Return to DOE Report Table of Contents

Return to Wabash River Coal Gasification Repowering Project Table of Contents

Wabash River Coal Gasification Repowering Project:
A DOE Assessment - January 2002

National Energy Technology Laboratory

In the pdf format this document has 42 pages and is 283kb.

Table of Contents

Executive Summary

5

I

Introduction 10

II

Project/Process Description 11
 

II.A

Project Description 11

II.B

Need for the Technology Demonstration 14

II.C

Promise of the Technology 14

II.D

Technology Description 14
 

II.D.1

Coal Handling 14

II.D.2

Air-Separation Unit 15

II.D.3

E-Gas Gasifier 15

II.D.4

Syngas Conditioning/Cleanup 17

II.D.5

Power Block 20

II.E

Project Implementation 20

II.F

Project Objective and Statement of Work 21

III

Technical and Environmental Review 24
 

III.A

Technical Results 24
 

III.A.1

Air-Separation Unit 25

III.A.2

Coal Handling 26

III.A.3

Gasification 27

III.A.4

Syngas Cooling and Particulate Removal 27

III.A.5

Chloride Scrubbing System and COS Hydrolysis 28

III.A.6

Low-Temperature Heat Recovery and Syngas Humidification 28

III.A.7

Acid-Gas Removal, Sulfur Recovery, and Sour-Water Stripping 29

III.A.8

Power Block 29

III.A.9

Operations Feeding Petroleum Coke 29

III.B

Environmental Performance 33

IV

Market Analysis 35
 

IV.A

Market Size/Commercialization 35

IV.B

Economics 37
 

IV.B.1

Capital Costs 37

IV.B.2

Operating Costs 37

IV.B.3

Cost of Electricity 37

V

Conclusions 39