVE SUMMARY |
1.0-1 |
2.0 |
INTRODUCTION |
2.1-1 |
|
2.1 |
The Power Systems Development Facility |
2.1-1 |
2.2 |
Transport Reactor System Description |
2.2-1 |
2.3 |
Westinghouse Particulate Control Device |
2.3-1 |
2.4 |
Balance-of-Plant |
2.4-1 |
3.0 |
SCHEDULE OF PSDF START-UP/COMMISSIONING
ACTIVITIES |
3.0-1 |
4.0 |
DESIGN, PROCUREMENT, AND INSTALLATION |
4.1-1 |
|
4.1 |
Conceptual Design |
4.1-1 |
|
4.1.1 |
Transport Reactor Train |
4.1.1-1 |
4.1.2 |
Balance-of-Plant |
4.1.2-1 |
4.2 |
Procurement |
4.2.1-1 |
|
4.2.1 |
Transport Reactor Train |
4.2.1-1 |
4.2.2 |
Balance-of-Plant |
4.2.2-1 |
4.3 |
Installation |
4.3-1 |
5.0 |
COMMISSIONING OF M.W. KELLOGG TRANSPORT
REACTOR TRAIN |
5.1.1-1 |
|
5.1 |
Transport Reactor Loop |
5.1.1-1 |
|
5.1.1 |
Commissioning Test Run CR01 |
5.1.1-1 |
5.1.2 |
Commissioning Test Run CR02 |
5.1.2-1 |
|