Part 1 |
Section I – Executive Summary and Project Overview |
Executive Summary |
ES-1 |
i. |
General |
ES-1 |
ii. |
Process Overview |
ES-1 |
iii. |
Operating Overview |
ES-3 |
iv. |
Significant Findings and Modifications |
ES-5 |
Environmental |
ES-6 |
Air Separation Unit |
ES-7 |
Coal Handling |
ES-7 |
Gasification |
ES-8 |
High Temperature Heat Recovery |
ES-9 |
Particulate Removal |
ES-9 |
Low Temperature Heat Recovery |
ES-10 |
Acid Gas Removal |
ES-11 |
v. |
Plant Performance |
ES-11 |
vi. |
Economics and Commercialization |
ES-13 |
vii. |
Conclusions |
ES-16 |
1.0 |
Introduction |
1-1 |
1.1 |
Objectives |
1-3 |
1.2 |
General |
1-5 |
1.3 |
Project Phase Description |
1-8 |
1.3.1 |
Phase 1 Activities – Engineering and Procurement |
1-8 |
1.3.2 |
Phase 2 Activities – Construction |
1-9 |
1.3.3 |
Phase 3 Activities – Demonstration Period |
1-10 |
1.4 |
Project Organization |
1-11 |
1.5 |
Project Location and Original Equipment Description |
1-12 |
1.6 |
Permitting and Environmental Activities |
1-14 |
2.0 |
Technology Description |
2-1 |
3.0
|
Detailed Process Description |
3-1 |
3.1 |
Air Separation Unit |
3-2 |
3.2 |
Coal Handling |
3-3 |
3.3 |
Gasification |
3-4 |
3.3.1 |
Gasification and Slag Handling |
3-4 |
3.3.2 |
Syngas Cooling, Particulate Removal |
3-6 |
3.3.3 |
Low Temperature Heat Recovery, Chloride Scrubbing, and Syngas Moisturization |
3-7 |
3.3.4 |
Acid Gas Removal |
3-8 |
3.3.5 |
Sulfur Recovery |
3-9 |
3.3.6 |
Sour Water Treatment |
3-10 |
3.4 |
Power Block |
3-11 |
Section II – Operations and Economics |
4.0 |
Demonstration Period |
4-1 |
4.1 |
Operation, Maintenance, and Technical Impacts |
4-2 |
4.1.1 |
Air Separation Unit |
4-7 |
4.1.2 |
Coal Handling |
4-15 |
4.1.3 |
Gasification |
4-20 |
4.1.3.1 |
Gasification and Slag Handling |
4-20 |
4.1.3.2 |
Syngas Cooling, Particulate Removal and COS Hydrolysis |
4-32 |
4.1.3.3 |
Low Temperature Heat Recovery and Syngas Moisturization |
4-48 |
4.1.3.4 |
Acid Gas Removal |
4-53 |
4.1.3.5 |
Sulfur Recovery |
4-58 |
4.1.3.6 |
Sour Water Treatment |
4-65 |
4.1.4 |
Power Block |
4-68 |
4.2 |
General Information |
4-71 |
4.2.1 |
Stream Data |
4-71 |
4.2.2 |
Alternative Fuel Testing |
4-74 |
4.3 |
Critical Component Failure Report |
4-85 |
Part 2 |
|
Technical Performance |
5-1 |
5.1 |
Air Separation Unit |
5-4 |
5.1.1 |
Air Compression System |
5-4 |
5.1.1.1 |
System Modifications |
5-5 |
5.1.1.2 |
Operating Experience Overview |
5-7 |
5.1.1.3 |
Summary and Conclusions |
5-8 |
5.1.2 |
Water Wash System |
5-12 |
5.1.2.1 |
System Modifications |
5-13 |
5.1.2.2 |
Operating Experience Overview |
5-13 |
5.1.2.3 |
Summary and Conclusions |
5-14 |
5.1.3 |
Air Purification System |
5-15 |
5.1.3.1 |
System Modifications |
5-16 |
5.1.3.2 |
Operating Experience Overview |
5-16 |
5.1.3.3 |
Summary and Conclusions |
5-18 |
5.1.4 |
Air Cooling and Liquefaction |
