Inside Cover |
Disclaimer |
Abstract |
Acknowledgement |
|
Listing of Tables and Figures |
iii |
|
1.0 |
EXECUTIVE SUMMARY |
1.1-1 |
|
1.1 |
Summary |
1.1-1 |
1.2 |
PSDF Accomplishments |
1.2-1 |
|
1.2.1 |
Transport Reactor Train |
1.2-1 |
1.2.2 |
Particulate Control Device |
1.2-4 |
1.3 |
Future Plans |
1.3-1 |
|
2.0 |
INTRODUCTION |
2.1-1 |
|
2.1 |
The Power Systems Development Facility |
2.1-1 |
2.2 |
Transport Reactor System Description |
2.2-1 |
2.3 |
Siemens Westinghouse Particulate Control Device |
2.3-1 |
2.4 |
Operation Status |
2.4-1 |
|
3.0 |
PARTICLE FILTER SYSTEM |
3.1-1 |
|
3.1 |
TC06 Run Overview |
3.1-1 |
3.2 |
TC06 Run Report |
3.2-1 |
|
3.2.1 |
Introduction |
3.2-1 |
3.2.2 |
Test Objectives |
3.2-1 |
3.2.3 |
Observations/Events - July 6, 2001, Through
September 25, 2001 |
3.2-2 |
3.2.4 |
Run Summary and Analysis |
3.2-9 |
3.3 |
TC06 Inspection Report |
3.3-1 |
|
3.3.1 |
Introduction |
3.3-1 |
3.3.2 |
TC06A Inspection |
3.3-1 |
|
3.3.2.1 |
TC06A Filter Elements |
3.3-1 |
3.3.2.2 |
TC06A G-ash Deposition |
3.3-3 |
3.3.2.3 |
TC06A Filter Element Gaskets |
3.3-4 |
3.3.2.4 |
TC06A Failsafes |
3.3-5 |
3.3.2.5 |
TC06A Auxiliary Equipment |
3.3-5 |
3.3.2.6 |
TC06A Solids Removal Equipment |
3.3-5 |
3.3.3 |
TC06B Inspection |
3.3-6 |
|
3.3.3.1 |
TC06B G-ash Deposition |
3.3-6 |
3.3.3.2 |
TC06B Filter Elements |
3.3-8 |
3.3.3.3 |
TC06B Filter Element Gaskets |
3.3-8 |
3.3.3.4 |
TC06B Failsafes |
3.3-9 |
3.3.3.5 |
TC06B Auxiliary Equipment |
3.3-10 |
3.3.3.6 |
TC06B Fine Solids Removal System Inspection |
3.3-10 |
3.4 |
TC06 G-ash Characteristics and PCD Performance |
3.4-1 |
|
3.4.1 |
In situ Sampling |
3.4-1 |
|
3.4.1.1 |
PCD Inlet Particle Mass Concentrations |
3.4-1 |
3.4.1.2 |
PCD Outlet Particle Mass Concentrations |
3.4-2 |
3.4.1.3 |
Tar Contamination |
3.4-2 |
3.4.1.4 |
Syngas Moisture Content |
3.4-2 |
3.4.2 |
PCD Dustcakes and Consolidated Deposits |
3.4-3 |
3.4.3 |
Physical Properties of In situ Samples and Dustcakes |
3.4-4 |
|
3.4.3.1 |
In situ Particulate Samples |
3.4-4 |
3.4.3.2 |
Dustcake Samples |
3.4-5 |
3.4.4 |
Particle-Size Analysis of the In situ Samples and
Dustcakes |
3.4-6 |
3.4.5 |
Laboratory Drag Characteristics of G-ash |
3.4-6 |
3.4.6 |
Analysis of PCD Pressure Drop |
3.4-8 |
|
3.4.6.1 |
PCD Transient ΔP Analysis |
3.4-8 |
3.4.6.2 |
PCD Baseline ΔP Analysis |
3.4-9 |
3.4.7 |
Real-Time Particulate Monitor Evaluation |
3.4-10 |
3.4.8 |
Conclusions |
3.4-10 |
3.5 |
Test Results for Filter Elements |
3.5-1 |
|
3.5.1 |
Pall Fe3Al |
3.5-1 |
3.5.2 |
Schumacher T10-20 |
3.5-3 |
3.5.3 |
Pall 326 |
3.5-4 |
3.5.4 |
Conclusions |
3.5-4 |
|
4.0 |
TRANSPORT REACTOR |
4.1-1 |
|
4.1 |
Transport Reactor TC06 Run Summary |
4.1-1 |
4.2 |
Gasifier Operational Analysis |
4.2-1 |
4.3 |
Gas Analysis |
4.3-1 |
4.4 |
Solids Analyses |
4.4-1 |
4.5 |
Mass and Energy Balances |
4.5-1 |
4.6 |
Sulfator Operations |
4.6-1 |
4.7 |
Process Gas Coolers |
4.7-1 |
|
TERMS |
PSDF Terms-1 |