5-21 |
5.1.4.1 |
System Modifications |
5-22 |
5.1.4.2 |
Operating Experience Overview |
5-24 |
5.1.4.3 |
Summary and Conclusions |
5-24 |
5.1.5 |
Cryogenic Distillation System |
5-27 |
5.1.5.1 |
System Modifications |
5-28 |
5.1.5.2 |
Operating Experience Overview |
5-28 |
5.1.5.3 |
Summary and Conclusions |
5-30 |
5.1.6 |
Oxygen Mixing System |
5-32 |
5.1.6.1 |
System Modifications |
5-33 |
5.1.6.2 |
Operating Experience Overview |
5-33 |
5.1.6.3 |
Summary and Conclusions |
5-35 |
5.1.7 |
Nitrogen Handling and Storage System |
5-36 |
5.1.7.1 |
System Modifications |
5-38 |
5.1.7.2 |
Operating Experience Overview |
5-38 |
5.1.7.3 |
Summary and Conclusions |
5-38 |
5.1.8 |
Oxygen Compression System |
5-42 |
5.1.8.1 |
System Modifications |
5-42 |
5.1.8.2 |
Operating Experience Overview |
5-44 |
5.1.8.3 |
Summary and Conclusions |
5-46 |
5.2 |
Coal Handling |
5-48 |
5.2.1 |
Coal Hopper System |
5-48 |
5.2.1.1 |
System Modifications |
5-13 |
5.2.1.2 |
Operating Experience Overview |
5-13 |
5.2.1.3 |
Summary and Conclusions |
5-14 |
5.2.2 |
Rod Mill System |
5-51 |
5.2.2.1 |
System Modifications |
5-52 |
5.2.2.2 |
Operating Experience Overview |
5-53 |
5.2.2.3 |
Summary and Conclusions |
5-54 |
5.2.3 |
Slurry Storage Tank System |
5-56 |
5.2.3.1 |
System Modifications |
5-57 |
5.2.3.2 |
Operating Experience Overview |
5-57 |
5.2.3.3 |
Summary and Conclusions |
5-57 |
5.2.4 |
Slurry Feed System |
5-58 |
5.2.4.1 |
System Modifications |
5-58 |
5.2.4.2 |
Operating Experience Overview |
5-59 |
5.2.4.3 |
Summary and Conclusions |
5-60 |
5.3 |
Gasification |
5-61 |
5.3.1 |
First Stage Gasifier System |
5-61 |
5.3.1.1 |
System Modifications |
5-62 |
5.3.1.2 |
Operating Experience Overview |
5-63 |
5.3.1.3 |
Summary and Conclusions |
5-65 |
5.3.2 |
Second Stage Gasifier System |
5-68 |
5.3.2.1 |
System Modifications |
5-68 |
5.3.2.2 |
Operating Experience Overview |
5-69 |
5.3.2.3 |
Summary and Conclusions |
5-70 |
5.3.3 |
Raw Syngas Conditioning System |
5-71 |
5.3.3.1 |
System Modifications |
5-71 |
5.3.3.2 |
Operating Experience Overview |
5-72 |
5.3.3.3 |
Summary and Conclusions |
5-73 |
5.3.4 |
Slag and Solids Handling System |
5-74 |
5.3.4.1 |
System Modifications |
5-76 |
5.3.4.2 |
Operating Experience Overview |
5-76 |
5.3.4.3 |
Summary and Conclusions |
5-78 |
5.3.5 |
Syngas Cooling/Steam Generation System |
5-79 |
5.3.5.1 |
System Modifications |
5-80 |
5.3.5.2 |
Operating Experience Overview |
5-82 |
5.3.5.3 |
Summary and Conclusions |
5-83 |
5.3.6 |
Particulate Removal System |
5-84 |
5.3.6.1 |
System Modifications |
5-84 |
5.3.6.2 |
Operating Experience Overview |
5-88 |
5.3.6.3 |
Summary and Conclusions |
5-91 |
5.3.7 |
Chloride Scrubbing System |
5-93 |
5.3.7.1 |
System Modifications |
5-94 |
5.3.7.2 |
Operating Experience Overview |
5-94 |
5.3.7.3 |
Summary and Conclusions |
5-96 |
5.3.8 |
COS Hydrolysis System |
5-97 |
5.3.8.1 |
System Modifications |
5-97 |
5.3.8.2 |
Operating Experience Overview |
5-97 |
5.3.8.3 |
Summary and Conclusions |
5-99 |
5.3.9 |
Low Temperature Heat Recovery System |
5-100 |
5.3.9.1 |
System Modifications |
5-100 |
5.3.9.2 |
Operating Experience Overview |
5-102 |
5.3.9.3 |
Summary and Conclusions |
5-105 |
5.3.10 |
Syngas Moisturization System |
5-106 |
5.3.10.1 |
System Modifications |
5-106 |
5.3.10.2 |
Operating Experience Overview |
5-106 |
5.3.10.3 |
Summary and Conclusions |
5-107 |
5.3.11 |
Acid Gas Removal System |
5-108 |
5.3.11.1 |
System Modifications |
5-109 |
5.3.11.2 |
Operating Experience Overview |
5-113 |
5.3.11.3 |
Summary and Conclusions |
5-116 |
5.3.12 |
Sulfur Recovery System |
5-118 |
5.3.12.1 |
System Modifications |
5-119 |
5.3.12.2 |
Operating Experience Overview |
5-123 |
5.3.12.3 |
Summary and Conclusions |
5-131 |
5.3.13 |
Sour Water Treatment System |
5-133 |
5.3.13.1 |
System Modifications |
5-134 |
5.3.13.2 |
Operating Experience Overview |
5-135 |
5.3.13.3 |
Summary and Conclusions |
5-139 |
5.3.14 |
Cooling Tower System |
5-141 |
5.3.14.1 |
System Modifications |
5-142 |
5.3.14.2 |
Operating Experience Overview |
5-142 |
5.3.14.3 |
Summary and Conclusions |
5-143 |
5.4 |
Power Block |
5-144 |
5.4.1 |
Combustion Turbine |
5-144 |
5.4.1.1 |
System Modifications |
5-145 |
5.4.1.2 |
Operating Experience Overview |
5-145 |
5.4.1.3 |
Summary and Conclusions |
5-146 |
5.4.2 |
Heat Recovery Steam Generator |
5-148 |
5.4.2.1 |
System Modifications |
5-148 |
5.4.2.2 |
Operating Experience Overview |
5-148 |
5.4.2.3 |
Summary and Conclusions |
5-148 |
5.4.3 |
Water Treatment/Handling System |
5-150 |
5.4.3.1 |
System Modifications |
5-150 |
5.4.3.2 |
Operating Experience Overview |
5-150 |
5.4.3.3 |
Summary and Conclusions |
5-151 |
5.4.4 |
Steam Turbine |
5-152 |
5.4.4.1 |
System Modifications |
5-152 |
5.4.4.2 |
Operating Experience Overview |
5-152 |
5.4.4.3 |
Summary and Conclusions |
5-152 |
6.0 |
Environmental Performance |
6-1 |
6.1 |
Non-Proprietary Streams |
6-4 |
6.2 |
Conclusions |
6-18 |
6.2.1 |
Process Waste and Waste Water |
6-18 |
6.2.2 |
Air Emissions |
6-19 |
7.0 |
Economics |
7-1 |
7.1 |
Actual Installed Costs for Wabash River |
7-1 |
7.2 |
Forecast Costs for Year 2000 Installation |
7-5 |
7.3 |
Operational Costs |
7-6 |
7.3.1 |
Fuel Cost |
7-6 |
7.3.2 |
Non-Fuel Operation and Maintenance Costs |
7-6 |
7.4 |
Economic Analysis |
7-7 |
7.4.1 |
Historical Perspective |
7-7 |
7.4.2 |
Evaluation of Future Power Generation Projects |
7-7 |
Section III – Commercialization and Recommendations |
8.0 |
Commercialization Potential and Plans |
8-1 |
9.0 |
Conclusions and Recommendations |
9-1 |
9.1 |
Success of the Demonstration Project |
9-1 |
9.2 |
Commercialization Barriers and Areas of Recommended Research |
9-5 |
9.3 |
Outlook |
9-9 |